About this file

Please see Attachment replacing previous documents in last amendment. Also Call in information has been added for bid opening. Please use the following call-in information: 1-877-336-1828 Access Code: 3234778 Security Code: 1234 Emergency Call Number 716-879-4134

View the file

Other files for this federal contract opportunity

Other files attached to Rochester Pier Repair, newest first.
File Type Posted
Bid_Abstract.pdf PDF
rochester_Pier_Amendment.pdf PDF
Rochester_Harbor_east_pier_Bidder_Supplemental_Boring_Information_Memo_&_questions_and_responses.docx DOCX document
RochesterAmend1.pdf PDF
Full_Solicitation_-_Rochester_East_Pier_-_Certified_Final_-_RTA_-_P&S_-_W912P419B0025(25_July).pdf PDF
SOLICITATIONFINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Purpose of this amendment is to replace the Supplemental Information MFR posted on the previous amendment with the attached MFR which supercedes the previous version.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P419B0025

X 9B. DATED (SEE ITEM 11)

26-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Aug-2019

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P419B0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

CERLB-TD-DC

SUBJECT: Geotechnical Logs of Supplemental Borings, Rochester East Pier, NY

-1-

CELRB-TD-DC 19 August 2019

MEMORANDUM FOR FILE

PREPARED BY: David Mitchell, P.G., P.E.

SUBJECT: Geotechnical Logs of Supplemental Borings – Rochester East Pier Repair 2019.

PURPOSE: Supplemental Bidding Information to provide to prospective bidders.

Geotechnical Investigation

From July 30th through 31th, 2019, SJB Services, Inc. (SJB) on behalf of USACE, conducted a subsurface exploration program within the project area with the purpose of supplementing the existing subsurface data and understanding of the geologic and geotechnical conditions along the Rochester East Pier. The field program included the installation of three exploratory borings along the pier with one boring located on the west side of the pier and two borings along the eastern side of the pier. Figure 1 presents the location of the borings. Standard penetration testing along with the collection of split-spoon samples for field and laboratory testing was conducted within each borehole along with field classification of the soil strata encountered.

Attached are the logs for each of the borings along with standard penetration test data. These logs are in pre-final status and will be subsequently finalized to include testing results of selected samples upon completion of laboratory analyses.

Note: The information provided is for exploratory locations offset from the pier and planned sheetpile driveline.

Existing subsurface conditions along the sheetpile driveline have not been specifically investigated.

Exploration logs reflect conditions at the exploration location at the time of exploration. Actual subsurface conditions may vary from those indicated on the exploration logs. Prior to bid submission, USACE recommends that the Contractor examine the project site as needed to establish their own conclusions regarding subsurface conditions.

Figure 1. Boring Locations

DJM

Attachments

233.6

231.6 231.1

229.1 228.6

226.6 226.1

224.1

221.6

219.6

216.6

Barge Deck = 2.2' Above Water Level Lake Level = 248.4'

Lake Bottom = 17' Below Barge Deck

Bottom feels Firm Shells on Top of Plug before Sample #2

Difficult augering 20' - rip rap Refusal at 20.8', Moved ~ 15'N Dificult augering to 21'

0' to 17':

17' to 19': Brown Gray f-c SAND, little f-c Gravel, little Silt (wet, firm, SW-SM)

19' to 19.5':

19.5' to 21.5': Becomes light Gray, Contains fine Sand and trace Gravel, trace Silt, trace Wood (wet, loose, SP) 21.5' to 22':

22' to 24': (Hard) Same as Above

24' to 24.5':

24.5' to 26.5': Becomes light Gray - Brown, Contains f-c Sand and f-m Gravel, trace silt (wet, firm, SW) 26.5' to 29':

29' to 31': Contains little f-m Gravel (loose)

31' to 34':

17.0

19.0 19.5

21.5 22.0

24.0 24.5

26.5

29.0

31.0

34.0

SHEET

State Plane

14. ELEVATION GROUND WATER

OF

COMPLETED

15. DATE BORING

DEG FROM

VERTICAL

HORIZONTAL

DRILLING LOG

12. TOTAL SAMPLES

13. TOTAL NUMBER CORE BOXES

B-1

7/30/19

DISTURBED

N 1,189,149.4 E 1,409,904.9

18. SIGNATURE AND TITLE OF INSPECTOR

6. THICKNESS OF OVERBURDEN

7. DEPTH DRILLED INTO ROCK

8. TOTAL DEPTH OF BORING

STARTED

DIVISION

11. MANUFACTURER'S DESIGNATION OF DRILL

VERTICAL

1. PROJECT

UNDISTURBED

IGLD 85

N/A

2. HOLE NUMBER

CME-45C

8" O.D. HSA

INSTALLATION

Rochester East Pier

LOCATION COORDINATES

16. ELEVATION TOP OF BORING

7/30/19

VERTICAL

D. Delude

17. TOTAL CORE RECOVERY FOR BORING

SHEETS

BEARING

3. DRILLING AGENCY

0 0

INCLINED

SJB Services, Inc.

4. NAME OF DRILLER

5. DIRECTION OF BORING

250.6

9. COORDINATE SYSTEM

10. SIZE AND TYPE OF BIT

NAD 83

0.0

66.0

SHEET 1 of 2

F in es

M

CELEV REMARKS

A S

T M

C la ssN60

FIELD CLASSIFICATION OF MATERIALS

(Description)

LE

G

E N

D

RECNf

LL P

I

0.0

2.5

5.0

7.5

10.0

12.5

15.0

17.5

20.0

22.5

25.0

27.5

30.0

32.5

35.0

Laboratory

Boring Designation B-1

SEP 05

Boring Designation B-1SPK FORM 1836-A

S an d

G ra ve l

S am p N o.

DEPTH

B lo w s/

0.

ft

A C

E

6-

A

D R

IL

LI

N G

L O

G

R O

C H

E S

T E

R E

A S

T P

IE

R

.G P

J A

C E

M V

D W

IT

H

R A

P

ID

C P

T

8_

1_

.G

D T

/1

6/

214.6

211.6

209.6

207.6

206.6

204.6

203.6

201.6

199.6

196.6

194.6

191.6

189.6

186.6

184.6

S-7 No Rec.

S-10 = Shelby Tube No Rec.

34' to 36': Contains some f-m Gravel (hard) (continued) 36' to 39':

39' to 41': Gray fine SAND, some Silt (wet, loose, sp-sm)

41' to 43': Gray fine SAND, some Silt (wet, loose, SP-SM)

43' to 44':

44' to 46': Gray Clayey SILT, little fine Sand (wet, very soft, ML-CL)

46' to 47':

47' to 49':

49' to 51': Contains little-some f-c Sand

51' to 54':

54' to 56': Contains trace-little fine Sand (moist)

56' to 59':

59' to 61': Same as Above

61' to 64':

64' to 66': Same as Above

66' to 66': B.C. at 66.0'

36.0

39.0

41.0

43.0

44.0

46.0

47.0

49.0

51.0

54.0

56.0

59.0

61.0

64.0

66.0

2SHEET

OF

INSTALLATION

COORDINATE SYSTEM

Rochester East Pier

N 1,189,149.4 E 1,409,904.9

ELEVATION TOP OF BORINGLOCATION COORDINATES

DRILLING LOG (Cont Sheet)

NAD 83

SHEETS

HORIZONTAL VERTICALPROJECT

State Plane

250.6

IGLD 85

SHEET 2 of 2

F in es

M

CELEV REMARKS

A S

T M

C la ssN60

FIELD CLASSIFICATION OF MATERIALS

(Description)

LE

G

E N

D

RECNf

LL P

I

35.0

37.5

40.0

42.5

45.0

47.5

50.0

52.5

55.0

57.5

60.0

62.5

65.0

Laboratory

Boring Designation B-1

SEP 05

Boring Designation B-1SPK FORM 1836-A

S an d

G ra ve l

S am p N o.

DEPTH

B lo w s/

0.

ft

A C

E

6-

A

D R

IL

LI

N G

L O

G

R O

C H

E S

T E

R E

A S

T P

IE

R

.G P

J A

C E

M V

D W

IT

H

R A

P

ID

C P

T

8_

1_

.G

D T

/1

6/

238.7

236.7 236.2

234.2

231.7

229.7

226.7

224.7

221.7

219.7

216.7

Barge Deck = 2.2' Above Water Level Lake Level = 248.5'

Lake Bottom is 12' Below Barge Deck

0' to 12':

12' to 14': Gray-brown fine Sand, trace Silt (wet, SP)

14' to 14.5':

14.5' to 16.5': Gray-brown f-c SAND and f-c Gravel, trace Silt (wet, firm, SW)

16.5' to 19':

19' to 21': Contains f-m Sand, trace Gravel, trace Silt (SP)

21' to 24':

24' to 26': Containes "and" f-m Gravel (SW)

26' to 29':

29' to 31': Same as Above

31' to 34':

12.0

14.0 14.5

16.5

19.0

21.0

24.0

26.0

29.0

31.0

34.0

SHEET

State Plane

14. ELEVATION GROUND WATER

OF

COMPLETED

15. DATE BORING

DEG FROM

VERTICAL

HORIZONTAL

DRILLING LOG

12. TOTAL SAMPLES

13. TOTAL NUMBER CORE BOXES

B-2

7/30/19

DISTURBED

N 1,188,733.2 E 1,409,813.5

18. SIGNATURE AND TITLE OF INSPECTOR

6. THICKNESS OF OVERBURDEN

7. DEPTH DRILLED INTO ROCK

8. TOTAL DEPTH OF BORING

STARTED

DIVISION

11. MANUFACTURER'S DESIGNATION OF DRILL

VERTICAL

1. PROJECT

UNDISTURBED

IGLD 85

N/A

2. HOLE NUMBER

CME-45C

8" O.D. HSA

INSTALLATION

Rochester East Pier

LOCATION COORDINATES

16. ELEVATION TOP OF BORING

7/30/19

VERTICAL

D. Delude

17. TOTAL CORE RECOVERY FOR BORING

SHEETS

BEARING

3. DRILLING AGENCY

0 0

INCLINED

SJB Services, Inc.

4. NAME OF DRILLER

5. DIRECTION OF BORING

250.7

9. COORDINATE SYSTEM

10. SIZE AND TYPE OF BIT

NAD 83

0.0

61.0

SHEET 1 of 2

F in es

M

CELEV REMARKS

A S

T M

C la ssN60

FIELD CLASSIFICATION OF MATERIALS

(Description)

LE

G

E N

D

RECNf

LL P

I

0.0

2.5

5.0

7.5

10.0

12.5

15.0

17.5

20.0

22.5

25.0

27.5

30.0

32.5

35.0

Laboratory

Boring Designation B-2

SEP 05

Boring Designation B-2SPK FORM 1836-A

S an d

G ra ve l

S am p N o.

DEPTH

B lo w s/

0.

ft

A C

E

6-

A

D R

IL

LI

N G

L O

G

R O

C H

E S

T E

R E

A S

T P

IE

R

.G P

J A

C E

M V

D W

IT

H

R A

P

ID

C P

T

8_

1_

.G

D T

/1

6/

214.7

211.7

209.7

206.7

204.7

201.7

199.7

196.7

194.7

191.7

189.7

Clay Content Increasing

Decreasing Clay Content

Slightly Increasing Clay Content 60'-61'

34' to 36': Gray-brown Clayey SILT, little fine Sand (wet, very soft, ML-CL) (continued) 36' to 39':

39' to 41': Same as Above

41' to 44':

44' to 46': Same as Above

46' to 49':

49' to 51': Same as Above

51' to 54':

54' to 56': Contains little-some fine Sand

56' to 59':

59' to 61': Contains little-some fine Sand

61' to 61': B.C. at 61.0'

36.0

39.0

41.0

44.0

46.0

49.0

51.0

54.0

56.0

59.0

61.0

2SHEET

OF

INSTALLATION

COORDINATE SYSTEM

Rochester East Pier

N 1,188,733.2 E 1,409,813.5

ELEVATION TOP OF BORINGLOCATION COORDINATES

DRILLING LOG (Cont Sheet)

NAD 83

SHEETS

HORIZONTAL VERTICALPROJECT

State Plane

250.7

IGLD 85

SHEET 2 of 2

F in es

M

CELEV REMARKS

A S

T M

C la ssN60

FIELD CLASSIFICATION OF MATERIALS

(Description)

LE

G

E N

D

RECNf

LL P

I

35.0

37.5

40.0

42.5

45.0

47.5

50.0

52.5

55.0

57.5

60.0

Laboratory

Boring Designation B-2

SEP 05

Boring Designation B-2SPK FORM 1836-A

S an d

G ra ve l

S am p N o.

DEPTH

B lo w s/

0.

ft

A C

E

6-

A

D R

IL

LI

N G

L O

G

R O

C H

E S

T E

R E

A S

T P

IE

R

.G P

J A

C E

M V

D W

IT

H

R A

P

ID

C P

T

8_

1_

.G

D T

/1

6/

236.7

234.7 234.2

232.2

229.2

227.2 226.7

224.7

221.7

219.7

216.7

Barge Deck = 2.2' Above Water Level Lake Level = 248.5'

Lake Bottom = 14' Below Barge Deck

Softer at 30.5'

0' to 14':

14' to 16': Brown f-c GRAVEL, little f-c Sand, little Clayey Silt (wet, firm, GW-GM)

16' to 16.5':

16.5' to 18.5': Brown-gray f-m SAND, trace Silt (wet, loose, SP)

18.5' to 21.5':

21.5' to 23.5': Gray-brown f-c SAND, some f-m Gravel, trace Silt (wet, firm, SW)

23.5' to 24':

24' to 26': Same as Above

26' to 29':

29' to 31': Contains "and" f-c Gravel

31' to 34':

14.0

16.0 16.5

18.5

21.5

23.5 24.0

26.0

29.0

31.0

34.0

SHEET

State Plane

14. ELEVATION GROUND WATER

OF

COMPLETED

15. DATE BORING

DEG FROM

VERTICAL

HORIZONTAL

DRILLING LOG

12. TOTAL SAMPLES

13. TOTAL NUMBER CORE BOXES

B-3

7/30/19

DISTURBED

N 1,189,252.9 E 1,410,096.1

18. SIGNATURE AND TITLE OF INSPECTOR

6. THICKNESS OF OVERBURDEN

7. DEPTH DRILLED INTO ROCK

8. TOTAL DEPTH OF BORING

STARTED

DIVISION

11. MANUFACTURER'S DESIGNATION OF DRILL

VERTICAL

1. PROJECT

UNDISTURBED

IGLD 85

N/A

2. HOLE NUMBER

CME-45C

8" O.D. HSA

INSTALLATION

Rochester East Pier

LOCATION COORDINATES

16. ELEVATION TOP OF BORING

7/30/19

VERTICAL

D. Delude

17. TOTAL CORE RECOVERY FOR BORING

SHEETS

BEARING

3. DRILLING AGENCY

0 0

INCLINED

SJB Services, Inc.

4. NAME OF DRILLER

5. DIRECTION OF BORING

250.7

9. COORDINATE SYSTEM

10. SIZE AND TYPE OF BIT

NAD 83

0.0

66.0

SHEET 1 of 2

F in es

M

CELEV REMARKS

A S

T M

C la ssN60

FIELD CLASSIFICATION OF MATERIALS

(Description)

LE

G

E N

D

RECNf

LL P

I

0.0

2.5

5.0

7.5

10.0

12.5

15.0

17.5

20.0

22.5

25.0

27.5

30.0

32.5

35.0

Laboratory

Boring Designation B-3

SEP 05

Boring Designation B-3SPK FORM 1836-A

S an d

G ra ve l

S am p N o.

DEPTH

B lo w s/

0.

ft

A C

E

6-

A

D R

IL

LI

N G

L O

G

R O

C H

E S

T E

R E

A S

T P

IE

R

.G P

J A

C E

M V

D W

IT

H

R A

P

ID

C P

T

8_

1_

.G

D T

/1

6/

214.7

211.7

209.7

206.7

204.7

201.7

199.7

196.7

194.7

191.7

189.7

186.7

184.7

S-7: Difficulty Pulling Plug after Augering to 39' Spoon was Full but Blow Counts are Inaccurate. Steel Cable Wrapped around Lead Auger upon Retrieval

Slightly increased Clay content in vertically isolated seams

34' to 36': Gray Clayey SILT, little fine Sand (wet, stiff, ML-CL) (continued) 36' to 39':

39' to 41': Same as Above

41' to 44':

44' to 46': Same as Above

46' to 49':

49' to 51': very soft (moist)

51' to 54':

54' to 56': Same as Above

56' to 59':

59' to 61': Contains little-some fine Sand, occasional wet fine Sand seams

61' to 64':

64' to 66': Same as Above

66' to 66': B.C. at 66.0'

36.0

39.0

41.0

44.0

46.0

49.0

51.0

54.0

56.0

59.0

61.0

64.0

66.0

2SHEET

OF

INSTALLATION

COORDINATE SYSTEM

Rochester East Pier

N 1,189,252.9 E 1,410,096.1

ELEVATION TOP OF BORINGLOCATION COORDINATES

DRILLING LOG (Cont Sheet)

NAD 83

SHEETS

HORIZONTAL VERTICALPROJECT

State Plane

250.7

IGLD 85

SHEET 2 of 2

F in es

M

CELEV REMARKS

A S

T M

C la ssN60

FIELD CLASSIFICATION OF MATERIALS

(Description)

LE

G

E N

D

RECNf

LL P

I

35.0

37.5

40.0

42.5

45.0

47.5

50.0

52.5

55.0

57.5

60.0

62.5

65.0

Laboratory

Boring Designation B-3

SEP 05

Boring Designation B-3SPK FORM 1836-A

S an d

G ra ve l

S am p N o.

DEPTH

B lo w s/

0.

ft

A C

E

6-

A

D R

IL

LI

N G

L O

G

R O

C H

E S

T E

R E

A S

T P

IE

R

.G P

J A

C E

M V

D W

IT

H

R A

P

ID

C P

T

8_

1_

.G

D T

/1

6/

SF30
Combined Bidder Supplemental Boring Information August 2019v1
Bidder Supplemental Boring Information Memo
CELRB-TD-DC 19 August 2019

SJB Boring Logs - Rochester East Pier Geotechnical Investigation - July 2019 - rev 8-16