W912P4-17-T-0010-0002_Modification_of_Hydraulic_Ram_Repair.pdf
PDF 2 MB Posted
- Solicitation number
- W912P4-17-T-0010
About this file
Amendment 2
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reasons for this amendment of the solicitation is to change the NAICS CODE from 238120, Structural Steel and Precast Concrete to 237990, Other Heavy and Civil Engineering Construction; SIC CODE from 1791, Structural Steel Erection to 1629 Heavy Construction; The Size Standard from 15. million to 36.5 million. Everything else w ill remain the same. Also to updated Statement of Work and to add the questions and answ ers document from the Pre-Bid Site Visit.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P4-17-T-0010
X 9B. DATED (SEE ITEM 11)
27-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Mar-2017
CODE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
1776 NIAGARA STREET
BUFFALO NY 14207-3199
W912P4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P4-17-T-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
Global Changes
CLIN 0001 -- CLIN 0003
The SIC code has changed from 1791 to 1629.
The NAICS code has changed from 238120 to 237990.
(End of Summary of Changes)
U.S. Army Corps of Engineers® Buffalo District
Statement of Work Black Rock Lock, Buffalo, New York Lower West Gate Hydraulic Ram Connection Repair
Customer:
Lockmaster, Black Rock Lock
Prepared By:
David Mastriano, PE, PMP New York and Pennsylvania Operations & Maintenance U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207
1 March 2017 – Addendum #2 to Solicitation
1 General Description of Work
1.1 Base Bid Item(s)
1.1.1 Base Bid Item 1 – Remove and Replace Connection from Hydraulic Cylinder to Gate
1.2 Optional Bid Item(s)
1.2.1 Optional Bid Item 2 – Replace Corroded Sections of the Steel Catwalk Structure
1.2.2 Optional Bid Item 3 – Supply Steel Walkway Grating
2 Point of Contact 3 Pre-Bid Site Visit 4 Project/Contractual References 5 Detailed Description of Work
5.1 Detailed Description of Work – Base Bid Item(s)
5.1.1 Base Bid Item 1 – Remove and Replace Connection from Hydraulic Cylinder to Gate
5.2 Detailed Description of Work –Optional Bid Item(s)
5.2.1 Optional Bid Item 2 – Replace Corroded Sections of the Steel Catwalk Structure
5.2.2 Optional Bid Item 3 – Supply Steel Walkway Grating
6 Project Information
6.1 Basis for Award
6.2 Period of Performance
6.2.1 Pre-Construction Submittals
6.3 Pre-Construction Meeting
6.4 Work Schedule
6.5 Material/Equipment Information
6.6 Dimension/Quantity Verification
6.7 Material Storage
6.8 Site Cleanup
7 Quality Assurance (QA)
7.1 Overview
7.1.1 Government Project Manager (PM)
7.1.2 Government Quality Assurance (QA)
7.1.3 Government Inspections
7.1.4 Product Data Sheets
8 Communication 9 Repair/Restoration of Government Property 10 Work Stoppage, Contract Cancellation Actions 11 Material Change Orders 12 Liquidated Damages 13 Inspection/Testing
13.1 Pre-Final/Final Inspection
14 Completion 15 Payment 16 Safety 17 Security
17.1 Access and General Protection/Security Policy and Procedures
17.1.1 Candidate Pre-Screening
17.1.2 Background Investigation
17.1.3 Access Badge
17.1.4 Suspicious Activity Reporting Training
17.2 Start of Work
17.3 Arrival/Departure
17.4 Video/Camera Equipment
18 Submittals
18.1 Bid Submittals
18.2 Pre-Construction Submittals
18.3 Project Completion Submittals
Attachment #1 – Drawings Attachment #2 – Bid Schedule Attachment #3 – Directions to Black Rock Lock Attachment #4 – Government Safety Requirements Attachment #5 – Accident Prevention Plan Checklist Attachment #6 – Blank Activity Hazard Analysis Attachment #7 – USACE Buffalo District Monthly Man Hour Exposure Report
1 General Description of Work The contractor shall perform the following work under this contract:
1.1 Base Bid Item(s)
1.1.1 Base Bid Item 1 – Remove and Replace Connection from Hydraulic Cylinder to Gate
1.2 Optional Bid Item(s)
1.2.1 Optional Bid Item 2 – Replace Corroded Sections of the Steel Catwalk Structure
1.2.2 Optional Bid Item 3 – Supply Steel Walkway Grating
2 Point of Contact For scheduling project site visits and/or questions regarding this Statement of Work:
U.S. Army Corps of Engineers, Buffalo District Attn: Contracting Officer 1776 Niagara Street Buffalo, New York 14207
Phone: 716-879-4126 Facsimile: 716-879-4353
3 Pre-Bid Site Visit There will be one (1) scheduled pre-bid site visit for prospective bidders. The date and time of the visit will be posted on FBO. The location of the visit will be Black Rock Lock at US Army Corps of Engineers Buffalo District Reservation, 1776 Niagara Street, Buffalo, New York 14207. Prospective bidders are urged to attend to gain information that will be necessary in the preparation of bid submittals. Due to maintenance, operation and security requirements, unscheduled visits will not be honored. Following a visit to the project site, a question and answer session will be held. During this session, prospective bidders are asked to direct all questions concerning the project to the Buffalo District Contracting Office (DCO).
4 Project/Contractual References
• EM 385-1-1, 30 Nov 2014, U.S. Army Safety and Health Requirements Manual
• Wide-Flange Beam Drawings (Sheets D1-D7 within Attachment #1)
5 Detailed Description of Work
5.1 Detailed Description of Work – Base Bid Item(s)
5.1.1 Base Bid Item 1 – Remove and Replace Connection from Hydraulic Cylinder to Gate The 76 ton operating gates at the Black Rock Lock open and close via an 8” diameter hydraulic cylinder which connects to the gate via a clevis eye mounted to a wide flange beam, which is mounted to the main gate structure.
The W14x90 wide flange beam has failed due to a crack in the flange on the left-hand side of the beam, along with failed bolts, and requires replacement.
Construction drawings for the repair work are shown in Attachment #1. The contractor shall submit shop drawings for government approval prior to beginning fabrication. The work is described below.
The contractor shall have the following structural steel sections fabricated prior to the start of work. The contractor shall field verify all dimensions, bolt spacing and sizing, shown and drawings and stated herein prior to fabricating. The contractor shall note the gate structure is over 100 years old, and rivet/bolt spacing may not be consistent throughout a whole member, and members may not be plumb, level, or square. A template or laser scan of the removed sections may help fabricating the new structural steel. Lead based paint has been abated from the gates. All materials shall be submitted to the government as a pre-construction submittal prior to ordering:
Wide flange beam
• W14x211 beam, ASTM A992 Grade 50 high strength low alloy steel, approximately 60” in length. Apply a
G100 hot-dipped galvanized coating meeting ASTM A123. Quantity of one (1). The beam shall be notched at each end on one flange where it shall bear against the vertical angles, as shown in Detail B on Sheet D7, and may be shop-drilled or field-drilled. Verify hydraulic cylinder mounting plate bolt spacing prior to drilling.
Hot-dipped galvanized coating shall be applied after any shop drilling is performed. Apply cold galvanizing compound to all field drilled or modified surfaces.
Bulkhead plate
• Approximate size of 8’ 8 ½” x 3’ 10 3/8” x ¾”, ASTM A572 Grade 50 steel plate. Apply a G100 hot-dipped galvanized coating meeting ASTM A123. Quantity of one (1). Refer to Sheet D5. Holes may require field-drilled as rivet spacing is not consistent. Apply cold galvanizing compound to all drilled surfaces.
Diaphragm plates and connecting angles
• Approximate plate size of 3’ 11 5/8” x 3’ 5/8” x 3/8”, ASTM A36 steel plate. Apply a G100 hot-dipped galvanized coating meeting ASTM A123. Quantity of two (2). Holes shall be field-drilled as rivet spacing is not consistent. Apply cold galvanizing compound to all drilled surfaces.
• L3 ½ x 3 ½ x 3/8”, lengths as shown on Sheet D6, ASTM A36 steel. Apply a G100 hot-dipped galvanized coating meeting ASTM A123. Quantity of eight (8). Each diaphragm will have three angles replaced on the inside and one on the outside at the front of the gate with these. Reuse of the other existing on the outside is acceptable.
o Note: All fasteners connected to these angles are ¾” ASTM A325 bolts.
• L4 x 3 ½ x 3/8”, lengths as shown on Sheet D6, ASTM A36 steel. Apply a G100 hot-dipped galvanized coating meeting ASTM A123. Quantity of two (2). These angles will connect the front of the diaphragm to the bulkhead plate, and where the beam connects to.
o Note: All fasteners connected to these angles are ¾” ASTM A325 bolts.
Beam flange to diaphragm plate
• L4 x 4 x ½” angles, 7” length, ASTM A572 Grade 50 steel. Apply a G100 hot-dipped galvanized coating meeting ASTM A123. Quantity of four (4), two (2) on each end of beam. Refer to Sheet D6.
o Note: All fasteners connected to these angles are 1” ASTM A325 bolts.
Beam flange angle to diaphragm plate connection
• Hex head bolts, galvanized, 1”-8 x 2 ½”, Grade ASTM A325. Quantity of twelve (12).
• Hex nuts, galvanized, 1”-8, Grade DH meeting ASTM A563. Quantity of twelve (12).
• 1” structural washers, galvanized, ASTM F436 Type 1. Quantity of twelve (12).
• 1” galvanized direct-tension indicating washers with dye, meeting ASTM F436 Type 1. Quantity of twelve
(12).
Hydraulic cylinder mounting plate to beam flange
• Hex head bolts, galvanized, 7/8”-9 x 6”, Grade ASTM A325. Quantity of fourteen (14).
• Hex nuts, galvanized, 7/8”-9, Grade DH meeting ASTM A563. Quantity of fourteen (14).
• 7/8” structural washers, galvanized, ASTM F436 Type 1. Quantity of twenty-eight (28).
• 7/8” galvanized direct-tension indicating washers with dye, meeting ASTM F436 Type 1. Quantity of fourteen (14).
o A total of two (2) structural washers, one (1) direct-tension indicating washer, and one (1) nut shall be used on each bolt.
Diaphragm and bulkhead plates to angle connection
• Hex head bolts, galvanized, 3/4”-10 x 2 ½”, Grade ASTM A325. Estimated quantity of two-hundred (200).
• Hex nuts, galvanized, 3/4”-10, Grade DH meeting ASTM A563. Estimated quantity of two-hundred (200).
• 3/4” structural washers, galvanized, ASTM F436 Type 1. Estimated quantity of two-hundred (200).
• 3/4” galvanized direct-tension indicating washers with dye, meeting ASTM F436 Type 1. Estimated quantity of two-hundred (200).
Beam flange to bulkhead plate connection
• Hex head bolts, galvanized, 1”-8 x 4”, Grade ASTM A325. Quantity of sixteen (16).
• Hex nuts, galvanized, 1”-8, Grade DH meeting ASTM A563. Quantity of sixteen (16).
• 1” structural washers, galvanized, ASTM F436 Type 1. Quantity of thirty-two (32).
• 1” galvanized direct-tension indicating washers with dye, meeting ASTM F436 Type 1. Quantity of sixteen
(16).
o A total of two (2) structural washers, one (1) direct-tension indicating washer, and one (1) nut shall be used on each bolt.
The contractor shall remove and replace the wide-flange beam and various structural components in the following proposed order. Prior to the start of work, the government and contractor will agree on the order work shall be completed:
1) The government will operate the gate into the opened or recessed position. From here, the contractor can enter a pit to access the work area, or work can be done via a barge and scaffolding from the water. Confined space entry permits are required to access the gate pocket. Air monitoring is required if hot work is performed as oxygen levels may diminish.
2) The contractor shall secure the gate in the opened position via anchors in the top of the concrete wall and come-alongs attached to the gate. The contractor shall coordinate with the government to establish two separate anchor points. Each anchor point shall be capable of supporting a minimum 4 tons of force.
3) Remove the single section of timber fender and steel channel on the outside (water side) of the gate. The channel is welded to the gate. Set aside as the channel and fender shall be replaced later.
4) Block the 8” diameter hydraulic cylinder in the rear under the house. This will prevent damage to the cylinder and the clevis from rising when it is disconnected in the next step.
5) Disconnect the twelve (12) 7/8” diameter rods which secure the clevis to the wide flange beam. Four (4) of these rods penetrate through the outer bulkhead plate. Discard bolts.
6) Coordinate with the government to fully retract the cylinder, pulling it away from the W14x90 beam. The contractor shall expect only a fraction of an inch of retraction. The cylinder cannot be moved from here unless the body is unbolted, hydraulic lines disconnected, and physically moved back. Retain the steel shim plate for reuse.
7) On the outside or water side of the gate, there is a large plate known as the bulkhead plate. The bulkhead plate is approximately 8’ 8 ½” x 3’ 10 3/8”, and there are two layers of it, along with a filler plate between the inside layer and the beam. At each side of the bulkhead plate to be removed, there are 10” wide vertical plates to be removed which secures the bulkhead plate. At the pivoting side of the gate, there are two layers of plates. The outer plate is a 10” x 1” plate, which can be removed and set aside for later reuse. The inner plate is 10” x 5/8” and runs the full height of the gate. The plate shall be cut just below where the bulkhead plate to be removed is. The top of the 10” plate shall then be unbolted from the gate and disposed of, while the lower section of this plate shall remain. There is a variety of solid rivets and bolts which shall be removed. Retain the other 10” x 1” vertical plate as it shall be reinstalled later. Dispose of the removed rivets and bolts, as longer ones will be required later.
8) Remove the rivets on the angles at the top and bottom of the bulkhead plate. These angles will be replaced with new angles, of an equal size, galvanized A36 steel. Refer to the drawings for angles to be replaced.
9) Remove the W14x90 beam and recycle off-site. Care must be taken not to damage the hydraulic cylinder.
Any damage to government property shall be repaired or replaced by the contractor at the contractor’s expense.
10) In each side of the gate pocket, there are steel plates, known as diaphragm plates. Remove the diaphragm plates and angles as shown in the drawings. Recycle the plates and angles off-site.
11) Drill two (2) new 15/16” holes in both the clevis eye mounting and shim plate. The plate shall be modified in place, as removal of the plate includes removing the pressed-in pin from the bearing inside the clevis eye. One hole will go in each the top and bottom row of bolts. Two (2) new 7/8” bolts will be added later, for a new total of fourteen (14) bolts to secure the plate to the beam.
12) The government will inspect all work and determine if demolition is complete. The new plates and beams shall not be installed until government approval is given.
13) Apply two (2) coats of cold galvanizing compound to any areas where paint has been damaged or surface modified.
14) Insert the two (2) new diaphragm plates onto each side of the beam, including angles. The diaphragm plates are approximately 3’ 11 5/8” x 3’ 5/8” x 3/8”. Bolt the perimeter of each plate to the new angles using 3/4” hex head bolts. Use a direct tension indicating washer and tighten until dye is seen.
15) Insert the new W14x211 beam from the water side of the gate and secure to the vertical angle with 3/4” hex head bolts. Use a direct tension indicating washer and tighten until dye is seen. Verify proper mounting location as the hydraulic cylinder clevis eye mounting plate will later be joined to this. There is some small play allowed in the two axes of the hydraulic cylinder assembly.
16) Insert the bulkhead plate and bolt to the flange of the beam and the angles, using 1” bolts. The bolts shall be installed with 1” tension-indicating washers. Install a structural washer between the tension-indicating and nut or bolt head. Tighten until indicating dye is seen.
17) Install the new 10” x 5/8” vertical plate on the water side of the gate using new bolts, length to be determined by the contractor. Install the existing 10” x 1” plate which was removed and set aside earlier. New A325 bolts are required. The contractor shall determine the length of fasteners required, as there is now extra thickness and a longer length is required than what was removed. Use a direct tension indicating washer and tighten until dye is seen.
18) The government will extend the hydraulic cylinder for the clevis eye mounting plate to meet the beam. Insert the shim plate that was removed earlier. The nuts shall be on the hydraulic cylinder side. Use thread locker on the nuts.
19) Bolt the mounting plate to the beam using 7/8” bolts. Install a 7/8” tension-indicating washer. Install a structural 7/8” washer between the tension-indicating and nut or bolt head. Tighten until indicating dye is seen.
20) The government will perform a joint inspection with the contractor.
21) After inspection acceptance is given, reinstall the timber fender and steel channel by welding the channel back to the gate.
22) Remove the come-alongs securing the gate.
23) The government will operate the gate and perform a final inspection with the contractor to ensure work meets the contractual requirements.
The contractor shall supply to the government red-lined construction drawings as part of a project closeout submittal.
Payment for this line item will be one lump-sum payment when the final inspection is accepted by the government.
5.2 Detailed Description of Work –Optional Bid Item(s)
5.2.1 Optional Bid Item 2 – Replace Corroded Sections of the Steel Catwalk Structure The steel catwalk on the Upper West gate has several members which are corroded and require replacement. The contractor shall remove and replace two (2) existing wide flange beams.
The contractor shall have the following structural steel sections fabricated prior to start of work. The contractor shall field verify all dimensions, existing channel spacing, weld locations, and any bolt size and spacing. All materials shall be submitted to the government as a preconstruction submittal prior to ordering:
• W4x13 beam, ASTM A992 high strength low alloy steel, approximately 140”. Quantity of one (1). Apply a
G100 hot-dipped galvanized coating meeting ASTM A123.
• W4x13 beam, ASTM A992 high strength low alloy steel, approximately 48”. Quantity of one (1). Apply a
G100 hot-dipped galvanized coating meeting ASTM A123.
• 2” x 2” x ¼” tee bar, A36 steel. Quantity of one (1). Apply a G100 hot-dipped galvanized coating meeting
ASTM A123.
The contractor shall remove and replace the existing approximate 140” long W4 beam and the supporting members of the catwalk as follows:
1) The government will operate the gate into the opened or recessed position. In this position the contractor is not required to use fall protection. If work is done in the closed gate position, fall protection or PFD’s will be required.
2) The contractor shall attempt to leave the angle supporting the guardrail in place, and remove the beam welded underneath it for replacement.
3) Remove the plates and angle used for the ramp support at the end of the gate, but keep the side ramp mounting brackets in place. Also remove the lateral beam that connects between the two main beams.
4) Remove the existing 140” beam and recycle off site.
5) The government will inspect all work and determine if demolition is complete. The new steel shall not be installed until government approval is given.
6) Insert the new W4x13 beams (field workers will determine the order of installation), and weld into place.
7) Install the tee bar upside down above the lateral beam to support the ramp by welding to both guardrail angles and the beam.
8) Apply two (2) coats of galvanizing compound to any areas where paint has been damaged or welds have been placed.
9) The government will operate the gate and perform a final inspection with the contractor to ensure work meets the contractual requirements.
Payment for this line item will be one lump-sum payment when the final inspection is accepted by the government.
5.2.2 Optional Bid Item 3 – Supply Steel Walkway Grating
Contractor shall supply and install a variety of plank grating for the catwalks on three (3) gates. The grating shall meet the following specifications. Quantities are totals for all three gates:
• 3 diamond wide plank grating, 7” width, 12 gauge ASTM A653 steel, serrated surface, 2 ½” depth, G90 galvanized coating meeting ASTM A123, approximately 48” in length. Quantity of one-hundred ninety five (195).
• 2 diamond wide plank grating, 4 ¾” width, 12 gauge ASTM A653 steel, serrated surface, 2 ½” depth, G90 galvanized coating meeting ASTM A123, approximately 48” in length. Quantity of thirty (30).
Each gate has several sections of grating that will require modification to fit around obtrusions such as lifting eyes. The contractor shall verify the approximate 48” length of grating is applicable to all gates prior to ordering materials.
Payment for this line item will be one lump-sum payment when the materials have been delivered to the government and acceptance is completed.
6 Project Information
6.1 Basis for Award
The government shall award the contract to the offeror who provides the lowest priced technically acceptable offer.
The evaluated price shall include the base work plus all option(s). In order to be considered technically acceptable, the contractor shall:
• Have a minimum of (5) years’ experience on projects of a similar nature. The contractor shall supply the names, locations, and client contact information for two (2) projects of similar size and scope that have been accomplished within the previous five (5) years as part of the bid submittals. Similar projects include structural steel work on lock or dam structures, bridges, and buildings.
6.2 Period of Performance
The project completion date is set at forty-five (45) days following the initial award of the contract. In the event the contractor is unable to meet the project completion date, requests for extensions must be made in writing. The request must explain, in detail, why the original project completion date will not be met. The request shall be sent to the DCO along with an informational copy to the Project Manager (PM). The request shall be made as soon as possible, but not later than ten (10) days prior to the original completion date. This request shall not negate penalties for liquidated damages unless an extension is granted by the DCO in writing.
6.2.1 Pre-Construction Submittals
All pre-construction submittals, as stated in Section 18.2 of this SOW, shall be provided to the government within fourteen (14) days following the award of the contract. The contractor shall allow up to twenty-one (21) days from time of receipt for government review of submittals. Work may not begin until government approval of all submittals required in Section 18.2 of this Statement of Work.
6.2.1.1 Project Timeline
As part of the pre-construction submittals, the contractor shall supply a timeline or schedule for accomplishing the work showing the following minimum milestones and completion dates: submittal completion date, start date, 100% completion date.
6.3 Pre-Construction Meeting
Following the award of the contract and review and acceptance of the contractor’s pre-construction submittals, the prime contractor must attend a mandatory pre-work conference. The meeting shall be scheduled by the government, and conducted on-site, at the US Army Corps of Engineers Buffalo District Reservation, at a time and date to be announced following the award of the contract.
6.4 Work Schedule
All scheduled work is to be performed Monday through Friday 0700-1930 hours, excluding federal holidays. If the contractor desires to work beyond the previously stated hours and days, written permission to do so shall be obtained from the government. Schedule changes shall be requested at minimum 24 hours in advance, unless there is an emergency situation.
6.5 Material/Equipment Information
Contractor shall provide all labor, tools, ladders, scaffolding, equipment, supplies and materials needed to complete the work described herein, unless otherwise noted herein that any of these items will be provided by the government.
6.6 Dimension/Quantity Verification
Contractor shall independently measure and verify all dimensions and quantities given herein prior to ordering materials and supplies for the project. This information shall be provided to the government QA person as part of the pre-work submittals.
6.7 Material Storage
If temporary storage of project material is requested, the contractor shall make a written request to the government’s QA person and receive written approval from the government. If material is found to be hazardous, flammable, combustible, etc., the contractor will be required to provide the appropriate hazardous material storage locker. Storage locations will be discussed at the pre-bid site visit and during the pre-con meeting. See Section 16 of this SOW for further information.
6.8 Site Cleanup
All excess, waste, and removed material related to this project shall become the contractor’s property and shall be promptly removed from the site and disposed of or reused/recycled in accordance with applicable local, state, and federal regulations. Documentation describing disposal of material shall be furnished to the government as part of the project closeout files. The contractor shall not dispose of any project generated waste in government receptacles or on government grounds.
7 Quality Assurance (QA)
7.1 Overview
7.1.1 Government Project Manager (PM)
The government has appointed a Project Manager (PM) for this project. The PM shall ensure all questions of a technical nature concerning the contractual work are answered.
7.1.2 Government Quality Assurance (QA)
The government will appoint a Quality Assurance (QA) person to ensure all work is accomplished in accordance with contractual documents. The QA person for this contract will be identified after the contract is awarded. The QA person serves as the liaison between the contractor, PM, and the DCO. The QA person does not have the authority to modify contractual agreements.
7.1.3 Government Inspections
Contractor shall allow inspection by the government PM, QA person, DCO personnel, and District Safety and Health personnel, at any time during the life cycle of the project. The contractor shall provide safe access for government personnel visiting the project.
7.1.4 Product Data Sheets
The contractor shall provide to the government product data sheets from the manufacturer for all materials used on this job, as part of the pre-construction submittals. All materials shall be delivered to the project site in new condition, in their original containers and wrapping material, with labels clearly showing all product information.
8 Communication
During the execution of the contract, the PM shall receive weekly status reports from the contractor on issues such as milestones met and/or missed, and issues standing in the way of project completion. The DCO shall be the communication hub for the government QA Person, PM, and the contractor regarding clarification of contractual issues. By adhering to the established lines of communication, it will reduce or avoid generation of duplicate requests for information, which may inadvertently result the government or the contractor to the acceptance of contractual changes without official approval by the DCO.
9 Repair/Restoration of Government Property Contractor, at no expense to the government, is required to protect all government facilities, grounds, equipment, sidewalks, and pavement during construction. All government structures, grounds, and equipment disturbed by contractor during the performance of work shall be returned to a pre-work condition prior to request of final payment.
Damages to government property that were caused by contractor and/or sub-contractor will be repaired at no expense to the government by the prime contractor.
10 Work Stoppage, Contract Cancellation Actions The Lock Master of Black Rock Lock, PM, or government QA person may issue temporary “Stop Work” notification if they find activities or job site conditions are in violation of Federal, Department of Defense, State or local health, safety and/or environmental standards, laws and regulations. The District Safety Officer (DSO), the DCO, and the PM shall be contacted immediately after a Stop Work notification order is issued or rescinded. Violation of health, safety or environmental regulations committed by the contractor shall not be grounds for compensation by the government to the contractor. Refer to contractual documents provided by the District Contracting Office regarding additional work stoppage and/or contract cancellation actions.
11 Material Change Orders Once equipment and materials are approved and accepted by the government, the contractor shall not substitute equipment or materials without providing a detailed explanation for the substitution. Changes in materials will require full justification and approval from the DCO. Modifications to contractual documents must be reviewed by the contractor, government QA person and PM, and approved by the government’s DCO. Requests for modifications must be in writing explaining the reasons for the modification, detailed description of the modification and what the benefits are and an estimated cost broken down by materials, labor and equipment.
12 Liquidated Damages Liquidated damages of $950 per calendar day will be assessed if the work is not completed within the time period described in Section 6.2 of this Statement of Work. Liquidated damages shall be assessed beginning the day following the end of the initial period.
13 Inspection/Testing
13.1 Pre-Final/Final Inspection
Upon completion of the work, the government will perform a pre-final inspection to verify that the project is complete. A government pre-final punch list may be developed as a result of this inspection. If contractual requirements are not met, this list shall be provided to the DCO, who will bring them to the attention of the contractor.
The contractor’s QC supervisor shall ensure that all items on this list have been corrected in a timely manner before notifying the government, so that a final inspection with the government and contractor can be scheduled. The contractor’s QC supervisor, PM, DCO representative, and QA person shall be in attendance at the final acceptance inspection.
14 Completion The contract will not be deemed fulfilled until all submittals, products, services, equipment, material, installation, construction work, and final inspection is provided by the contractor under the terms of the contractual documents and found satisfactory to the DCO.
15 Payment The project will be paid for on a lump sum basis, the price for which includes all labor, materials, equipment, mobilization/demobilization, disposal, and other costs required to complete the work. Partial payment(s) may be made; this will be discussed at the pre-construction meeting.
16 Safety
Refer to Attachment #4 for government safety requirements.
17 Security
17.1 Access and General Protection/Security Policy and Procedures All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures, which will be provided by a government representative. The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by the Army Corps of Engineers (USACE) Buffalo District Emergency Management Office. Contractor workforce must comply with all personal identity verification requirements as directed by the Department of Defense (DOD), Headquarters Department of the Army (HQDA) and/or USACE Buffalo District policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the government may require changes in contractor security matters or processes.
17.1.1 Candidate Pre-Screening
The contractor must pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
17.1.2 Background Investigation
For all prime and subcontractor employees working at the Black Rock Lock, the following Personally Identifiable Information (PII) shall be provided for the US Army Corps of Engineers to perform a limited background check:
Complete name, social security number, driver’s license number, date of birth, place of birth, and current address of residence. This information is mandatory before any workers will be allowed to enter the facility. The contractor shall allow up to twenty-one (21) days from time of receipt for government completion of background checks. Work may not begin until government clearance of employees is given to the prime contractor.
17.1.3 Access Badge
In order to grant access to the Buffalo District Reservation and Black Rock Lock, all employees will be required to turnover a valid photo ID on a daily basis to the security guard. Employees shall be given a visitor badge which shall be worn at all times on the premises. The photo ID will be returned once the employee leaves the premises.
17.1.4 Suspicious Activity Reporting Training
The contractor and all associated sub-contractors shall receive a brief/training provided by the PM on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the PM no later than five calendar days after the completion of the training.
17.2 Start of Work
Contractor shall notify the PM of their planned arrival at the project to start work at least seven (7) calendar days in advance. Contractor shall submit a weekly work schedule thereafter by no later than the Friday before the coming work week.
17.3 Arrival/Departure
Contractor is required to notify the government QA person or Lockmaster of their arrival to and departure from the project site. A similar notification is required if there shall be any deviation or cancellation of a scheduled work day during the life of the project.
17.4 Video/Camera Equipment
Contractor shall not transport or use video or camera equipment while working at Black Rock Lock unless permission to do so is requested through the Lockmaster and approval is granted by the Buffalo District Security Officer.
18 Submittals
18.1 Bid Submittals
The following submittals are required from the contractor under this Scope of Work to be submitted with the bid proposal:
• Complete Bid Schedule with prices for all base and optional items. (See Attachment #2)
• Contractor experience as stated in Section 6.1
• Other documentation as required by the DCO:
o Representations and certifications
18.2 Pre-Construction Submittals
All submittals are required as per the timeline described in Section 6.2 of this SOW:
• Contractor timeline showing start and completion of contractual work
• Contractor employees Personally Identifiable Information (PII)
• Accident Prevention Plan (APP) with Activity Hazard Analysis (AHA’s): Safety and health submittals as described in Attachment #4 of this Scope of Work will be submitted to the DCO. Safety and health submittals will be reviewed and accepted in writing by the DSO prior to commencement of work.
• Shop drawings of work in Base Bid Item 1
• All materials/equipment data sheets provided under the contract, including but not limited to:
o All structural members, fasteners, and other parts ordered under this contract
18.3 Project Completion Submittals
All submittals are required as per the timeline described in Section 6.2 of this SOW:
• All required submittals required under this contract
• Contractor warranty for all work performed under this contract
• Monthly Man-Hour Exposure Report
END OF STATEMENT OF WORK
Attachment #1 – Drawings Attachment #2 – Bid Schedule Attachment #3 – Directions to Black Rock Lock Attachment #4 – Government Safety Requirements Attachment #5 – Accident Prevention Plan Checklist Attachment #6 – Blank Activity Hazard Analysis Attachment #7 – USACE Buffalo District Monthly Man Hour Exposure Report
Attachment #1 – Drawings
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
VICINITY MAP
SCALE OF MILES
50 0 50 100
PENNSYLVANIA
OHIO
NEW
YORK
CLEVELAND
DETROIT
LAKE
ERIE
LAKE ONTARIO
LAKE
HURON
ONTARIO
N
BUFFALO
LOCALITY MAP
CANADA
TONAWANDA
N
SHERIDAN DRIVE
M A I
N
S T
R E E T
BROADWAY
E G
G E
R T
R O
A D
D E
L A
W A
R E
E L
M W
O O
D
B A I
L E
Y
A V
E N
U E
SCALE OF MILES
1 1 2•
WOODWARD
ISLAND
GRAND
RIVER
NIAGARA
ERIE
LAKE
BUFFALO
OF
CITY
D1
PROJECT LOCATION
LOCALITY MAPS
VICINITY &
D7CONNECTION DETAILS
D6CROSS SECTION DETAILS
D5PLAN OF NEW WORK
D4DEMOLITION PLAN
D3EXISTING GATE LAYOUT
D2BLACK ROCK LOCK
D1VICINITY AND LOCALITY MAPS
NUMBERDRAWING NAME
DRAWING LIST
BUFFALO, NEW YORK
BLACK ROCK CHANNEL
MITER GATE REPAIR
LOWER-RIVER(WEST)
BLACK ROCK LOCK
REPRESENTATIVE (COR).
TO THE APPROVAL OF THE CONTRACTING OFFICIER'S
ALL ADJUSTMENTS TO THE NEW WORK DIMENSIONS ARE SUBJECT
SHOWN ON THE DRAWINGS AS REQUIRED FOR A PROPER FIT.
MAKE ANY NECESSARY ADJUSTMENTS TO NEW WORK DIM.
CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS, AND4.
SIZE USING A36 STEEL UNLESS SPECIFIED OTHERWISE.
REPLACED, MUST BE REPLACED WITH MEMBERS OF EQUAL
ALL ANGLES AND PLATES THAT ARE TO BE REMOVED AND 3.
IN THE SAME LOCATIONS AS THE REMOVED RIVETS.
GALVANIZED HEX HEAD BOLT AND WASHERS WITH A 3/4" DIA.
MITER GATE MUST BE REPLACED WITH ASTM A325 STEEL
ALL RIVETS THAT ARE REMOVED DURING THE REPAIR OF THE2.
EDITION (AISC 360-10) SPECIFICATION.
INSTITUTE OF STEEL CONSTRUCTIONS STEEL MANUAL 14TH
ALL CONNECTIONS MUST BE INSTALLED AS PER AMERICAN 1.
GENERAL NOTES:
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
D2BLACK ROCK LOCK
MITER GATE NEEDING REPAIRS
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
D3
3/8" SKIN PLATE
3/8" WEB PL (TYP)
5/8"x8" (TYP)
STIFFENER PLATE
MITER TIMBER
R=30'-7" R=30'-7"4
5'-2" 6'-3"
6'-3" 5'-2"
POCKET WITH FAILED BEAM
7'-10" (TYP)
A
D4
UPSTREAM SIDE DOWNSTREAM SIDE
LOWER-RIVER MITER GATE PLAN VIEW
TYPICAL CROSS SECTION
LOWER-RIVER MITER GATE
TIMBER FENDER
4' 8'0 2'
4' 8'0 2'
SAFETY LADDER
LAYOUT
EXISTING GATE
QUOIN AREA
WHEN GATE IS MITERED
APP. CENTERLINE OF CYLINDER RAM
WHEN GATE IS MITERED
APP. CENTERLINE OF CYLINDER RAM
(TYP)
DIAPHRAGM PLATE 3/8"
TO BE REPLACED
FAILED BEAM
NOTE 6 ON DRAWING D4
BUTTERFLY VALVES AT BASE OF GATE, SEE
HYDRAULIC CYLINDER USED TO OPERATE
TO REMAIN (TYP)
STEEL ANGLE
DECIDED UPON BY CONTRACTOR AND COR.
OF FENDER TO BE REMOVED MUST BE JOINTLY
THE COMPLETION OF THE CONTRACT. EXTENT
CONSTRUCTION AND THEN REINSTALLED AT
CHANNEL ARE TO REMOVED AT THE START OF
TIMBER FENDER AND ATTACHED STEEL2.
BEAM POCKET.
PLATE THAT RUNS THE FULL LENGTH OF THE
THERE IS AN OPENING IN THE UPSTREAM SKIN1.
NOTES
CYLINDER ROD
HYDRAULIC RAM
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
D4DEMOLITION PLAN
BEAM FLANGE
TO BE REMOVED
5/8" BACKING PLATE
TO BE REMOVED
W14x90 BEAM
TO BE REMOVED
2 ANGLES
TO BE REMOVED
2 ANGLES
CYLINDER RAM
TO BE REMOVED AND REPLACED
3/8" PLATE DIAPHRAGM
AND REPLACED
TO BE REMOVED
L3-1/2x3-1/2x3/8
BEAM WEB STIFFENERS
BEAM TO BE REMOVED
AND REPLACED
TO BE REMOVED
L3-1/2x3-1/2x3/8
L4x3-1/2x3/8 ANGLE
TO BE REMOVED AND REPLACED
3/8" PLATE DIAPHRAGM
BACKING PLATE TO BE REMOVED
TO BE REMOVED
BULKHEAD PLATE
EXISTING BEAM POCKET DEMOLITION CROSS SECTION
APP. 5 1/2" RIVET SPACING (TYP)
3/4" DIA RIVET (TYP)
SCALE: 3/4"=1'-0"
A
D3
EXISTING BEAM POCKET DEMOLITION PLAN
2' 4'0 1'
TO BE REMOVED
3/8" BULKHEAD PLATE
3/8" PLATE
3/8" PLATE
TO BE REMOVED AND REPLACED
3/8" PLATE DIAPHRAGM
TO BE REMOVED AND REPLACED
L3-1/2x3-1/2x3/8 ANGLES IN BEAM POCKET
AND REPLACED
TO BE REMOVED
IN BEAM POCKET
3/8" DIAPHRAGM PLATE
REMOVED AND REPLACED
(2) L4x3-1/2x3/8 ANGLES TO BE
REMOVED AND REPLACED
(2) L4x3-1/2x3/8 ANGLES TO BE
AND REPLACED
TO BE REMOVED
(2) L4x3-1/2x3/8
AND REPLACED
TO BE REMOVED
(2) L4x3-1/2x3/8
SEE NOTE 5
REMOVED AND REPLACED,
10"x5/8" TO BE
SEE NOTE 5
REMOVED AND REPLACED,
10"x5/8" PLATE TO BE
SEE NOTE 7
10"x1" PLATE, PLATE TO BE REMOVED
2ND 3/8" EXTERIOR
DISTURB
VALVES, SEE NOTE 6; DO NOT
CYLINDER FOR BUTTERFLY
APP. LOCATION OF HYDRAULIC
PLATE AT THE COMPLETION OF THE REPAIR.
THE DOWNSTREAM FACE OF NEW 10x5/8"
CONSTRUCTION AND THEN REINSTALLED TO
PLATE IS TO BE REMOVED AT THE START OF
DOWNSTREAM FACE OF THE 10x5/8" STEEL 10"x1" PLATE CONNECTED TO THE 7.
ADDITIONAL DRAWINGS.
MEMBERS. THE CYLINDER IS NOT SHOWN ON
INSTALLATION OF NEW STRUCTURAL
THAT IT WILL NOT INTERFERE WITH
IS ONLY SHOWN ON THIS DRAWING TO SHOW
HYDRAULIC CYLINDER FOR BUTTERFLY VALVE 6.
PLATE. SEE DETAIL "D" ON DRAWING D7.
OVERLAP EXISTING LOWER SECTION OF 10x5/8
EXCEPTION THAT THE NEW PLATE IS TO
LOCATION AS THE TOP SECTION WITH THE
PLATE IS TO BE INSTALLED IN THE SAME
OF NEW BULKHEAD PLATE A NEW 10"x5/8"
SECTION REMAINING. AFTER INSTALLATION
PLATE MUST BE REMOVED WITH THE LOWER
BULKHEAD PLATE. THE TOP SECTION OF THIS
ALONG THE BOTTOM EDGE OF THE NEW 3/8"
THE 10"x5/8" VERTICAL PLATES ARE TO BE CUT 5.
THE FIELD BY CONTRACTOR AND COR.
EXTENT OF REMOVAL IS TO BE JOINTLY SET IN
ORDER TO REPLACE THE BULKHEAD PLATE.
BE REMOVED AND REPLACED AS REQUIRED IN
TIMBER FENDERS NOT SHOWN ARE ALSO TO 4.
APPROVAL OF COR.
UNLESS LISTED AS SUCH ON PLANS OR AT THE
NO MEMBER IS TO BE REMOVED FROM GATE 3.
EXPENSE.
REPLACED BY THE CONTRACTOR AT THEIR
OF OLD RIVETS, THAT MEMBER MUST BE
REMOVAL IS DAMAGED DURING THE REMOVAL
IF A MEMBER THAT IS NOT MARKED FOR 2.
CONNECTION DETAIL.
TO ALLOW FOR THEM TO BE REUSED IN NEW
SUCH A WAY AS TO NOT DAMAGE THEM AND
DISCONNECTED FROM EXISTING BEAM IN
CYLINDER RAM AND RAM EYE MUST BE 1.
NOTE:
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
D5
RAM CYLINDER
RAM EYE CONNECTION
A
D6
B
D6
A
D7 B
D7
2' 4'0 1'
6" SPACING (TYP)
S P
A C
IN
G
T Y
P
A P
P
VIEW OF NEW WORK
UPSTREAM COSS SECTION
0 1' 2'
NEW WORK
PLAN OF
SEE NOTE 2
EXISTING 10"x1" PLATE
REPAIR.
SAME LOCATION AT THE COMPLETION OF THE
THE REPAIR AND THEN REINSTALLED IN THE
PLATE IS TO BE UNINSTALLED AT THE START OF
DOWNSTREAM SIDE OF THE 10"x5/8" STIFFENER THE 10"x1" STEEL PLATE THAT IS ON THE 2.
L4x4x1/2 ANGLES TO DIAPHRAGM PLATES.
STEEL). THIS INCLUDES BOLTS CONNECTING
MITER GATE MUST BE 1" DIA. TYPE A (A325
ALL BOLTS CONNECTING NEW BEAM TO 1.
NOTES:MARK (L1)
MARK (L2)
MARK (L6)
MARK (L7)
MARK (L14)
MARK (L13)
MARK (L8)
MARK (L9)
PLATE, MARK (P1)
NEW 3/8" DIAPHRAGM
MARK (L3)
STEEL ANGLE,
NEW L4x4x1/2
MARK (L10)
STEEL ANGLE,
NEW L4x4x1/2
MARK (P2)
NEW PL 10x5/8", 3/4" BULKHEAD PLATE, MARK (P3)
NEW GR. 50 STEEL
MARK (P4)
NEW PL 10"x5/8", MARK (P5)
PLATE,
DIAPHRAGM
NEW 3/8"
MARK (B1)
NEW W14x211 BEAM, NEW 3/4" BULKHEAD PLATE
ABOVE TOP OF BEAM POCKET
10x1" PLATE EXTENDS APP. 18"
SEE NOTE 1
SEE NOTE 1
SEE NOTE 1
D7
SEE DETAIL "D" ON DRAWING
REPLACING EXISTING PLATE
NEW 10x5/8" COVER PLATE
UPSTREAM CROSS SECTION VIEW OF NEW WORK
REMOVED AND REINSTALLED
EXISTING 10x1" PLATE
"2
1'-11
"2
8'-8
" SPACING (TYP)2
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
D6
REPLACED
DIAPHRAGM TO BE
3/8" STEEL PLATE
NEW W14x211 BEAM
11" (TYP)
(T
Y P
TO REMOVE AND REPLACE
L3 1/2x3 1/2x3/8 ANGLE
TO REMOVE AND REPLACE
L3 1/2x3 1/2x3/8 ANGLE
REPLACED
DIAPHRAGM TO BE
3/8" STEEL PLATE
TO REMAIN
L6x6x5/8 ANGLE
TO REMAIN
L4x3 1/2x3/8 ANGLE
TO REMAIN
L4x3 1/2x3/8 ANGLE
PLATE
DIAPHRAGM
3/8" THICK (2) L4x4x1/2 ANGLES
7"
3"
VERTICAL CROSS SECTION
SCALE: 3/4"=1'-0"
A
D5
VERTICAL CROSS SECTION
SCALE: 3/4"=1'-0"
B
D5 DETAILS
CROSS SECTIONS
MEMBERS ARE SHOWN IN BE BELOW TABLE.
STEEL GRADES FOR ALL NEW REPLACEMENT 2.
TYPE A (A325 STEEL) BOLTS.
ANGLES TO DIAPHRAGM PLATES MUST BE 1" DIA.
L4x4x1/2 ANGLES AND CONNECTING L4x4x1/2
ALL BOLTS CONNECTING NEW BEAM TO NEW 1.
NOTES
(2) L4x4x1/2 STEEL ANGLES
STEEL ANGLES
(2) L4x4x1/2
MARK (L4)
MARK (L5)
MARK (L11)
MARK (L12)
REPLACE
TO REMOVE AND
L4x3-1/2x3/8" ANGLE
REPLACE
TO REMOVE AND
L3-1/2"x3-1/2x3/8" ANGLE APP. 8'-10" A36A3610"x5/8" PLATEP2, P4
"8
"x3'-10 2
8'-8 GR. 50A5723/4" PLATEP3
"8
"x3'-5 8
3'-11 A36A363/8" PLATEP1, P5
"8
2'-9 A36A36L3-1/2x3-1/2x3/8L5, L12
"8
3'-2 A36A36L3-1/2x3-1/2x3/8L2, L9
2'-5 A36A36L4x3-1/2-3/8L1, L8
"8
2'-5 A36A36L3-1/2x3-1/2x3/8L6, L7, L13, L14
7"GR. 50A572L4x4x1/2L3, L4, L10, L11
"8
7'-9 GR. 50A992W14x211B1
LENGTHGRADESTEELMEMBER SIZEMARK
STEEL MEMBER SIZING
TO REMAIN
L6x6x5/8 ANGLE
SEE NOTE 1 (TYP)
NEW BOLT LOCATION
TO REMOVE AND REPLACE
(2) L4x3 1/2x3/8 ANGLE
TO REMOVE AND REPLACE
(2) L4x3 1/2x3/8 ANGLE
A P
P
"8
2'-9
"4
4 "8
3'-2
" (TYP)2
S A
F E
T Y P
A Y
S
S U
P P
O R
T V
A L
U E E
N G
IN
E E
R
IN
G I T P
A Y
S
ID
Figure of Engineers
US Army Corps
Buffalo District
BLACK ROCK LOCK
BLACK ROCK CHANNEL
BUFFALO, NEW YORK
LOWER-RIVER(WEST) MITER GATE REPAIR
D7DETAILS
CONNECTION
A
D5
RAM EYE CONNECTION
SCALE: 1"=1'-0"
W14x211 BEAM
B
D5 SCALE: 3"=1'-0"
BEAM NOTCH
NEW W14x211 BEAM
R=1/2"
SEE NOTE 1
L4x4x1/2" ANGLE
2"
C
D5
DIAPHRAGM PLATE
REPLACEMENT 3/8"
SCALE: 3/4"=1'-0"
PLATE
NEW 10"x5/8"
D
D4
OVERLAP DETAIL
VERTICAL 10x5/8" PLATE
"=1'-0"2
SCALE: 1
NEW 3/4" BULKHEAD PLATE
5/8" PLATE IS TO BE CUT
LOCATION WHERE EXISTING
SEE NOTE 3
EXISTING 2" THICK PLATE
SEE NOTE 4
SEE NOTE 4
NEW 3/4" BULKHEAD PLATE
DIAPHRAGM PLATE
3/8" THICK
EXISTING BOLT HOLES
APP. LOCATION OF
NEW BOLT(TYP)
7/8" A325 BOLTS
ARE TO BE 7/8" DIA. OF A325 STEEL.
SHOWN. THE BOLTS FOR THESE HOLES
LOCATIONS OF NEW HOLES ARE AS
DRILLED INTO EXISTING RAM EYE PLATE.
TWO NEW BOLT HOLES ARE TO BE 4.
PLATE.
PLATE TO THE NEW OVERLAPPING 10x5/8" REMAINING SECTION OF THE 10x5/8"
LONGER BOLTS MUST CONNECT THE
WITH NEW LONGER BOLTS. THESE
TO BE REMOVED AND BE REPLACED
SECTION OF THE 10x5/8" PLATES ARE
THE BOLTS ALONG THE REMAINING 3.
1-1/2" EDGE SPACING.
MUST BE 7/8" DIA. A325 BOLTS WITH A
BOLTS IN RAM EYE CONNECTION (14) 2.
DIRECTLY TO 3/8"DIAPHRAGM PLATE.
DIAPHRAGM. THE L4x4x1/2 IS TO CONNECT
BEAM MUST END 3/8" SHORT OF THE 1.
NOTES
REINSTALLED OVER NEW 5/8" PLATE
POCKET EXISTING 10"x1" PLATE IS TO BE
BEAM POCKET, ON QUOIN SIDE OF BEAM
DETAIL SHOWS MITER SIDE OF
10"x1" PLATE
CONTINUE TO BOTTOM OF REINSTALLED EXISTING
BOTTOM OF BULKHEAD PLATE. ON THE QUOIN SIDDE
NEW 5/8" PLATE, ON MITER SIDE CONTINUE 5' BELOW
REMAINING EXISTING 5/8" PLATE
10"x1" PLATE
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .