Attachment 7_Bid Schedule.pdf
PDF 133 KB Posted
- Attached to
- Luckey Remediation Services Federal contract opportunity
- Solicitation number
- W912P420R0004
About this file
This document includes a bid schedule attachment and presolicitation notice for a federal contract opportunity. The bid schedule attachment provides pricing templates for contractors to submit proposed costs for soil remediation services at the Luckey FUSRAP Site in Ohio. Primary tasks include excavating and disposing of contaminated soils from five trenches and other areas, along with associated sampling, testing, and waste transportation and disposal. Optional additional tasks involve deconstructing various on-site buildings. The presolicitation notice provides further details on the contaminated site history and outlines the scope of work for the remediation services project. Comments on the draft solicitation were due by March 5, 2020, with the final RFP anticipated for release in late April 2020. The contracting agency is the U.S. Army Corps of Engineers Buffalo District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft RFP Questions and Answers 07 Apr 2020.xlsx | XLSX spreadsheet | |
| Attachment 8_WBS Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 9_Sample Letter of Commitment to Use Subcontractor.docx | DOCX document | |
| DRAFT Solicitation W912P420R0004.pdf | ||
| Attachment 10_Past Performance Questionnaire.pdf | ||
| Attachment 1_Performance Work Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7
Bid Schedule
[This page intentionally left blank]
Luckey FUSRAP Site Performance Work Statement for Remediation of Soils Operable Unit
Contract W912P420R0004
Sheet 1 of 5
Activity Description Unit Quantity Unit Cost Bid Amount
Task 1 - Mobilization 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$
Task 2a Soil Remediation (Trenches 1 and 2) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$ 331XX03 Site Work JOB 1 -$ -$ 331XX05 Surface Water Collection and Control JOB 1 -$ -$ 331XX08 Solids Collection and Control JOB 1 -$ -$ 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 -$ -$ 331XX1920 Container Handling JOB 1 -$ -$ 331XX22 General Requirements JOB 1 -$ -$
Subtotal Task 2a -$
Task 2b Soil Remediation (Trench 3) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$ 331XX03 Site Work JOB 1 -$ -$ 331XX05 Surface Water Collection and Control JOB 1 -$ -$ 331XX08 Solids Collection and Control JOB 1 -$ -$ 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 -$ -$ 331XX1920 Container Handling JOB 1 -$ -$ 331XX22 General Requirements JOB 1 -$ -$
Subtotal Task 2b -$
Task 2c Soil Remediation (Trenches 4 and 5) 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$ 331XX03 Site Work JOB 1 -$ -$ 331XX05 Surface Water Collection and Control JOB 1 -$ -$ 331XX08 Solids Collection and Control JOB 1 -$ -$ 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 -$ -$ 331XX1920 Container Handling JOB 1 -$ -$ 331XX22 General Requirements JOB 1 -$ -$
Subtotal Task 2c -$
Task 2d Storage Area 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$ 331XX03 Site Work JOB 1 -$ -$ 331XX05 Surface Water Collection and Control JOB 1 -$ -$ 331XX08 Solids Collection and Control JOB 1 -$ -$ 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 -$ -$ 331XX1920 Container Handling JOB 1 -$ -$ 331XX22 General Requirements JOB 1 -$ -$
Subtotal Task 2d -$
Primary Tasks
Contract W912P420R0004
Sheet 2 of 5
Activity Description Unit Quantity Unit Cost Bid Amount
Task 2e Under Production Building 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$ 331XX03 Site Work JOB 1 -$ -$ 331XX05 Surface Water Collection and Control JOB 1 -$ -$ 331XX08 Solids Collection and Control JOB 1 -$ -$ 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 -$ -$ 331XX1920 Container Handling JOB 1 -$ -$ 331XX22 General Requirements JOB 1 -$ -$
Subtotal Task 2e -$
Task 2f Ditch 331XX02 Monitoring, Sampling, Testing, and Analysis JOB 1 -$ -$ 331XX03 Site Work JOB 1 -$ -$ 331XX05 Surface Water Collection and Control JOB 1 -$ -$ 331XX08 Solids Collection and Control JOB 1 -$ -$ 331XX09 Liquids/Sediments/Sludges Collection and Containment JOB 1 -$ -$ 331XX1920 Container Handling JOB 1 -$ -$ 331XX22 General Requirements JOB 1 -$ -$
Subtotal Task 2f -$
Task 3a Transportation and Disposal (Trenches 1 and 2) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 63,465 -$ -$ 331XX1922 Disposal Fees and Taxes TON 63,465 -$ -$
Subtotal Task 3a -$
Task 3b Transportation and Disposal (Trench 3) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 26,075 -$ -$ 331XX1922 Disposal Fees and Taxes TON 26,075 -$ -$
Subtotal Task 3b -$
Task 3c Transportation and Disposal (Trenches 4 and 5) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 30,147 -$ -$ 331XX1922 Disposal Fees and Taxes TON 30,147 -$ -$
Subtotal Task 3c -$
Task 3d Transportation and Disposal (Storage Area) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 1,356 -$ -$ 331XX1922 Disposal Fees and Taxes TON 1,356 -$ -$
Subtotal Task 3d -$
Contract W912P420R0004
Sheet 3 of 5
Activity Description Unit Quantity Unit Cost Bid Amount
Task 3e Transportation and Disposal (Under Production Building) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 2,855 -$ -$ 331XX1922 Disposal Fees and Taxes TON 2,855 -$ -$
Subtotal Task 3e -$
Task 3f Transportation and Disposal (Ditch) 331XX19 Disposal
331XX1921 Transportation to Storage/Disposal Facility TON 1,598 -$ -$ 331XX1922 Disposal Fees and Taxes TON 1,598 -$ -$
Subtotal Task 3f -$
Task 4 Demobilization 331XX21 Demobilization JOB 1 -$ -$
Total Bid Amount (Primary Tasks) -$
Contract W912P420R0004
Sheet 4 of 5
Activity Description Unit Quantity Unit Cost Bid Amount
Optional Task 5a - Building Deconstruction (Melting, Alloying, & Shipping Building) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5a -$
Optional Task 5b - Building Deconstruction (Laboratory Building) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5b -$
Optional Task 5c - Building Deconstruction (Maintenance Office Building) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5c -$
Optional Task 5d - Building Deconstruction (Main Office Building) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5d -$
Optional Task 5e - Building Deconstruction (Employee Activity Building) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5e -$
Optional Tasks
Contract W912P420R0004
Sheet 5 of 5
Activity Description Unit Quantity Unit Cost Bid Amount
Optional Task 5f - Building Deconstruction (Shack) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5f -$
Optional Task 5g - Building Deconstruction (Small Structures) 331XX01 Mobilization and Prepatory Work JOB 1 -$ -$ 331XX10 Miscellaneous Demolition and Removal JOB 1 -$ -$ 331XX19 Disposal (Commercial)
331XX1920 Container Handling JOB 1 -$ -$ 331XX1921 Transportation to Storage/Disposal Facility JOB 1 -$ -$ 331XX1922 Disposal Fees and Taxes JOB 1 -$ -$
Subtotal Optional Task 5g -$
Total Bid Amount (Optional Tasks)