Vermillion_Repair_Amendment_02_Package_W912P420B0016U00002.pdf
PDF 3 MB Posted
- Attached to
- Vermilion East Pier Repair
- Solicitation number
- W912P420B0016
About this file
This amendment package pertains to a solicitation for repair work on the east pier in Vermilion, Ohio. The work includes repairs from the end of the pier to station 2+12.2, involving excavation, removal of existing materials, placement of new mass concrete, precast concrete blocks, underlayer stone, armor stone, and other items. Bidders were provided responses to questions from the pre-bid meeting, and the bid form was updated to include additional line items for surveys and a final survey. Options involve additional mass concrete, a new navigation light foundation, and repairs from station 2+12.2 to 3+44.2. The deadline for questions was September 1, 2020. The document provides relevant project details, specifications, drawings, and responses to contractor questions to support bidding on the repair work for the east pier in Vermilion, Ohio.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P420B0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001
- Option C, Line 27, “Survey after underlayer stone placement” has been removed from Bid sheet.
- Pre-bid has been set for 20 August 2020 from 10:00 A.M. East Standard Time till 11:00 A.M. East
Standard Time.
- Call-In Information:
- TELECONFERENCE:
- Call-in: (877) 336-1839
- Access Code: 3856856
- Passcode: 1234
- WEBEX
- https://usace.webex.com/meet/geoffrey.k.hintz
If there are any questions before or after the pre-bid meeting, please e-mail me at Peter.R.Gembala@usace.army.mil or call me at 716-879-4221 by 01 September 2020 03:00 P.M. East Standatd Time.
Amendment 0002
- 1. Bid Form - Line item "Final After Survey' was added to the base bid and Option "C" for a total of two additional line items.
- 2. Section 01 22 00, Paragraph 1.4.1.1 Payment, added item 'j. Final After Survey'.
- 3. Section 01 35 13 - add the following paragraph at the end of Section 1.
- 4. 1.6 LAKE LEVELS
- To obtain information on lake levels, go to the following website:
- https://www.lre.usace.army.mil/Missions/Great-Lakes-Information/Great-
- Lakes-Water-Levels/Water-Level-Forecast/Monthly-Bulletin-of-Great-Lakes-Water-Levels/
- a. Due to the length of the web address, clicking on the web address will not automatically open a web browser. Copy and paste the web address into a web browser.
- 5. Posting of contractors questions from pre-bid meeting till 24 August 2020.
- 6. Updated Bid sheet.
- 7. Post printable drawings of 65-A-3, 64-B-7 and 64-4-20.
(End of Provision)
(End of Summary of Changes) https://usace.webex.com/meet/geoffrey.k.hintz mailto:Peter.R.Gembala@usace.army.mil
AMENDMENT NO. 2
VERMILION, OHIO
VERMILION HARBOR EAST PIER REPAIR
UPDATED BID FORM AND
SPECIFICATIONS
17 AUGUST 2020
Items updated for Amendment No.2
1.Bid Form - Line item "Final After Survey' was added to the base bid and Option "C" for a total of two additional line items.
2.Section 01 22 00, Paragraph 1.4.1.1 Payment, added item 'j. Final After Survey'.
3.Section 01 35 13 - add the following paragraph at the end of Section 1.
1.6 LAKE LEVELS
To obtain information on lake levels, go to the following website:
https://www.lre.usace.army.mil/Missions/Great-Lakes-Information/Great-
Lakes-Water-Levels/Water-Level-Forecast/Monthly-Bulletin-of-Great-Lakes-
Water-Levels/
a. Due to the length of the web address, clicking on the web address will not automatically open a web browser. Copy and paste the web address into a web browser.
SECTION 00 10 00
BIDDING SCHEDULE
VERMILION HARBOR, EAST PIER, VERMILION, OHIO
Item Estimated Unit No. Description Quantity Unit Price
Estimated Amount
1 Mobilization and
Demobilization 1 JA $
Repair From End of Pier to Sta. 2+12.2 And All Concrete From End of Pier to Sta. 2+16.2
2 Closeout Submittals (As-built and Record Drawings and files)
1 JA $
3 Before Survey of Pier 1 EA $ $
4 Excavation, Removals, Stockpiling
1872 CY $ $
5 Survey After Excavation and Removals
1 EA $ $
6 Mass Concrete with Dowels 263 CY $ $
7 Survey After Mass Concrete Placement
1 EA $ $
8 Precast Concrete Blocks with Grout
35 CY $ $
9 Survey After Precast Concrete Blocks Placement
1 EA $ $
10 New Underlayer Stone Placement 384 TN $ $
11 Survey After Underlayer Stone Placement
1 EA $ $
12 Unused Core Stone Disposal 282 TN $ $
13 New Armor Stone Placement 1375 TN $ $
14 Survey After New Armor Stone Placement
1 EA $ $
15 Removed Cover Stone Disposal 64 EA $ $
16 Disposal of All Other Materials Not Reused
1 JA
17 Final After Survey 1 EA $ $
Total estimated amount (Items 1 through 17)
Option "A"
18 Mass Concrete 80 CY $ $
Option "B" New Navigation Light Foundation
19 Removal of Old Foundation And 14 CY $ $ Placement of New Concrete Navigation Foundation
Option "C" Repair From Sta. 2+12.2 to 3+44.2 And All Concrete From St 2+16.2 to +3+48.2
20 Closeout Submittals (As-built and Record Drawings and files)
1 JA $
21 Before Survey of Pier for Portion of Option Exercised
1 EA $ $
22 Excavation, Removals, Stockpiling
1521 CY $ $
23 Survey After Excavation and Removals
1 EA $ $
24 Mass Concrete with Dowels 538 CY $ $ h5cosklm Highlight
25 Survey After Mass Concrete 1 EA $ $ Placement
26 Precast Concrete Blocks with 61 CY $ $ Grout
27 Survey After Precast Concrete 1 EA $ $ Blocks Placement
28 New Armor Stone Placement 1360 TN $ $ 29 Survey After New Armor Stone 1 EA $ $
Placement
30 Reused Core Stone Placement 293 TN $ $
31 Unused Core Stone Disposal 662 TN $ $
32 Reused Cover Stone Placement 352 EA $ $
33 Additional Armor Stone in Place of Cover Stone
18 EA $ $
34 Survey After Reused Cover Stone Placement
1 EA $ $
35 Disposal of All Other Materials Not Reused
1 JA
36 Final After Survey 1 EA $ $
37 Geotextile 4213 SF $ $
Total estimated amount (Items 20 through 37)
Option "D"
38 Removed Cover Stone Disposal 100 EA $ $
Total estimated amount all items (Items 1 through 38) $
Note 1: The Government will evaluate offers for award purposes by adding the total price of the options to the total price for the basic requirement. Award will be made to the lowest bid. Evaluation of the options will not obligate the Government to exercise the option(s).
h5cosklm Highlight
Note 2: For bid evaluation purposes, the total bid will be based upon the total of the base bid items and the option items shown above.
Note 3: The Government may elect to exercise any combination of Options, or none of the Options. If an Option is exercised, the Government reserves the right to limit the quantity of material up to the estimated quantities of each Option and each line item within Option "C". Additionally, the Government may elect to exercise any Option at any time after Contract award.
Questions and responses sent in by Contractors as of 24 August 2020
1. Were crib width measurement taken?
Answer: No.
2. Was the timber crib inspected?
Answer: No, there was no access for inspection.
3. What line do we follow here west side of concrete pour or line of existing crib wall?
Answer: Per Note 3 drawing C-102, follow the crib.
4. Define "continuous" as used on page 1049, Article 1.2.2.3 & 4, Order of Work 4 concrete and 5 excavation? Is this 5 x 8's or 7 x 24's?
Answer: Per Amendment: The word “continuously” is deleted from Section 01 35 13, Paragraph 1.2.2, items (3) and (4) and the subparagraph below has been added to Section 03 30 53, Paragraph 3.2.
3.2.6 Construction Joints
Vertical constructions perpendicular to the face of the existing timber crib may be used.
Joints to be minimum 10 feet apart.
5. Can original 1910 and 1964 drawings be sent to us in a full size format as it is impossible to print full size the ones included in the solicitation?
Answer: Yes, the USACE will provide as a TIF file, posted as Addendum 2.
6. Is land access to the site provided?
Answer: The USACE has not made any arrangements for access. We did have informal discussions with the land owners. There are two land owners in the area; the Vermilion Lagoon Association and to the East of that is a park, the Linwood Beach Park Association.
There is an area to the left of the beach house that is occasionally used for vehicular beach access. It is up to the contractor to come to an agreement with the owners of the property for land access to the site.
7. What is done with the excavated material that is not stone?
Answer: Section 31 32 23, Paragraph 3.1.2.b states: “After using all materials designated for reuse by the Government, dispose all materials not reused, off-site, at a location that may legally accept the material. Open lake disposal is not permitted.” Excavated areas as shown on drawings C-301 and C-501 are to be backfilled with excavated material after placement of stone materials.
8. Most of the excavation is under water. What happens if the placed materials don’t stay on a 1H:2V slope?
Answer: If conditions at the site do not allow construction as required by the contract plans and specifications, a contract modification would be made per Contract Clause 52.236–2 Differing Site Conditions as necessary for construction to proceed.
9. There are pretty tight tolerances for the placement of existing stone. What happens when the stones cannot meet those tolerances?
Answer: Per amendment, the table of neatline tolerances in Section 31 32 23 has been revised to increase the Above Neatline tolerance for armor stone to 18 inches and tolerances for cover stone have been added as 18 inches for Above Neatline and 0 inches for Below Neatline.
10. How will the contractor know what the timber crib condition is?
Answer: The USACE is assuming the crib structure is in good condition and will allow construction as shown on the contract plans to be performed, based on inspection of similar crib structures on the lakes. If conditions at the site do not allow construction as required by the contract plans and specifications, a contract modification would be made per Contract Clause 52.236–2 Differing Site Conditions as necessary for construction to proceed.
11. What happens if the existing cribbing is not structurally sufficient to remain?
Answer: If conditions at the site do not allow construction as required by the contract plans and specifications, a contract modification would be made per Contract Clause 52.236–2 Differing Site Conditions as necessary for construction to proceed.
12. Can sheeting be used to control water and what is the elevation of bedrock?
Answer: Steel sheet pile as a material may be used to control water. Paragraph 1. 5 of Specification Section 31 32 23 requires that a Repair Plan be submitted for the approval of the Government. Based on available historical drawings of the east pier, top of bedrock as noted on the contract drawings is assumed to be EL. 556 IGLD 85. The historical drawings of the east pier are provided as attachments to the contract specifications.
POINTED OUT BY THE GOVERNMENT
1. All bidder questions must be sent in writing to the USACE contracting specialist, Peter
Gembala. Deadline for questions is 1 SEP 2020 at 1500 hrs EST. Answers will be provided by the USACE via BETA SAM.
2. The repair location is an open site. Any bidders wanting to physically visit may do so on their own.
| Vermillion_Repair_Amendment_02_W912P420B0016U00002.pdf |
| FY20 Ver East Pier - Amendment No. 2 - W912P420B0016(17 Aug 2020) (1) |
| COVER PAGE |
| Contrator_Questions_Responses_Set_01 |
| 64-A-20 |
| 64-B-7 |
| 65-A-3 |