This file contains a Work Breakdown Structure (WBS) spreadsheet and draft solicitation for environmental remediation and support services at the Luckey site in Wood County, Ohio.

The WBS spreadsheet provides a template for offerors to propose pricing for Task 1, which includes mobilization, submittals, temporary facility construction, and utility setup. It includes tables to identify labor categories and rates, subcontractors, other direct costs, travel, materials, equipment, and a total price. Additional tables define burdened labor rates and provide templates to identify materials, travel parameters, other direct costs, equipment, and justify costs.

The draft solicitation seeks comments by March 5th for remediation and support services at the Luckey site, owned by the US Army Corps of Engineers Buffalo District. The 40-acre site requires excavation, transport, and disposal of contaminated soils, sediments and materials. Additional requirements include site maintenance, security, project management, construction quality assurance, air monitoring, sampling, laboratory services, stormwater/wastewater control, well decommissioning and installation, and compliance sampling. Material management will require strict control. The final RFP is anticipated for late April 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Luckey Remediation Services, newest first.
File Type Posted
Draft RFP Questions and Answers 07 Apr 2020.xlsx XLSX spreadsheet
DRAFT Solicitation W912P420R0004.pdf PDF
Attachment 7_Bid Schedule.pdf PDF
Attachment 10_Past Performance Questionnaire.pdf PDF
Attachment 1_Performance Work Statement.pdf PDF
Attachment 9_Sample Letter of Commitment to Use Subcontractor.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary-Task 1-WBS 331XX01 PRICING SUMMARY Dollars

Labor
Subcontractor
Travel
ODCs
Materials
Equipment
SUBTOTAL
M&S Burden (if applicable)
G&A
SUBTOTAL
Fee
TOTAL TASK 1, WBS 331XX01 (MOBILIZATION) PRICE

Task 1-WBS 331XX01 Detail

PWS TASK 1 (WBS 331XX01 - Mobilization and Preparatory Work)
WBS 331XX0101 - Mobilization of Construction Equipment and FacilitiesWBS 331XX0103 - Submittals/Implementation PlansWBS 331XX0104 - Setup/Construct Temporary FacilitiesWBS 331XX0105 - Construct Temporary Utilities
Labor - Prime
Labor Categories (Site)HoursHourly Labor RateCostHoursHourly Labor RateCostHoursHourly Labor RateCostHoursHourly Labor RateCost
Total Cost
Fee
Total Price
Labor - Sub
Subcontractor #1 Name
Labor Categories (Site)HoursHourly Labor RateCostHoursHourly Labor RateCostHoursHourly Labor RateCostHoursHourly Labor RateCost
Subcontractor #2 Name
Labor Categories (Site)HoursHourly Labor RateCostHoursHourly Labor RateCostHoursHourly Labor RateCostHoursHourly Labor RateCost
Subtotal
M&S Burden (if applicable)
G&A
Total Cost
Fee
Total Price
ODCs
ODC-High Risk ODCs (Example)
ODC-Shipping (Example)
ODC-Software (Example)
Total ODCs-NO FEE
Subtotal
G&A
Total Cost
Travel
Travel Costs
Subtotal
G&A
Total Cost
Materials
Materials - Misc. Materials (Example)
Material - Sensors (Example)
Total Materials
Subtotal
M&S Burden (if applicable)
G&A
Total Cost
Equipment
Equipment - Excavator (Example)
Total Equipment
Subtotal
G&A
Total Cost

TOTAL TASK 1 - MOBILIZATION PRICE

Labor Categories Breakout Labor Categories Labor Categories Description Labor Categories Qualifications

Labor Rates Breakout INSTRUCTIONS - Complete the table below to show how you reached your burdened labor rate (excluding fee). You may add columns on the spreadsheet for other indirect costs not already identified in the table, in accordance with your approved accounting system. INSTRUCTIONS - Complete the table below to show how you reached your burdened labor rate (excluding fee). You may add columns on the spreadsheet for other indirect costs not already identified in the table, in accordance with your approved accounting system.

CPFF BURDENED (WITHOUT FEE) HOURLY LABOR RATES - (GOVERNMENT SITE)CPFF BURDENED (WITHOUT FEE) HOURLY LABOR RATES - (CONTRACTOR SITE)
Labor CategoryUnloaded Labor RateOverhead RateFringeSubtotalG&ALoaded Labor Rate (Excluding Fee)Labor CategoryUnloaded Labor RateOverhead RateFringeSubtotalG&ALoaded Labor Rate (Excluding Fee)

Bill of Materials

MaterialCost
1 - Material #1 (Example)$XX.XX
2 - Material #2 (Example)$XX.XX
**A bill of materials shall be provided to justify the cost of materials proposed for this task area.

Travel Breakout

ESTIMATING PARAMETERS:
Auto Rental: $30/day CONUS ($100/day OCONUS)Mileage: $0.54/mileMiscellaneous Expenses (Airport Parking, etc.): $15/day/personPer Diem: Includes meals, incidental expenses & lodgingBaggage Charge: $25/per bag each way
TRAVEL FROMTRAVEL TOAIRFARE ($)# OF BAGS# OF TRIPS# OF PEOPLE# OF DAYS# OF NIGHTS# OF CARS# OF ROUNDTRIP MILESPER DIEM LODGING ($)PER DIEM M&IE ($)M&IE (FIRT/LAST DAYS) ($)PURPOSE
TOTAL AIRFARE ($)TOTAL BAGGAGE FEES ($)TOTAL AUTO RENTAL ($)TOTAL MISCELLANEOUS EXPENSES ($)TOTAL MILEAGE EXPENSES ($)LODGING TOTAL ($)M&IE TOTAL ($)M&IE (FIRST/LAST DAYS TOTAL) ($)COMMUNICATION TOTAL ($)TOTAL TRAVEL COST ($)

ODC Breakout

ODCsCost
1 - ODC #1 (Example)$XX.XX
2 - ODC #2 (Example)$XX.XX
**A breakout of the ODCs shall be provided to justify the total ODCs proposed for this task area.

Equipment Breakout

EquipmentCost
1 - Equipment #1 (Example)$XX.XX
2 - Equipment #2 (Example)$XX.XX
**A detailed list of equipment shall be provided to justify the cost of equipment proposed for this task area.