Amendment2.pdf
PDF 628 KB Posted
- Attached to
- Rochester Pier Repair Federal contract opportunity
- Solicitation number
- W912P419B0025
About this file
Please see Attachment replacing previous documents in last amendment. Also Call in information has been added for bid opening. Please use the following call-in information: 1-877-336-1828 Access Code: 3234778 Security Code: 1234 Emergency Call Number 716-879-4134
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| rochester_Pier_Amendment.pdf | ||
| Rochester_Harbor_east_pier_Bidder_Supplemental_Boring_Information_Memo_&_questions_and_responses.docx | DOCX document | |
| RochesterAmend1.pdf | ||
| Full_Solicitation_-_Rochester_East_Pier_-_Certified_Final_-_RTA_-_P&S_-_W912P419B0025(25_July).pdf | ||
| SOLICITATIONFINAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to replace the Supplemental Information MFR posted on the previous amendment with the attached MFR which supercedes the previous version.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P419B0025
X 9B. DATED (SEE ITEM 11)
26-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2019
CODE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
1776 NIAGARA STREET
BUFFALO NY 14207-3199
W912P4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P419B0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
CERLB-TD-DC
SUBJECT: Geotechnical Logs of Supplemental Borings, Rochester East Pier, NY
-1-
CELRB-TD-DC 19 August 2019
MEMORANDUM FOR FILE
PREPARED BY: David Mitchell, P.G., P.E.
SUBJECT: Geotechnical Logs of Supplemental Borings – Rochester East Pier Repair 2019.
PURPOSE: Supplemental Bidding Information to provide to prospective bidders.
Geotechnical Investigation
From July 30th through 31th, 2019, SJB Services, Inc. (SJB) on behalf of USACE, conducted a subsurface exploration program within the project area with the purpose of supplementing the existing subsurface data and understanding of the geologic and geotechnical conditions along the Rochester East Pier. The field program included the installation of three exploratory borings along the pier with one boring located on the west side of the pier and two borings along the eastern side of the pier. Figure 1 presents the location of the borings. Standard penetration testing along with the collection of split-spoon samples for field and laboratory testing was conducted within each borehole along with field classification of the soil strata encountered.
Attached are the logs for each of the borings along with standard penetration test data. These logs are in pre-final status and will be subsequently finalized to include testing results of selected samples upon completion of laboratory analyses.
Note: The information provided is for exploratory locations offset from the pier and planned sheetpile driveline.
Existing subsurface conditions along the sheetpile driveline have not been specifically investigated.
Exploration logs reflect conditions at the exploration location at the time of exploration. Actual subsurface conditions may vary from those indicated on the exploration logs. Prior to bid submission, USACE recommends that the Contractor examine the project site as needed to establish their own conclusions regarding subsurface conditions.
Figure 1. Boring Locations
DJM
Attachments
233.6
231.6 231.1
229.1 228.6
226.6 226.1
224.1
221.6
219.6
216.6
Barge Deck = 2.2' Above Water Level Lake Level = 248.4'
Lake Bottom = 17' Below Barge Deck
Bottom feels Firm Shells on Top of Plug before Sample #2
Difficult augering 20' - rip rap Refusal at 20.8', Moved ~ 15'N Dificult augering to 21'
0' to 17':
17' to 19': Brown Gray f-c SAND, little f-c Gravel, little Silt (wet, firm, SW-SM)
19' to 19.5':
19.5' to 21.5': Becomes light Gray, Contains fine Sand and trace Gravel, trace Silt, trace Wood (wet, loose, SP) 21.5' to 22':
22' to 24': (Hard) Same as Above
24' to 24.5':
24.5' to 26.5': Becomes light Gray - Brown, Contains f-c Sand and f-m Gravel, trace silt (wet, firm, SW) 26.5' to 29':
29' to 31': Contains little f-m Gravel (loose)
31' to 34':
17.0
19.0 19.5
21.5 22.0
24.0 24.5
26.5
29.0
31.0
34.0
SHEET
State Plane
14. ELEVATION GROUND WATER
OF
COMPLETED
15. DATE BORING
DEG FROM
VERTICAL
HORIZONTAL
DRILLING LOG
12. TOTAL SAMPLES
13. TOTAL NUMBER CORE BOXES
B-1
7/30/19
DISTURBED
N 1,189,149.4 E 1,409,904.9
18. SIGNATURE AND TITLE OF INSPECTOR
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
DIVISION
11. MANUFACTURER'S DESIGNATION OF DRILL
VERTICAL
1. PROJECT
UNDISTURBED
IGLD 85
N/A
2. HOLE NUMBER
CME-45C
8" O.D. HSA
INSTALLATION
Rochester East Pier
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
7/30/19
VERTICAL
D. Delude
17. TOTAL CORE RECOVERY FOR BORING
SHEETS
BEARING
3. DRILLING AGENCY
0 0
INCLINED
SJB Services, Inc.
4. NAME OF DRILLER
5. DIRECTION OF BORING
250.6
9. COORDINATE SYSTEM
10. SIZE AND TYPE OF BIT
NAD 83
0.0
66.0
SHEET 1 of 2
F in es
M
CELEV REMARKS
A S
T M
C la ssN60
FIELD CLASSIFICATION OF MATERIALS
(Description)
LE
G
E N
D
RECNf
LL P
I
0.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
22.5
25.0
27.5
30.0
32.5
35.0
Laboratory
Boring Designation B-1
SEP 05
Boring Designation B-1SPK FORM 1836-A
S an d
G ra ve l
S am p N o.
DEPTH
B lo w s/
0.
ft
A C
E
6-
A
D R
IL
LI
N G
L O
G
R O
C H
E S
T E
R E
A S
T P
IE
R
.G P
J A
C E
M V
D W
IT
H
R A
P
ID
C P
T
8_
1_
.G
D T
/1
6/
214.6
211.6
209.6
207.6
206.6
204.6
203.6
201.6
199.6
196.6
194.6
191.6
189.6
186.6
184.6
S-7 No Rec.
S-10 = Shelby Tube No Rec.
34' to 36': Contains some f-m Gravel (hard) (continued) 36' to 39':
39' to 41': Gray fine SAND, some Silt (wet, loose, sp-sm)
41' to 43': Gray fine SAND, some Silt (wet, loose, SP-SM)
43' to 44':
44' to 46': Gray Clayey SILT, little fine Sand (wet, very soft, ML-CL)
46' to 47':
47' to 49':
49' to 51': Contains little-some f-c Sand
51' to 54':
54' to 56': Contains trace-little fine Sand (moist)
56' to 59':
59' to 61': Same as Above
61' to 64':
64' to 66': Same as Above
66' to 66': B.C. at 66.0'
36.0
39.0
41.0
43.0
44.0
46.0
47.0
49.0
51.0
54.0
56.0
59.0
61.0
64.0
66.0
2SHEET
OF
INSTALLATION
COORDINATE SYSTEM
Rochester East Pier
N 1,189,149.4 E 1,409,904.9
ELEVATION TOP OF BORINGLOCATION COORDINATES
DRILLING LOG (Cont Sheet)
NAD 83
SHEETS
HORIZONTAL VERTICALPROJECT
State Plane
250.6
IGLD 85
SHEET 2 of 2
F in es
M
CELEV REMARKS
A S
T M
C la ssN60
FIELD CLASSIFICATION OF MATERIALS
(Description)
LE
G
E N
D
RECNf
LL P
I
35.0
37.5
40.0
42.5
45.0
47.5
50.0
52.5
55.0
57.5
60.0
62.5
65.0
Laboratory
Boring Designation B-1
SEP 05
Boring Designation B-1SPK FORM 1836-A
S an d
G ra ve l
S am p N o.
DEPTH
B lo w s/
0.
ft
A C
E
6-
A
D R
IL
LI
N G
L O
G
R O
C H
E S
T E
R E
A S
T P
IE
R
.G P
J A
C E
M V
D W
IT
H
R A
P
ID
C P
T
8_
1_
.G
D T
/1
6/
238.7
236.7 236.2
234.2
231.7
229.7
226.7
224.7
221.7
219.7
216.7
Barge Deck = 2.2' Above Water Level Lake Level = 248.5'
Lake Bottom is 12' Below Barge Deck
0' to 12':
12' to 14': Gray-brown fine Sand, trace Silt (wet, SP)
14' to 14.5':
14.5' to 16.5': Gray-brown f-c SAND and f-c Gravel, trace Silt (wet, firm, SW)
16.5' to 19':
19' to 21': Contains f-m Sand, trace Gravel, trace Silt (SP)
21' to 24':
24' to 26': Containes "and" f-m Gravel (SW)
26' to 29':
29' to 31': Same as Above
31' to 34':
12.0
14.0 14.5
16.5
19.0
21.0
24.0
26.0
29.0
31.0
34.0
SHEET
State Plane
14. ELEVATION GROUND WATER
OF
COMPLETED
15. DATE BORING
DEG FROM
VERTICAL
HORIZONTAL
DRILLING LOG
12. TOTAL SAMPLES
13. TOTAL NUMBER CORE BOXES
B-2
7/30/19
DISTURBED
N 1,188,733.2 E 1,409,813.5
18. SIGNATURE AND TITLE OF INSPECTOR
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
DIVISION
11. MANUFACTURER'S DESIGNATION OF DRILL
VERTICAL
1. PROJECT
UNDISTURBED
IGLD 85
N/A
2. HOLE NUMBER
CME-45C
8" O.D. HSA
INSTALLATION
Rochester East Pier
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
7/30/19
VERTICAL
D. Delude
17. TOTAL CORE RECOVERY FOR BORING
SHEETS
BEARING
3. DRILLING AGENCY
0 0
INCLINED
SJB Services, Inc.
4. NAME OF DRILLER
5. DIRECTION OF BORING
250.7
9. COORDINATE SYSTEM
10. SIZE AND TYPE OF BIT
NAD 83
0.0
61.0
SHEET 1 of 2
F in es
M
CELEV REMARKS
A S
T M
C la ssN60
FIELD CLASSIFICATION OF MATERIALS
(Description)
LE
G
E N
D
RECNf
LL P
I
0.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
22.5
25.0
27.5
30.0
32.5
35.0
Laboratory
Boring Designation B-2
SEP 05
Boring Designation B-2SPK FORM 1836-A
S an d
G ra ve l
S am p N o.
DEPTH
B lo w s/
0.
ft
A C
E
6-
A
D R
IL
LI
N G
L O
G
R O
C H
E S
T E
R E
A S
T P
IE
R
.G P
J A
C E
M V
D W
IT
H
R A
P
ID
C P
T
8_
1_
.G
D T
/1
6/
214.7
211.7
209.7
206.7
204.7
201.7
199.7
196.7
194.7
191.7
189.7
Clay Content Increasing
Decreasing Clay Content
Slightly Increasing Clay Content 60'-61'
34' to 36': Gray-brown Clayey SILT, little fine Sand (wet, very soft, ML-CL) (continued) 36' to 39':
39' to 41': Same as Above
41' to 44':
44' to 46': Same as Above
46' to 49':
49' to 51': Same as Above
51' to 54':
54' to 56': Contains little-some fine Sand
56' to 59':
59' to 61': Contains little-some fine Sand
61' to 61': B.C. at 61.0'
36.0
39.0
41.0
44.0
46.0
49.0
51.0
54.0
56.0
59.0
61.0
2SHEET
OF
INSTALLATION
COORDINATE SYSTEM
Rochester East Pier
N 1,188,733.2 E 1,409,813.5
ELEVATION TOP OF BORINGLOCATION COORDINATES
DRILLING LOG (Cont Sheet)
NAD 83
SHEETS
HORIZONTAL VERTICALPROJECT
State Plane
250.7
IGLD 85
SHEET 2 of 2
F in es
M
CELEV REMARKS
A S
T M
C la ssN60
FIELD CLASSIFICATION OF MATERIALS
(Description)
LE
G
E N
D
RECNf
LL P
I
35.0
37.5
40.0
42.5
45.0
47.5
50.0
52.5
55.0
57.5
60.0
Laboratory
Boring Designation B-2
SEP 05
Boring Designation B-2SPK FORM 1836-A
S an d
G ra ve l
S am p N o.
DEPTH
B lo w s/
0.
ft
A C
E
6-
A
D R
IL
LI
N G
L O
G
R O
C H
E S
T E
R E
A S
T P
IE
R
.G P
J A
C E
M V
D W
IT
H
R A
P
ID
C P
T
8_
1_
.G
D T
/1
6/
236.7
234.7 234.2
232.2
229.2
227.2 226.7
224.7
221.7
219.7
216.7
Barge Deck = 2.2' Above Water Level Lake Level = 248.5'
Lake Bottom = 14' Below Barge Deck
Softer at 30.5'
0' to 14':
14' to 16': Brown f-c GRAVEL, little f-c Sand, little Clayey Silt (wet, firm, GW-GM)
16' to 16.5':
16.5' to 18.5': Brown-gray f-m SAND, trace Silt (wet, loose, SP)
18.5' to 21.5':
21.5' to 23.5': Gray-brown f-c SAND, some f-m Gravel, trace Silt (wet, firm, SW)
23.5' to 24':
24' to 26': Same as Above
26' to 29':
29' to 31': Contains "and" f-c Gravel
31' to 34':
14.0
16.0 16.5
18.5
21.5
23.5 24.0
26.0
29.0
31.0
34.0
SHEET
State Plane
14. ELEVATION GROUND WATER
OF
COMPLETED
15. DATE BORING
DEG FROM
VERTICAL
HORIZONTAL
DRILLING LOG
12. TOTAL SAMPLES
13. TOTAL NUMBER CORE BOXES
B-3
7/30/19
DISTURBED
N 1,189,252.9 E 1,410,096.1
18. SIGNATURE AND TITLE OF INSPECTOR
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
DIVISION
11. MANUFACTURER'S DESIGNATION OF DRILL
VERTICAL
1. PROJECT
UNDISTURBED
IGLD 85
N/A
2. HOLE NUMBER
CME-45C
8" O.D. HSA
INSTALLATION
Rochester East Pier
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
7/30/19
VERTICAL
D. Delude
17. TOTAL CORE RECOVERY FOR BORING
SHEETS
BEARING
3. DRILLING AGENCY
0 0
INCLINED
SJB Services, Inc.
4. NAME OF DRILLER
5. DIRECTION OF BORING
250.7
9. COORDINATE SYSTEM
10. SIZE AND TYPE OF BIT
NAD 83
0.0
66.0
SHEET 1 of 2
F in es
M
CELEV REMARKS
A S
T M
C la ssN60
FIELD CLASSIFICATION OF MATERIALS
(Description)
LE
G
E N
D
RECNf
LL P
I
0.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
22.5
25.0
27.5
30.0
32.5
35.0
Laboratory
Boring Designation B-3
SEP 05
Boring Designation B-3SPK FORM 1836-A
S an d
G ra ve l
S am p N o.
DEPTH
B lo w s/
0.
ft
A C
E
6-
A
D R
IL
LI
N G
L O
G
R O
C H
E S
T E
R E
A S
T P
IE
R
.G P
J A
C E
M V
D W
IT
H
R A
P
ID
C P
T
8_
1_
.G
D T
/1
6/
214.7
211.7
209.7
206.7
204.7
201.7
199.7
196.7
194.7
191.7
189.7
186.7
184.7
S-7: Difficulty Pulling Plug after Augering to 39' Spoon was Full but Blow Counts are Inaccurate. Steel Cable Wrapped around Lead Auger upon Retrieval
Slightly increased Clay content in vertically isolated seams
34' to 36': Gray Clayey SILT, little fine Sand (wet, stiff, ML-CL) (continued) 36' to 39':
39' to 41': Same as Above
41' to 44':
44' to 46': Same as Above
46' to 49':
49' to 51': very soft (moist)
51' to 54':
54' to 56': Same as Above
56' to 59':
59' to 61': Contains little-some fine Sand, occasional wet fine Sand seams
61' to 64':
64' to 66': Same as Above
66' to 66': B.C. at 66.0'
36.0
39.0
41.0
44.0
46.0
49.0
51.0
54.0
56.0
59.0
61.0
64.0
66.0
2SHEET
OF
INSTALLATION
COORDINATE SYSTEM
Rochester East Pier
N 1,189,252.9 E 1,410,096.1
ELEVATION TOP OF BORINGLOCATION COORDINATES
DRILLING LOG (Cont Sheet)
NAD 83
SHEETS
HORIZONTAL VERTICALPROJECT
State Plane
250.7
IGLD 85
SHEET 2 of 2
F in es
M
CELEV REMARKS
A S
T M
C la ssN60
FIELD CLASSIFICATION OF MATERIALS
(Description)
LE
G
E N
D
RECNf
LL P
I
35.0
37.5
40.0
42.5
45.0
47.5
50.0
52.5
55.0
57.5
60.0
62.5
65.0
Laboratory
Boring Designation B-3
SEP 05
Boring Designation B-3SPK FORM 1836-A
S an d
G ra ve l
S am p N o.
DEPTH
B lo w s/
0.
ft
A C
E
6-
A
D R
IL
LI
N G
L O
G
R O
C H
E S
T E
R E
A S
T P
IE
R
.G P
J A
C E
M V
D W
IT
H
R A
P
ID
C P
T
8_
1_
.G
D T
/1
6/
| SF30 |
| Combined Bidder Supplemental Boring Information August 2019v1 |
| Bidder Supplemental Boring Information Memo |
| CELRB-TD-DC 19 August 2019 |