Vermillion_Repair_Amendment_04_Package_W912P420B0016U00004.pdf

PDF 2 MB Posted

Attached to
Vermilion East Pier Repair
Solicitation number
W912P420B0016
Issued by

About this file

This amendment package modifies the solicitation for repair work to the Vermilion East Pier located in Vermilion, Ohio. The work includes underwater excavation, mass concrete placement, installation of underlayer, armor and cover stones. The period of performance is 318 days for base work and an additional 26 days for optional work, though a waiver is being requested to allow work into fall 2021 and 2022. Bids are due by September 23, 2020. The amendment provides responses to contractor questions, adjusts tolerances, allows vertical construction joints in the mass concrete, clarifies disposal requirements for excavated materials, and updates drawings. The U.S. Army Corps of Engineers is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P420B0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001

- Option C, Line 27, “Survey after underlayer stone placement” has been removed from Bid sheet.

- Pre-bid has been set for 20 August 2020 from 10:00 A.M. Eastern Standard Time till 11:00 A.M.

Eastern Standard Time.

- Call-In Information:

- TELECONFERENCE:

- Call-in: (877) 336-1839

- Access Code: 3856856

- Passcode: 1234

- WEBEX

- https://usace.webex.com/meet/geoffrey.k.hintz

If there are any questions before or after the pre-bid meeting, please e-mail me at Peter.R.Gembala@usace.army.mil or call me at 716-879-4221 by 01 September 2020 03:00 P.M.

Eastern Standatd Time.

Amendment 0002

- 1. Bid Form - Line item "Final After Survey' was added to the base bid and Option "C" for a total of two additional line items.

- 2. Section 01 22 00, Paragraph 1.4.1.1 Payment, added item 'j. Final After Survey'.

- 3. Section 01 35 13 - add the following paragraph at the end of Section 1.

- 4. 1.6 LAKE LEVELS

- To obtain information on lake levels, go to the following website:

- https://www.lre.usace.army.mil/Missions/Great-Lakes-Information/Great-

- Lakes-Water-Levels/Water-Level-Forecast/Monthly-Bulletin-of-Great-Lakes-Water-Levels/

- a. Due to the length of the web address, clicking on the web address will not automatically open a web browser. Copy and paste the web address into a web browser.

- 5. Posting of contractors questions from pre-bid meeting till 24 August 2020.

- 6. Updated Bid sheet.

- 7. Post printable drawings of 65-A-3, 64-B-7 and 64-4-20.

Amendment 0003

1. The Bid date opening has been extend from 16 September 2020 to the new date of 23 September 2020 at 3:00 P.M. Eastern Standard Time.

Call-In Information For Bid opening:

- TELECONFERENCE:

https://usace.webex.com/meet/geoffrey.k.hintz mailto:Peter.R.Gembala@usace.army.mil

- Call-in: (888) 675-2535

- Access Code: 477-6889

- Passcode: 1234

Amendment 0004

See attached Amendment 04 for responses to contractors questions and changes to Plans & Specs.

If there are any questions, please e-mail me at Peter.R.Gembala@usace.army.mil or call me at 716-879-4221.

(End of Provision)

(End of Summary of Changes) mailto:Peter.R.Gembala@usace.army.mil

AMENDMENT NO. 4

VERMILION, OHIO

VERMILION HARBOR EAST PIER REPAIR

UPDATED PLAN AND

SPECIFICATIONS

16 SEPTEMBER 2020

QUESTIONS/ANSWERS FROM 20‐AUG‐2020 PRE‐BID MEETING:

Question #1 Spec section 01 35 13 1.2.1 says 318 days for Base work and 344 days for Option work. If NTP is 10‐5‐20 then with fish windows and optional no work periods, start is 7‐1‐21. The base work number of days does not appear to give you the full work season next year from 7‐1‐21 to 9‐15‐21 to even do the base. The option work is roughly 3 times longer than the base work along the wall.

a. Is the option work an additional 344 days beyond the first 318 days or is that from NTP which would only be an additional 26 days?

b. Can the government re‐evaluate the project calendar for the base period and option to extend this project into two or more work seasons (7‐1 to 9‐ 15 based on the fish windows and optional work periods)?

c. Can the government request a waiver for this project for at least the fall fish window which starts 9‐15 each season, so the work calendar can extend into the fall in 2021 and 2022?

Response a. Days are from Notice to Proceed. Complete the option work in 26 additional days.

b. In section 01 35 13, para. 1.2.1. Item ‘c’ is deleted. The first sentence in Item ‘d’ is changed to read as follows: “The time to complete the work includes a no in‐water work period from the date of the NTP to, and including, 30 June 2021.”

c. The Government is currently in the process of requesting a waiver.

Approval of the waiver is not guaranteed, and all bidders should plan accordingly.

Question #2 Section 01 35 13 1.2.1 Commencement and Schedule. The schedule is very aggressive. Basically, there are 49 days between July 1 August 19 for the base bid and an additional 27 days for all the optional work. Section e says that all work must be completed by September 15, 2021.

a. Question: After September 15th, what is the next available work window?

b. Would liquidated damages be charged through the State of Ohio shut down and subsequently through the winter?

Response a. In accordance with Section 01 35 13 para. 1.2.1(e), all work must be completed no later than 15 September 2021.

b. Liquidated Damages are charged in accordance with FAR 52.211‐12, Liquidated Damages—Construction, when the contracting officer determines that liquidated damages are appropriate for late performance per the contract requirements.

Question #3 Section 03 30 53 3. 1.b Photos of exposed bedrock. Lake Erie and the Vermillion River waters can be clouded with turbidity. Taking photos with suitable clarity maybe difficult.

a. Question: What are the government parameters for photo quality and water clarity?

b. What if the contractor is delayed getting photos because of poor water clarity?

c. How will the contractor be compensated?

Response a. Requirements for the photographs are as described in Section 03 30 53 3.1 to ensure proper surface preparation prior to placement of concrete. A new subparagraph ‘d’ has been added as follows:

“d. If water turbidity precludes obtaining photos or videos with suitable clarity to verify exposed bedrock, the Contractor may propose an alternative method (at no additional expense to the Government) to demonstrate that the surface of the bedrock is acceptable for placement of the mass concrete for Government approval.”

b. The Government will evaluate the photographs. Contractors may propose an alternate method for providing proof that excavation to bedrock was completed.

c. The Government will treat this in the same manner as with any other delay.

All factors of the delay will be used to determine what, if any, compensation will be used.

Question #4 Section 03 30 53 3. 3.1 c. Photos of exposed bedrock. The government has 3 business days to review photos of exposed bedrock prior to placing mass concrete.

The Vermillion River and Lake Erie are both capable of depositing sediments onto a cleaned surface, so time will be of the essence to take advantage of these cleaning activities.

a. Question: Can the time period to review the photos be shortened to reduce the potential for rework is diminished?

b. Also, if the government is tardy with such a decision, and siltation occurs, would that be a change of conditions?

Response a. No.

b. Change of conditions will be governed by FAR 52.243‐4 and any other applicable FAR clauses.

Question #5 Section 3.4 f. Placement of precast blocks. After the govt has accepted the placement of all precast blocks, grout placement can begin.

Question: Do all the blocks need to be poured at the same time, or can incremental quantities be set and approved for grout placement?

Response Section 03 30 53, para 3.4 f. – The item has been changed to read as follows: “After the Government has accepted the placement of any precast blocks, grout placement may begin for those blocks.”

Question #6 Section 31 00 00 Project Survey. If each of the areas required to be surveyed are completed in short sections, will the pay item be used for each incremental survey?

Response Section 01 22 00, para. 1.4.1.1 states that payment will be made for a ‘single survey’ for each type of survey listed. If any of the surveys are performed in short sections (increments), there will be only a single payment for that type of survey.

Question #7 Section 31 32 23 3.1.1 Tolerances for Placing Stone. The existing Cut Stone is shown on the 1960’s repair indicates the size was 3 ton or greater. A 2 x 2 layer of Cut Stones will likely exceed the placement tolerances. Question: Can the placement tolerances for Cut Stone and Armor Stone be widened?

Response Tolerances have been adjusted and are addressed later in this amendment.

Question #8 Section 31 32 23, 3.1.2 b Disposal of materials. The contractor is to dispose of all materials not used, off site, at a location that may legally accept the material.

a. Question: Will the Corps sign a manifest for each load as the generator of the waste?

b. Should the contractor assume the materials to be non-contaminated?

c. If they are found to be contaminated, would that be a change of conditions?

Response a. The Government will sign when it is legally appropriate to do so.

b. The Contractor is responsible to sort excavated material and properly dispose of any waste or contaminated material that may be encountered.

Since any excavated sediment, sand, and soil material is required to remain onsite, there should be little risk with contaminated stone or other materials that may be excess and require offsite disposal.

c. Change of conditions will be governed by FAR 52.243‐4 and any other applicable FAR clauses.

Question #9 Drawing C-301 Cross Sections. There is a note on sections 1+81 & 2+00 regarding excavation to stable slope.

a. Question: Would the pay quantity be applied to all material removed to the stable slope?

b. Also, would siltation of material which may refill an excavated area be a payable quantity?

Response a. Yes, but only what is required to meet the contract requirements.

b. Any siltation caused by not completing the work in a timely manner is the responsibility of the Contractor and no payment will be made for the removal of that material.

Question #10 Drawing C-301 Cross Sections. There is a note to backfill with excavated material after stone placement. Question: If excavated materials are stored elsewhere, can they legally be re-introduced back into the water as backfill?

Response Yes, in accordance with project environmental requirements. Placement of excavated material is addressed later in this amendment.

Question #11 Virtual Pre-Bid. It was mentioned during the virtual pre-bid the Corps would provide contact information for the individuals who could provide land access to the work site. Please send the contact information.

Response Points of Contact are below:

1. Vermilion Lagoons Association Mr. Lee Howley 440‐808‐1600 Lee@howleybread.com <mailto:Lee@howleybread.com>

2. Linwood Park Company Mr. Fred Galovich 412‐860‐1115

1. Section 01 35 13, Paragraph 1.2.2, items (3) and (4). Delete the word ‘continuously from each item to read as shown below:

(3) Perform all under water excavation.

(4) Place the mass concrete. See section 03 30 53 MISCELLANEOUS CAST‐IN‐PLACE CONCRETE

2. Section 03 30 53. Paragraph 3.2, add subparagraph 3.2.6, as shown below:

3.2.6 Construction Joints

Vertical construction joints perpendicular to the face of the existing timber crib may be used.

Joints to be minimum 10 feet apart.

3. Section 31 32 23, Paragraph 3.1.1, the Neatline Tolerance table has been updated with a changed tolerance and added an additional tolerance, to read as shown below:

NEATLINE TOLERANCES

Above Neatline Below Neatline Stone (Inches) (Inches)

Core Stone 3 3

Underlayer 6 0

Armor 18 0

Cover Stone 18 0

4. Section 31 00 00, Paragraph 1.3, item (6). Change the word 'core' to 'underlayer', to read as shown below:

(6) Survey After Underlayer Stone Placement ‐ Perform this survey after the new underlayer stone has been placed.

5. Section 01 22 00 – Paragraph 1.3.3.1 Payment, is changed to the following:

Payment will be made for all materials that were excavated, removed, stockpiled, and not reused. This includes any stone (other than cover stone and core stone disposal which is paid under separate line items) and stone fragments, debris and other removed materials, including but not limited to trees, driftwood, and natural materials, as well as any man‐made or manufactured material such as timbers, concrete, asphalt, brick, piles, etc., and any other materials that the Contracting Officer determines is not suitable for reuse. Disposal is as stated in section 31 32 23. All sand, natural sediments, and soils will be re‐used on‐site.

6. Section 01 22 00 – Paragraph 1.4.9.1, added the word ‘for’ to the second sentence to read as follows:

Included are all costs for disposal off‐site at a location that may legally accept the stone, for all stone not to be re‐used, and all costs associated with any photographs and videos required in section 01 32 16 CONSTRUCTION PROGRESS DOCUMENTATION.

7. Section 31 32 23 – Paragraph 3.1.2 have the following changes

a. Subparagraph ‘b’, items (4) and (5) are changed to read as follows:

(4) Sediments, sand, and soils.

(5) Debris and other removed materials, including but not limited to trees, driftwood, and natural materials, as well as any man‐made or manufactured material such as timbers, concrete, asphalt, brick, piles, etc.

b. Subparagraph ‘d’ is change to read as follows:

d. The Government will inspect all stockpiles to determine if any portion of the stockpile material may be reused. The Contracting Officer will determine the location of the reuse of any material. All excavated materials consisting of sand, sediments, and soils are to remain on site. Use the excavated materials as backfill as indicated on the contract drawings. Place all excess excavated sand, sediment and soil materials in the water, on the east side of the pier, outside the Federal navigation channel, in a manner that does not impede navigation, as directed by the Contracting Officer. Dispose of any other material not directed for reuse, offsite, at a location that may legally accept the material.

8. Sheet G‐002 has been updated. Note 11 has been added. See new amended drawing after this page