SOW_-_Enclosure_3_-_12N_Program_of_Instruction.pdf
PDF 3 MB Posted
- Attached to
- MOARNG - Lease - 5 EA John Deere Excavators Federal contract opportunity
- Solicitation number
- W912NS-19-Q-2001
About this file
Enclosure 3 - Program of Instruction
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_Round_3_-_W912NS19Q2001.docx | DOCX document | |
| SOW_-_HYEX_18_Month_Lease_-_Final.pdf | ||
| SOW_-_HYEX_18_Month_Lease_-_Version_3.pdf | ||
| QA_Round_2_-_W912NS19Q2001.docx | DOCX document | |
| SOW_-_HYEX_18_Month_Lease_-_Version_3_-_Changes.pdf | ||
| SOW_-_HYEX_18_Month_Lease_-_Version_2_-_Changes.pdf | ||
| QA_-_W912NS19Q2001.docx | DOCX document | |
| SOW_-_HYEX_18_Month_Lease_-_Version_2.pdf | ||
| Combined_Synopsis_Solicitation_-_W912NS19Q2001.docx | DOCX document | |
| SOW_-_Enclosure_1_-_LUBRICATION_ORDER_HYEX_250G.PDF | ||
| SOW_-_Enclosure_2_-_TM_HYEX_250G.pdf | ||
| Value_Adjusted_Total_Evaluation_Price_-VATEP.xlsx | XLSX spreadsheet | |
| REDACTED_-_JA_-_Other_than_Full_and_Open_-_John_Deere_230G_240G_250G.pdf | ||
| Statement_of_Work_-_HYEX_18_Month_Lease.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Course: 052-12N10 (R) Version: 1 Delivery Group: A Phase: 1 Course Name: Horizontal Construction Engineer Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 1-1
Program of Instruction Cover Page
Total Computed Academic Hours: 100.0
Fiscal Year: 2012 Fiscal Year Quarter: 1
Status Change Date: 08 Mar 2011
Approval Date: 08 Mar 2011
Approval Authority: BRYAN G. WATSON Brigadier General, USA Commandant
MACOM Validation Date:
Manpower Validation Date:
Course Supersession Information: This POI supersedes POI 052-21E10 (R) (DL) (Phase 1) version 2 dated 27 April 2007, POI 052-21E10 (R) (Phase 2 ) version 2 dated 27 April 2007 and POI 052-21E10 (R) (Phase 3) version 2 dated 27 April 2007.
Phase Supersession Information: This POI supersedes POI 052-21E10 (R) (DL) (Phase 1) version 2 dated 27 April 2007 and POI 052-21E10 (R) (Phase 2) version 2 dated 27 April 2007 .
Foreign Disclosure: FD1. The materials contained in this course have been reviewed by the course developers in coordination with the Fort Leonard Wood, MO / MSCoE foreign disclosure authority. This course is releasable to students from all requesting foreign countries without restrictions.
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59
Table of Contents
Cover Page ................................................................................................................... 1-1
Preface .......................................................................................................................... 2-1
Course Summary .......................................................................................................... 3-1
Training Module ............................................................................................................ 4-1
Mandatory Training Module .......................................................................................... 5-1
Examination Module ..................................................................................................... 6-1
Individual Task Summary .............................................................................................. 7-1
Collective Task Summary (Not part of POI) ..................................................................... 8-1
Ammunition Summary ................................................................................................... 9-1
Facilities Summary ...................................................................................................... 10-1
Equipment Summary .................................................................................................. 11-1
Training Support Equipment ....................................................................................... 12-1
Support Personnel Summary ...................................................................................... 13-1
TADSS Summary ........................................................................................................ 14-1
MRAD Headquarters Validation .................................................................................. 15-1
Headquarters Memorandum ....................................................................................... 16-1
Memo of Transmittal ................................................................................................... 17-1
Distance Learning Questionnaire ................................................................................... 18-1
Lesson Sequence (Not part of POI) ............................................................................... 19-1
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 2-1
Preface Page
Fiscal Year: 2012 Fiscal Year Quarter: 1
Status: Commandant Approved
Status Change Date: 08 Mar 2011
Training Location(s): (1007) NG UNIT/SPEC SCHOOLS-NC
(1009) NG UNIT/SPEC SCHOOLS-OH
(1014) NGB REC C SCH, SC
(1022) NG UNIT/SPEC SCHOOLS-WV
(1039) NORTH DAKOTA ENGINEER CTR, DEVILS LAKE, ND FIRST BN,
164th (RTI), REGION G
(974) NG UNIT/SPEC SCHOOLS-AL
(992) NG UNIT/SPEC SCHOOLS-LA
(999) +C364NG UNIT/SPEC SCHOOLS-MO
(R052) EN - Engineer Bde
Specialty: E12N10 Horizontal Construction Engineer
Supporting ITP: 12N Horizontal Construction Engineer
TATS-Course: Yes
Purpose: The purpose of the MOS 12N10 Horizontal Construction Engineer Course is to provide skill level 1 Soldiers with the skills and knowledge required to effectively operate construction equipment and assist in engineering missions.
Course Scope: The Soldier receives MOS-specific training:
Phase 1 consists of 100.0 hours of training that includes: Safety, Environmental Stewardship, The Army Maintenance Management System, Construction Prints, Basic Soils, Grade Stakes, Basic Surveying, Dump Truck Operations, Scoop Loader Operations and Hydraulic Excavator Operations.
Phase 2 consists of 120.0 hours of MOS specific training that includes: Motorized Grader Operations, Crawler Tractor Operations, Motorized Scraper Operations and Backhoe Loader Operations.
Phase Scope: The Soldier receives MOS-specific training on:
Safety, Environmental Stewardship, The Army Maintenance Management System, Construction Prints, Basic Soils, Grade Stakes, Basic Surveying, Dump Truck Operations, Scoop Loader Operations and Hydraulic Excavator Operations.
Course Prerequisites: Reclassification course Soldiers must meet requirements listed in DA Pam
611-21, AR 350-1, possess a valid state motor vehicle operator's license, must report to Phase 1 and 2 training with their DA Form 348 and their Accident Avoidance Class Certificate.
Phase Prerequisites: Reclassification course Soldiers must meet requirements listed in DA Pam
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 2-2
611-21, AR 350-1, possess a valid state motor vehicle operator's license, must report to Phase 1 and 2 training with their DA Form 348 and their Accident Avoidance Course Certificate.
Earthwork Principal's training is the only prerequisite module required in this phase. All Soldiers must attend and successfully complete the Earthwork Principal's training at the beginning of Phase 1 before moving to the round robin method of training.
Special Information: All PPE will be provided by the school.
Soldiers must report to Phase 1 and 2 training with their DA Form 348 and their Accident Avoidance Course Certificate.
All equipment is trained using the Round Robin method of training. Module A must be trained utilizing all 12 students prior to breaking down into the round robin method of training. The dump trucks and students from the dump module can be utilized for the load a haul unit in the loader training. The training times align as does the training duration.
The hydraulic excavator training will require four additional Dumps and licensed operators for load a haul unit in the HYEX training module. The same four support personnel can be utilized as operators in phase 2 for push loading the scraper.
Security Clearance: Unclassified
Course Length– Weeks: 1 Days: 4 Hours: 108
Computed ICH: 280.0
Adjusted TOMA ICH: 0.0
Adjusted MRAD ICH: 0.0
Class Sizes – Optimum: 12 Minimum: 4 Maximum: 12
Academic Hours Computed Adjusted Unique: 100.0 Shared:
Total:
Estimated Flight Hours: 0
Validation Code:
Manpower Estimate: 0
Hours Developed by Others: 0
Hours Conducted by Others: 0
Course Type Code: 98 MOSQ (ADT)
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 2-3
ITRO Code: Q Quota Course/Non-ITRO
Contract Code: N Not a Contract Course
MACOM Validation Date:
Manpower Validation Date:
Training Start Date: 01 Oct 2011
Proponent Design and Development: Engineer School (052) Instructor Provided Support: RCTI GENERIC SCHOOL (0000) Army Course Proponent: Engineer School (052) Training Evaluation Proponent: Engineer School (052)
Course Remarks: All equipment is trained using the Round Robin method of training. Module A must be trained utilizing all 12 students prior to breaking down into the round robin method of training. The dump trucks and students from the dump module can be utilized for the load a haul unit in the loader training. The training times align as does the training duration.
The hydraulic excavator training will require four additional Dumps and licensed operators for load a haul unit in the HYEX training module. The same four support personnel can be utilized as operators in phase 2 for push loading the scraper.
Units must implement and physically be training this course no later than 01 October 2011.
Phase Remarks: All Soldiers must attend and successfully complete the Earthwork Principles training at the beginning of Phase 1 before moving to the round robin method of training.
The round robin method of training consists of all training starting on each piece of equipment at the same time with each group rotating at the same time at the end of each module. For safety reasons, radios must be used during training while Soldiers are operating equipment.
Computation for course length is based on training ten hours per day, seven days per week.
MRAD Remarks:
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 3-1
Course Summary
Academic Time:
Module: A / ADT 40.0 Title: TAMMS/Earthwork Principles
Module: B / ADT 20.0 Title: Dump Truck Operations
Module: C / ADT 20.0 Title: Scoop Loader Operations
Module: D / ADT 20.0 Title: Hydraulic Excavator Operations
Total: 100.0
Administrative Time:
In-Processing 4.0 Out-Processing 4.0
Total: 8.0
Grand Total: 108.0
Academic Hours by Security Classification:
Unclassified 100.0
Total: 100.0
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-1
Training Module
Module: A / ADT
Title: TAMMS/Earthwork Principles
Purpose: The purpose of the Earthwork Principles Operations is to provide skill level 1 Soldiers with the skills and knowledge required to understand Safety, Environmental Stewardship, Utilize the Army Maintenance Management System, Interpret Basic Construction Prints, Identify Basic Soils Properties, Interpret Basic Grade Stakes and perform Basic Surveying Operations to assist in engineering missions.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil.
Technique(s) of Delivery: Hours Large Group Instruction (GP) 3.0 -None- (--) 4.0 PowerPoint Presentation (PP) 37.0
Total Hours (Admin & Academic) 44.0
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10A01 / ADT1 (--) -None-
Introduction: 0.0 (CO) Conference / Discussion Summary: 0.0 (CO) Conference / Discussion
Total: 0.0
Security Clearance: Unclassified
Lesson Title: In Processing
Action Text: NONE
Condition: NONE
Standard: NONE
Remarks: NONE
12N10A02 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.6 (CO) Conference / Discussion
0.2 (DM) Demonstration
Summary: 0.1 (CO) Conference / Discussion Total: 1.0
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-2
Security Clearance: Unclassified
Lesson Title: Introduction to Safety
Action Text: Introduction to Safety
Condition: In a classroom environment given a student handout and guided instruction on safety.
Standard: Introduce and discuss general safety guidelines, types of safety hazards, Personal Protective Equipment (PPE), job site safety and common hand and arm signals. Verbally answers all questions correctly when asked throughout the class.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current
12N10A03 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.8 (CO) Conference / Discussion
Summary: 0.1 (CO) Conference / Discussion Total: 1.0
Security Clearance: Unclassified
Lesson Title: Introduction to Environmental Stewardship
Action Text: Introduction to Environmental Stewardship
Condition: In a classroom environment given guided instruction on environmental stewardship and a student guide.
Standard: Identify and apply all the army's environmental program requirements. Answer all questions correctly when asked throughout the introduction.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A04 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
3.8 (CO) Conference / Discussion
0.5 (DP) Demonstration/Practical Exercise
(Hands-on)
5.0 (P1) Practical Exercise (Hands-on)
Total: 9.5
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-3
Security Clearance: Unclassified
Lesson Title: Utilize the Army Maintenance Management System (TAMMS)
Action Text: Utilize the Army Maintenance Management System (TAMMS)
Condition: In a classroom environment given guided instruction and a practical exercise on utilizing The Army Maintenance Management System (TAMMS), an air compressor, a roller, a demonstration on performing Preventive Maintenance Checks and Services (PMCS), a student handout, TM 5-3805-261-10 and TM 5-2400-237-10.
Standard: Identify and utilize TAMMS IAW DA PAM 750-8. Answer all questions correctly when asked throughout the introduction. Complete all practical exercises without error, and asks questions as needed.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A05 / ADT1 (GP) Large Group Instruction
Introduction: 0.1 (CO) Conference / Discussion
0.8 (TE) Test
0.5 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 1.5
Security Clearance: Unclassified
Lesson Title: The Army's Maintenance Management System Written Examination
Action Text: The Army's Maintenance Management System Written Examination
Condition: In a classroom, given a number 2 pencil, a test booklet, an answer sheet, TM 5-3805-261-10, TM 5-2410-237-10 and a guided block of instruction on testing procedures.
Standard: Complete the Army's Maintenance Management System written examination in 40 minutes and achieved a minimum score of 70%.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A06 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
1.8 (CO) Conference / Discussion
Total: 2.0
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-4
Security Clearance: Unclassified
Lesson Title: Introduction to Construction Prints
Action Text: Interpret Basic Construction Prints
Condition: In a classroom environment, given guided instruction on construction prints, TM 5-581B, and TM 5-704, FM 5-233 a set of construction prints; a road profile; a cross section for a horizontal construction mission; one or more scenarios, pen or pencil, and paper.
Standard: Correctly identify the type of construction drawings, the components in the format for construction drawings, the road plan station numbers and objects, project boundaries, the road profile elevations, and cross sectional cut and fills according to FM 5-233, TM 5-704, TM 5-581B.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A07 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.8 (CO) Conference / Discussion
Summary: 0.1 (CO) Conference / Discussion Total: 1.0
Security Clearance: Unclassified
Lesson Title: Introduction to Basic Soils
Action Text: Identify Basic Soil Properties
Condition: In a classroom environment, given guided instruction and a demonstration on soils properties, a soils test pit, the location of a soil sample with identifying information concerning its origin, soil sieves, and FM 5-472.
Standard: Identify Basic Soil Properties of a given soil sample to include the origin and location of the soil IAW FM 5-472.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A08 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
2.3 (CO) Conference / Discussion
Total: 2.5
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-5
Security Clearance: Unclassified
Lesson Title: Introduction to Grade Stakes
Action Text: Interpret Basic Grade Stakes
Condition: In a classroom, given guided instruction and a practical exercise containing information on centerline, slope, offset, and finish stakes marked with survey information, FM 5-430-00-1, student handout, pen or pencil and paper.
Standard: Identify grade stake types by interpreting the information on the grade stakes in accordance with (IAW) FM 5-430-00-1.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A09 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.8 (CO) Conference / Discussion
0.5 (DM) Demonstration
17.4 (P1) Practical Exercise (Hands-on)
1.0 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 20.0
Security Clearance: Unclassified
Lesson Title: Introduction to Basic Surveying
Action Text: Perform Basic Surveying Operations
Condition: In a field environment, given guided instruction and a demonstration on basic surveying operations, an Auto Level with accessories, tripod, and a student guide.
Standard: Perform surveying operations, take field notes and record elevations of all points indicated on the site map with an accuracy of .5' (6").
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A10 / ADT1 (GP) Large Group Instruction
Introduction: 0.1 (CO) Conference / Discussion
0.8 (TE) Test
0.5 (TR) Test Review
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-6
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10A10 / ADT1 (GP) Large Group Instruction
Summary: 0.1 (CO) Conference / Discussion Total: 1.5
Security Clearance: Unclassified
Lesson Title: Earthwork Principles Written Examination
Action Text: Earthwork Principles Written Examination
Condition: In a classroom, given a number 2 pencil, a test booklet, an answer sheet, and a guided block of instruction on testing procedures.
Standard: Complete the earthwork written examination in 40 minutes and achieved a minimum score of 70%.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-7
Module: B / ADT
Title: Dump Truck Operations
Purpose: The purpose of the Dump Truck Operations is to provide skill level 1 Soldiers with the skills and knowledge required to effectively perform operators maintenance, drive, dump and spread with the dump truck to assist in engineering missions.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers
Actual Equipment (AE) 19.0 PowerPoint Presentation (PP) 1.0
Total Hours (Admin & Academic) 20.0
12N10B01 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.8 (CO) Conference / Discussion
Summary: 0.1 (CO) Conference / Discussion Total: 1.0
Security Clearance: Unclassified
Lesson Title: Introduction to the M1090 Dump Truck
Action Text: Introduction to the M1090 Dump Truck
Condition: In a classroom environment, given a student guide and guided instruction on the uses, characteristics, capabilities, limitations and components of the M1090 dump truck.
Standard: Identify the uses, characteristics, capabilities, limitations, features, and major components of the M1090 dump truck. Answer all questions correctly when asked throughout the introduction.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10B02 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.2 (CD) Conference/Demonstration
0.4 (DM) Demonstration
2.6 (P1) Practical Exercise (Hands-on)
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-8
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10B02 / ADT1 (AE) Actual Equipment
0.5 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 4.0
Security Clearance: Unclassified
Lesson Title: Perform PMCS on a Dump Truck
Action Text: Perform PMCS on a Dump Truck
Condition: At a training site, given a dump truck, TM 9-2320-366-10-1, TM 9-2320-366-10-2, LO 9-2320-366-10-1, a student guide, a grease gun, petroleum, oil, and lubricants (POL), rags, an equipment records folder, and all personal protective equipment.
Standard: Perform operators PMCS on a dump truck utilizing the operators TM adhering to all Warning and Caution statements, annotate all deficiencies on a DA Form 5988-E or DA Form 2404, correct all operator level deficiencies, and turn in the completed form to your supervisor.
Perform all levels of PMCS without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil.
12N10B03 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.2 (DM) Demonstration
3.5 (P1) Practical Exercise (Hands-on)
1.0 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 5.0
Security Clearance: Unclassified
Lesson Title: Drive a Dump Truck
Action Text: Drive a Dump Truck
Condition: At a training site, given a dump truck, a hands on demonstration on driving operations, all personal protective equipment, a student guide, TM 9-2320-366-10-1, TM 9-2320-366-10-2, and an equipment records folder.
Standard: Drive the dump truck through the pre-determined driving course while obeying all posted traffic signs and signals. Stay in the proper lane, and maintain the safe driving interval
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-9 between vehicles. Perform all driving operations adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1.Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10B04 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.8 (DM) Demonstration
2.9 (P1) Practical Exercise (Hands-on)
1.0 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 5.0
Security Clearance: Unclassified
Lesson Title: Dump a Load with a Dump Truck
Action Text: Dump a Load with a Dump Truck
Condition: At a training site, given a dump truck, a loader with operator, guided instruction and demonstration on dumping operations, TM 9-2320-366-10-1, TM 9-2320-366-10-2, a student guide, an equipment records folder, and all personal protective equipment.
Standard: Check for overhead clearance, release the tailgate control lever, engage the PTO and raise the dump body until all material is emptied. Pull forward 3 to 5 feet, lower dump body and disengage the PTO. Perform all dumping operations adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1.Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10B05 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.8 (DM) Demonstration
2.9 (P1) Practical Exercise (Hands-on)
1.0 (TE) Test
0.1 (TR) Test Review
Total: 5.0
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-10
Security Clearance: Unclassified
Lesson Title: Spread a Load with a Dump Truck
Action Text: Spread a Load with a Dump Truck
Condition: At a training site, given a dump truck, a loader with operator, guided instruction and demonstration on spreading operations, TM 9-2320-366-10-1, TM 9-2320-366-10-2, a student guide, an equipment records folder, and all personal protective equipment.
Standard: Check for overhead clearance; unlock the tailgate using the tailgate control lever. Engage the PTO and raise the dump body 4 to 6 feet. Drive forward and raise the dump body while maintaining a speed of 5 MPH. Spread materials at designated spread point. Perform all spreading operations adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1.Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
Management Category: ADT Preparation Date: 02 Feb 2010
04 Oct 2011 12:59 4-11
Module: C / ADT
Title: Scoop Loader Operations
Purpose: The purpose of the Scoop Loader Operations is to provide skill level 1 Soldiers with the skills and knowledge required to perform operator's maintenance, drive, utilize the clamshell, load a haul unit and excavate to assist in engineering missions.
Remarks: Explain the Operational Environment (COE) to include lessons learned. Ensure the Soldiers
Total Hours (Admin & Academic) 20.0
12N10C01 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.8 (CO) Conference / Discussion
Summary: 0.1 (CO) Conference / Discussion Total: 1.0
Security Clearance: Unclassified
Lesson Title: Introduction to the Scoop Loader
Action Text: Introduction to the Scoop Loader
Condition: In a classroom environment, given a student guide and guided instruction on the characteristics, capabilities, limitations and major components of the scoop loader.
Standard: Identify the characteristics, capabilities, limitations, major components, and safety of the scoop loader. Answers all questions correctly when asked throughout the introduction.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10C02 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.4 (DM) Demonstration
2.8 (P1) Practical Exercise (Hands-on)
0.5 (TE) Test
0.1 (TR) Test Review
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-12
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10C02 / ADT1 (AE) Actual Equipment
Summary: 0.1 (CO) Conference / Discussion Total: 4.0
Security Clearance: Unclassified
Lesson Title: Perform PMCS on a Scoop Loader
Action Text: Perform PMCS on a Scoop Loader
Condition: At a training site, given a Scoop Loader, TM 5-3805-262-10, LO 5-3805-262-12, a student guide, a grease gun, [petroleum, oil, and lubricants (POL)], rags, an equipment records folder, and all personal protective equipment.
Standard: Perform operators PMCS on a Scoop Loader utilizing the operators TM, annotate all deficiencies on a DA Form 5988-E or DA Form 2404, correct all operator level deficiencies, turn in the completed maintenance form to your supervisor, performs all levels of PMCS adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-262-10 and LO 5-3805-262-12.Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil.
12N10C03 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.6 (DM) Demonstration
3.1 (P1) Practical Exercise (Hands-on)
1.0 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 5.0
Security Clearance: Unclassified
Lesson Title: Perform Clamshell Operations with a Scoop Loader
Action Text: Perform Clamshell Operations with a Scoop Loader
Condition: At a training site, given a scoop loader with a multi-segmented bucket, a wooden timber or pole, guided instruction and demonstration on clamshell procedures, TM 5- 3805-262-10, LO 5-3805-262-12, a student guide, a grease gun, [petroleum, oil, and lubricants (POL)], rags, an equipment records folder, and all personal protective equipment.
Standard: Using the clamshell, secure a load, move it to a pre-determined location and place the load without dropping or crushing the load. Using the clamshell, secure the load, move the load back to its original position and place the load without dropping or crushing the load.
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-13
Complete all procedures adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-262-10 and LO 5-3805-262-12.Explain the Operational Environment (OE) to include lessons learned. Ensure
12N10C04 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.6 (DM) Demonstration
3.6 (P1) Practical Exercise (Hands-on)
0.5 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 5.0
Security Clearance: Unclassified
Lesson Title: Load a Haul Unit with a Scoop Loader
Action Text: Perform Loading Operations with a Scoop Loader
Condition: At a training site, given a scoop loader, a student guide, all personal protective equipment, guided instruction and demonstration on loading operations, a haul unit, and a stockpile of material.
Standard: Position the loader at a 45 degree angle to spoil, direct haul unit driver to safe position and remain motionless until driver is positioned, raise bucket while traveling toward the haul unit, dump load from minimum height, places cushion in haul unit when loading large rocks, distributes load evenly, and load the haul unit to struck capacity within 25 minutes adhering to all Warning and Caution statements in the TM without error and with no damage to equipment, environment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-262-10 and LO 5-3805-262-12.Explain the Operational Environment (OE) to include lessons learned. Ensure
12N10C05 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.6 (DM) Demonstration
3.1 (P1) Practical Exercise (Hands-on)
1.0 (TE) Test
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-14
Total: 5.0
Security Clearance: Unclassified
Lesson Title: Excavate with a Scoop Loader
Action Text: Excavate with a Scoop Loader
Condition: At a training site, given guided instruction and demonstration on excavating procedures, a Scoop Loader, TM 5-3805-262-10, a student guide, an equipment records folder and all personal protective equipment.
Standard: Excavate a trench 50' long ± 6", 3' deep ± 6", 1 bucket width wide, stockpile material at the end of the excavation. Backfill the excavation by positioning the loader at a 45° angle on the backside of the stockpile. Move 1/3 of the stockpile at a time. Complete backfilling and match surrounding area and existing drainage, leaving a smooth surface. Complete all procedures adhering to all Warning and Caution statements in the TM without error and without damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-262-10 and LO 5-3805-262-12.Explain the Operational Environment (OE) to include lessons learned. Ensure
Management Category: ADT Preparation Date: 02 Feb 2010
04 Oct 2011 12:59 4-15
Module: D / ADT
Title: Hydraulic Excavator Operations
Purpose: The purpose of the Hydraulic Excavator Operations is to provide skill level 1 Soldiers with the skills and knowledge required to perform operator's maintenance, maneuver, perform lifting operations, replace attachments, perform ditching operations, and load a haul unit, to assist in engineering missions.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers information visit the CALL web site at HTTP://call.army.mil.
-None- (--) 4.0
Total Hours (Admin & Academic) 24.0
12N10D01 / ADT1 (PP) PowerPoint Presentation
Introduction: 0.1 (CO) Conference / Discussion
0.8 (CO) Conference / Discussion
Summary: 0.1 (CO) Conference / Discussion Total: 1.0
Security Clearance: Unclassified
Lesson Title: Introduction to the Hydraulic Excavator (HYEX)
Action Text: Introduction to the Hydraulic Excavator (HYEX)
Condition: In a classroom environment, given a student guide and guided instruction on the characteristics, capabilities, limitations, major components, controls and instruments, and hand/arm signals associated with the Hydraulic Excavator.
Standard: Identify the characteristics, capabilities, limitations, major components, controls, instruments, and hand and arm signals and safety associated with the Hydraulic Excavator. Answer all questions correctly when asked throughout the introduction.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10D02 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.6 (DM) Demonstration
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-16
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10D02 / ADT1 (AE) Actual Equipment
2.6 (P1) Practical Exercise (Hands-on)
0.5 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 4.0
Security Clearance: Unclassified
Lesson Title: Perform PMCS on a Hydraulic Excavator
Action Text: Perform PMCS on a Hydraulic Excavator
Condition: At a training site, given a HYEX, TM 5-3805-280-10, DA From 5988-E or 2404, a student guide, an equipment records folder, a grease gun, [petroleum, oil, and lubricants (POL)], rags, and all personal protective equipment.
Standard: Perform operator's PMCS on the hydraulic excavator utilizing the PMCS table in TM 5-3805-280-10. Annotate all deficiencies on DA Form 5988-E or DA 2404, correct all operator deficiencies, and give the DA Form 5988-E or DA 2404 to your supervisor. Perform all levels of PMCS adhering to all Warning and Caution statements in the TM without error and without damage to equipment, environment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-280-10. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10D03 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CD) Conference/Demonstration
0.1 (CD) Conference/Demonstration
0.4 (P1) Practical Exercise (Hands-on)
0.2 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CD) Conference/Demonstration Total: 1.0
Security Clearance: Unclassified
Lesson Title: Maneuver a Hydraulic Excavator
Action Text: Maneuver a Hydraulic Excavator
Condition: At a training site, given guided instruction and demonstration on maneuvering operations, a HYEX, TM 5-3805-280-10, a student guide, an equipment records folder, and all personal protective equipment.
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-17
Standard: Maneuver a HYEX through a pre-designated course, maintaining control of the equipment.
Perform all procedures adhering to all Warning and Caution statements in the TM without damage to equipment, environment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-280-10. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10D04 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.1 (DM) Demonstration
0.6 (P1) Practical Exercise (Hands-on)
0.5 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 1.5
Security Clearance: Unclassified
Lesson Title: Perform Hydraulic Excavator Lifting Operations
Action Text: Perform Lifting Operations with a Hydraulic Excavator
Condition: At a training site, given a HYEX, guided instruction and demonstration on lifting operations, a tag line operator, TM 5-3805-280-10, a student guide, an equipment records folder, and all personal protective equipment.
Standard: Tag line operator fastens the sling/chain to the bucket loop, follow hand signals from the tag line operator, curl the bucket and retract the arm, attach a hand line to the load and position the tag line operator away from the load, test the load and perform lifting operations adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-280-10. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil. Support personnel can be used as the tag men during the lifting operations.
12N10D05 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CD) Conference/Demonstration
0.1 (DM) Demonstration
0.4 (P1) Practical Exercise (Hands-on)
0.2 (TE) Test
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-18
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10D05 / ADT1 (AE) Actual Equipment
Summary: 0.1 (CD) Conference/Demonstration Total: 1.0
Security Clearance: Unclassified
Lesson Title: Replace Attachments on a Hydraulic Excavator
Action Text: Replace Attachments on a Hydraulic Excavator
Condition: At a training site, a HYEX, guided instruction and demonstration on replacing attachments, TM 5-3805-280-10, a student guide, an equipment records folder, attachments, and all personal protective equipment.
Standard: To remove attachment lift and rotate the safety lock pin on the bucket, place quick disconnect switch in the unlatched position, attempt bucket curl for ten seconds and no alarm sounds, place the quick disconnect switch in the latch position and attempt to curl the bucket again.
To install attachments center boom on attachment, align bucket pins, lock pins into bucket, activate quick-latch toggle switch, curl bucket until latch is seated, deactivate quick-latch switch, curl bucket to lock wedge. Perform all steps adhering to all Warning and Caution statements in the TM without error and with no damage to equipment, environment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-280-10. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10D06 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.4 (DM) Demonstration
3.8 (P1) Practical Exercise (Hands-on)
0.5 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 5.0
Security Clearance: Unclassified
Lesson Title: Load a Haul Unit with a Hydraulic Excavator
Action Text: Load a Haul Unit with a Hydraulic Excavator
Condition: At a training site, given a HYEX on top of a stockpile, guided instruction and demonstration on loading operations, TM 5-3805-280-10, a student guide, a haul unit with operator, an equipment records folder, and all personal protective equipment.
Standard: Position the HYEX on top of a stockpile, direct haul unit driver to safe position and remain motionless until driver is positioned, raise bucket while swinging toward haul unit without
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-19 swinging over cab, dump load from minimum height, place cushion in haul unit when loading large rocks, load from center front to center rear, distributes load evenly, and load the haul unit to struck capacity, and maneuvers HYEX to bottom of stockpile within 25 minutes adhering to all Warning and Caution statements in the TM without error and with no damage to equipment, environment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-280-10. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil. See appendix C for detail drawing of HYEX platform used for loading a haul unit.
12N10D07 / ADT1 (AE) Actual Equipment
Introduction: 0.1 (CO) Conference / Discussion
0.5 (DM) Demonstration
5.2 (P1) Practical Exercise (Hands-on)
0.5 (TE) Test
0.1 (TR) Test Review
Summary: 0.1 (CO) Conference / Discussion Total: 6.5
Security Clearance: Unclassified
Lesson Title: Perform Ditching Operations with the Hydraulic Excavator
Action Text: Perform Ditching Operations with a Hydraulic Excavator
Condition: At a training site, given a HYEX, guided instruction and demonstration on ditching operations, a student guide, an equipment records folder, and all personal protective equipment.
Standard: Perform ditching operations using the engine mode high power/economy/auto idle and with the hydraulic mode selector on "DIG", construct a ditch 3' deep ± 6", with a uniform depth for a distance of 20', and placed spoil at least 3' away from the ditch. Perform all steps adhering to all Warning and Caution statements in the TM without error and with no damage to equipment, environment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 5-3805-280-10. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10D08 / ADT1 (--) -None-
Introduction: 0.0 (CO) Conference / Discussion Summary: 0.0 (CO) Conference / Discussion
Total: 0.0
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 4-20
Security Clearance: Unclassified
Lesson Title: Out Processing
Action Text: NONE
Condition: NONE
Standard: NONE
Remarks: NONE
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 5-1
Mandatory Training Module
None.
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 6-1
Examination Module
Module: A / ADT
Title: TAMMS/Earthwork Principles
Purpose: The purpose of the Earthwork Principles Operations is to provide skill level 1 Soldiers with the skills and knowledge required to understand Safety, Environmental Stewardship, Utilize the Army Maintenance Management System, Interpret Basic Construction Prints, Identify Basic Soils Properties, Interpret Basic Grade Stakes and perform Basic Surveying Operations to assist in engineering missions.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil.
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10A05 / ADT1 (GP) Large Group Instruction
0.8 (TE) Test Total: 0.8
Security Clearance for Exam/Test: Unclassified
Lesson Title: The Army's Maintenance Management System Written Examination
Action Text: The Army's Maintenance Management System Written Examination
Condition: In a classroom, given a number 2 pencil, a test booklet, an answer sheet, TM 5-3805-261-10, TM 5-2410-237-10 and a guided block of instruction on testing procedures.
Standard: Complete the Army's Maintenance Management System written examination in 40 minutes and achieved a minimum score of 70%.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
12N10A09 / ADT1 (PP) PowerPoint Presentation
1.0 (TE) Test Total: 1.0
Security Clearance for Exam/Test: Unclassified
Lesson Title: Introduction to Basic Surveying
Action Text: Perform Basic Surveying Operations
Condition: In a field environment, given guided instruction and a demonstration on basic surveying operations, an Auto Level with accessories, tripod, and a student guide.
Standard: Perform surveying operations, take field notes and record elevations of all points indicated on the site map with an accuracy of .5' (6").
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
Management Category: ADT Preparation Date: 02 Feb 2010
04 Oct 2011 12:59 6-2
12N10A10 / ADT1 (GP) Large Group Instruction
0.8 (TE) Test Total: 0.8
Security Clearance for Exam/Test: Unclassified
Lesson Title: Earthwork Principles Written Examination
Action Text: Earthwork Principles Written Examination
Condition: In a classroom, given a number 2 pencil, a test booklet, an answer sheet, and a guided block of instruction on testing procedures.
Standard: Complete the earthwork written examination in 40 minutes and achieved a minimum score of 70%.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are
Management Category: ADT Preparation Date: 02 Feb 2010
04 Oct 2011 12:59 6-3
Module: B / ADT
Title: Dump Truck Operations
Purpose: The purpose of the Dump Truck Operations is to provide skill level 1 Soldiers with the skills and knowledge required to effectively perform operators maintenance, drive, dump and spread with the dump truck to assist in engineering missions.
Remarks: Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of how it will affect them during their future assignments. For the most current information, visit the CALL web site at HTTP://call.army.mil.
Lesson Id / Version Technique of Delivery Hours Method of Instruction 12N10B02 / ADT1 (AE) Actual Equipment
0.5 (TE) Test Total: 0.5
Security Clearance for Exam/Test: Unclassified
Lesson Title: Perform PMCS on a Dump Truck
Action Text: Perform PMCS on a Dump Truck
Condition: At a training site, given a dump truck, TM 9-2320-366-10-1, TM 9-2320-366-10-2, LO 9-2320-366-10-1, a student guide, a grease gun, petroleum, oil, and lubricants (POL), rags, an equipment records folder, and all personal protective equipment.
Standard: Perform operators PMCS on a dump truck utilizing the operators TM adhering to all Warning and Caution statements, annotate all deficiencies on a DA Form 5988-E or DA Form 2404, correct all operator level deficiencies, and turn in the completed form to your supervisor.
Perform all levels of PMCS without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1. Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10B03 / ADT1 (AE) Actual Equipment
1.0 (TE) Test Total: 1.0
Security Clearance for Exam/Test: Unclassified
Lesson Title: Drive a Dump Truck
Action Text: Drive a Dump Truck
Condition: At a training site, given a dump truck, a hands on demonstration on driving operations, all personal protective equipment, a student guide, TM 9-2320-366-10-1, TM 9-2320-366-10-2, and an equipment records folder.
Standard: Drive the dump truck through the pre-determined driving course while obeying all posted traffic signs and signals. Stay in the proper lane, and maintain the safe driving interval
Management Category: ADT Preparation Date: 02 Feb 2010 Status: Commandant Approved Optimum Class Size: 12
04 Oct 2011 12:59 6-4 between vehicles. Perform all driving operations adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1.Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10B04 / ADT1 (AE) Actual Equipment
1.0 (TE) Test Total: 1.0
Security Clearance for Exam/Test: Unclassified
Lesson Title: Dump a Load with a Dump Truck
Action Text: Dump a Load with a Dump Truck
Condition: At a training site, given a dump truck, a loader with operator, guided instruction and demonstration on dumping operations, TM 9-2320-366-10-1, TM 9-2320-366-10-2, a student guide, an equipment records folder, and all personal protective equipment.
Standard: Check for overhead clearance, release the tailgate control lever, engage the PTO and raise the dump body until all material is emptied. Pull forward 3 to 5 feet, lower dump body and disengage the PTO. Perform all dumping operations adhering to all Warning and Caution statements in the TM without error and with no damage to equipment or injury to personnel.
Remarks: Adhere to all Warning and Caution statements in the TM 9-2320-366-10-1.Explain the Operational Environment (OE) to include lessons learned. Ensure the Soldiers are aware of
12N10B05 / ADT1 (AE) Actual Equipment
1.0 (TE) Test Total: 1.0
Security Clearance for Exam/Test: Unclassified
Lesson Title: Spread a Load with a Dump Truck
Action Text: Spread a Load with a Dump Truck
Condition: At a training site, given a dump truck, a loader with operator, guided instruction…