UNIFIED FACILITIES GUIDE SPECIFICATIONS

View the file

Other files for this federal contract opportunity

Other files attached to Floor Resurfacing Project, newest first.
File Type Posted
J189_Floor.pdf PDF
B489_AGE-FLOOR.pdf PDF
SOW_Floor_Resurfacing_SOW_V2.pdf PDF
RFIs_19-Q-5012_H5_Floor.pdf PDF
B195-_Flooring.pdf PDF
Hangar_5_1st_Floor_Plan.pdf PDF
FloorPlansHangarFloor.pdf PDF
W912NR19Q5012.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 09 67 23.15 Page 1

USACE / NAVFAC / AFCEC / NASA UFGS-09 67 23.15 (August 2010)

Change 1 - 08/17

Preparing Activity: NAVFAC Superseding UFGS-09 67 23.15 (February 2010)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated July 2018

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 67 23.15

FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

08/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALITY ASSURANCE

1.3.1 Test Reports

1.3.1.1 Joint Sealant

1.3.1.2 Thin Film Flooring System

1.3.1.3 Primer

1.3.1.4 Urethane Topcoat

1.3.1.5 Daily Inspection Report

1.3.2 Certificates

1.3.2.1 Work Plan

1.3.2.2 Flooring System Applicator Qualifications

1.3.2.3 Joint Sealant

1.3.2.4 Thin Film Flooring System

1.3.2.5 Warranty

1.3.3 Product Data

1.3.3.1 Joint Sealant

1.3.3.2 Thin Film Flooring System

1.3.3.3 Water-Based Alkaline Degreaser

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 COATING HAZARDS

1.6 JOB SITE REFERENCES

1.7 PATCH TEST DEMONSTRATION

PART 2 PRODUCTS

2.1 JOINT SEALANT

2.2 THIN FILM FLOORING SYSTEM

2.2.1 Primer Coat

2.2.2 Urethane Topcoat

2.3 WHITE ALUMINUM OXIDE NON-SKID GRIT

2.4 PREAPPROVED MATERIALS

1112293155N

FOUO

SECTION 09 67 23.15 Page 2

PART 3 EXECUTION

3.1 COATING SAMPLE COLLECTION

3.2 TILE AND TILE ADHESIVE REMOVAL

3.3 JOINT MATERIAL REMOVAL, RE-SAW CUTTING, CRACK CHASING

3.4 DEGREASING

3.5 COATING SYSTEM REMOVAL

3.6 SURFACE PREPARATION

3.7 JOINT TREATMENT

3.7.1 Install Backer Rod

3.7.2 Sealant Application

3.8 PRE-APPLICATION TESTING FOR CONTAMINATION

3.9 COATING APPLICATION

3.9.1 Primer Application

3.9.2 Non-Skid Grit Broadcast

3.9.3 Application of Topcoats

3.9.3.1 First Topcoat

3.9.3.2 Second Topcoat

3.9.3.3 Walkway Stripe and Grounding Rod Markings

3.10 CURING

3.11 FIELD TESTS AND INSPECTION

3.11.1 Coating Inspector

3.11.2 Inspection

3.11.2.1 Daily Inspection Report

3.11.2.2 Inspection Logbook

3.11.2.3 Inspection Equipment

3.11.3 Adhesion Testing

3.12 FINAL CLEANUP

-- End of Section Table of Contents --

SECTION 09 67 23.15 Page 3

PART 1 GENERAL

1.1 REFERENCES

NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.

References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C679 (2003; E 2009; R 2009) Tack-Free Time of

Elastomeric Sealants

ASTM C884/C884M (2016) Standard Test Method for Thermal Compatibility between Concrete and Epoxy-Resin Overlay

ASTM D1308 (2013) Effect of Household Chemicals on

Clear and Pigmented Organic Finishes

ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness

ASTM D2370 (1998; R 2010) Tensile Properties of

Organic Coatings

ASTM D2621 (1987; R 2016) Standard Test Method for Infrared Identification of Vehicle Solids from Solvent-Reducible Paints

ASTM D2697 (2003; R 2014) Volume Nonvolatile Matter in Clear or Pigmented Coatings

ASTM D3335 (1985a; R 2014) Low Concentrations of Lead, Cadmium, and Cobalt in Paint by Atomic Absorption Spectroscopy

ASTM D3718 (1985a; R 2015) Low Concentrations of

SECTION 09 67 23.15 Page 4

Chromium in Paint by Atomic Absorption Spectroscopy

ASTM D3925 (2002; R 2015) Sampling Liquid Paints and

Related Pigmented Coatings

ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D4541 (2017) Standard Test Method for Pull-Off

Strength of Coatings Using Portable Adhesion Testers

ASTM D6237 (2009; R 2015) Painting Inspectors

(Concrete and Masonry Substrates)

ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics

ASTM E11 (2016) Standard Specification for Woven

Wire Test Sieve Cloth and Test Sieves

ASTM F1869 (2016) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)

ICRI 03732 (1997) Selecting and Specifying Concrete

Surface Preparation for Sealers, Coatings, and Polymer Overlays

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC-TU 2/NACE 6G197 (1997) Design, Installation, and

Maintenance of Coating Systems for Concrete Used in Secondary Containment

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-595 (Rev C; Notice 1) Colors Used in

Government Procurement

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1000 Air Contaminants

29 CFR 1910.134 Respiratory Protection

29 CFR 1926.59 Hazard Communication

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are [for Contractor Quality Control

SECTION 09 67 23.15 Page 5 approval.][for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-04 Samples

Joint Sealant; G[, [ ]]

Thin Film Flooring System; G[, [ ]]

White Aluminum Oxide Non-Skid Grit; G[, [ ]]

SD-06 Test Reports

Thin Film Flooring System; G[, [ ]]

Primer; G[, [ ]]

Urethane Topcoat; G[, [ ]]

White Aluminum Oxide Non-Skid Grit; G[, [ ]]

Patch Test Demonstration; G[, [ ]]

Daily Inspection Report; G[, [ ]]

Adhesion Testing; G[, [ ]]

SD-07 Certificates

Work Plan; G[, [ ]]

Flooring System Applicator Qualifications; G[, [ ]]

Thin Film Flooring System; G[, [ ]]

Warranty; G[, [ ]]

SD-08 Manufacturer's Instructions

Joint Sealant; G[, [ ]]

Thin Film Flooring System; G[, [ ]]

Water-Based Alkaline Degreaser; G[, [ ]]

SD-11 Closeout Submittals

Inspection Logbook; G[, [ ]]

1.3 QUALITY ASSURANCE

1.3.1 Test Reports

SECTION 09 67 23.15 Page 6

1.3.1.1 Joint Sealant

Submit test results that confirm sealant complies with the requirements of Table Ia. Samples must have been tested within the last three years.

1.3.1.2 Thin Film Flooring System

Submit test results that confirm the thin film flooring system complies with the requirements of Table Ib. Samples must have been tested within the last three years.

1.3.1.3 Primer

Submit test results that confirm the primer complies with the requirements of Table Ic. Samples must have been tested within the last three years.

1.3.1.4 Urethane Topcoat

Submit test results that confirm the urethane topcoat complies with the requirements of Table Id. Samples must have been tested within the last three years.

1.3.1.5 Daily Inspection Report

Submit one copy of the daily inspection report to the Contracting Officer within 24 hours of the date recorded.

1.3.2 Certificates

1.3.2.1 Work Plan

Submit schedule to complete work within approximately twelve (12) consecutive days. Submit a written plan describing in detail all phases of coating operations. Address work sequencing, surface preparation, flooring system application, recoat and cure time projections, as well as how each step will be controlled, tested, and evaluated. Address safety measures, work scheduling around weather, and record keeping. Assign one supervisor to the job who is to remain at the site throughout all phases of work and who is to act as the contractor's primary point of contact. Identify this person in the submitted schedule.

1.3.2.2 Flooring System Applicator Qualifications

Minimum requirements for the installation contractor are as follows:

Completed three or more jobs within the past two years applying the specified materials to concrete surfaces in which the total area exceeds 18,587 square meters 200,000 square feet. Submit documentation listing location of work, point of contact at job site, total square footage of applied materials, listing of both materials and equipment used, and validation from coating manufacturer documenting quality of materials purchased per job for work totaling 18,587 square meters 200,000 square feet within the past two years. In addition to the above requirements, be certified by the material manufacturer(s) to install the submitted coatings and sealant. Submit copy of certificates.

1.3.2.3 Joint Sealant

Submit literature documenting the past performance of the sealant's use in automotive and/or aircraft maintenance shops. Minimum requirements are

SECTION 09 67 23.15 Page 7 two or more maintenance shops with joint work totaling 3,048 linear meters 10,000 linear feetwhere the sealant has performed for two years with less than 1 percent combined sealant failures and defects. List location of shops, total linear feet of sealant applied per shop, shop point of contact, date sealant was applied, and the name of the installed sealant material.

1.3.2.4 Thin Film Flooring System

Submit literature documenting the past performance of the coating system's use in aircraft maintenance shops and over floors with high rates of Moisture Vapor Emission (MVE). Minimum requirements are two or more aircraft maintenance shops totaling 3,160 square meters 34,000 square feet where the coating system has performed for two years with less than 0.05 percent combined premature coating failures, material defects and surface discoloration; no more than 0.03 percent discoloration from aviation chemicals, tire plasticizers, and UV exposure. Provide a minimum of two additional case histories where successful installation occurred on floor slabs with no less than 197.0 micrograms moisture per second, square meter 3.5 pounds moisture per 24 hours, 1000 square feet. List location of shops, total coated area per shop, shop point of contact, date coating system was applied, successful installation to concrete with high MVE, and the names of the installed coating materials.

1.3.2.5 Warranty

Warrantee materials and workmanship for a minimum period of one year following coating and sealant application. The following terms and conditions form a part of the warranty: If the applied coating system develops either blisters (chemical), checks, softening, or lifting within one year following application, rework each area at contractor's expense.

The following conditions are excluded from the warranty: A) concrete cracking, flooring system mirrors cracks in concrete; B) cosmetic imperfections due to scratching and gouging; C) application to metallic concrete finishes ; and D) application to concrete with a rate of Moisture Vapor Emission (MVE)greater than 197.0 micrograms moisture per second, square meter 3.5 pounds moisture per 24 hours, 1000 square feet. If the coating system's adhesion is in question, perform one adhesion test per 9.3 square meters 100 square feet as described in the Article entitled "ADHESION TESTING." To satisfy the warranty, each adhesion test shall produce cohesive failures, concrete removal over 95 percent of each pull-off coupon, and/or adhesion no less than 2.8 MPa 400 psi. Require two additional adhesion tests to confirm results for each area failing to meet adhesion requirements. Within the warranty period, remove to sound material and rework all areas unable to meet adhesion requirements. There shall be zero percent sealant failures within one year. Within the warranty period, remove and rework all sealant material with chemically attacked surfaces and/or lifting from joint walls. Topcoat cracking over sealant is excluded from warranty.

1.3.3 Product Data

1.3.3.1 Joint Sealant

Submit manufacturer's printed instructions to include detailed application procedures, minimum and maximum application temperatures, and curing procedures. In accordance with 29 CFR 1926.59, include Safety Data Sheets (SDS) for the sealant to be used at the job site.

1.3.3.2 Thin Film Flooring System

SECTION 09 67 23.15 Page 8

Submit manufacturer's printed instructions to include detailed mixing, minimum and maximum application temperatures, acceptable atmospheric and/or interior climatic conditions, application procedures, curing procedures, and procedures for maintenance cleaning of flooring system. Provide explicit instructions detailing surface preparation, recoat windows and remedial actions in case recoat windows are missed, and, if applicable, solvent-wiping between coats with acceptable types and grades of solvents.

In accordance with 29 CFR 1926.59, include SDSs for the coatings to be used at the job site.

1.3.3.3 Water-Based Alkaline Degreaser

Submit manufacturer's printed instructions to include detailed mixing, rate of dilution, application procedures, and rinsing procedures. In accordance with 29 CFR 1926.59, include SDSs for the water-based alkaline degreaser to be used at this job site.

1.4 DELIVERY, STORAGE, AND HANDLING

Store coatings and sealant in spaces with temperatures from 5 degrees C 40 degrees F to 24 degrees C 75 degrees F. Inspect materials on site for damage prior to use. Return to manufacturer packaged materials in dented, rusty, or leaking containers. Conduct testing by manufacture of returned materials with an expired shelf life and if compliant, reissue a shelf life extension.

1.5 COATING HAZARDS

Ensure that employees are trained in all aspects of the safety plan.

Follow the coating manufacturer's written safety precautions throughout mixing, application, and curing of coatings. Comply with respiratory protection requirements in 29 CFR 1910.134 and safe levels of airborne contaminants in 29 CFR 1910.1000.

1.6 JOB SITE REFERENCES

Make available to the Contracting Officer at least one copy each of ASTM D4541, ASTM D6237, SSPC-TU 2/NACE 6G197, and ICRI 03732, including replica standards ICRI 03732 CSP 1 through CSP 9, at the job site.

1.7 PATCH TEST DEMONSTRATION

Prior to the submitted flooring system's approval, apply the complete coating system to a 3 meter by 3 meter 10 foot by 10 foot square section of concrete as prepared in accordance with Part 3 "EXECUTION." Within this area, perform three adhesion tests as described in the Article entitled "ADHESION TESTING." If adhesion testing produces cohesive failures within the concrete, no less than 1 mm 40 mils concrete removed over 95 percent of each pull-off coupon, and/or adhesion more than 2.75 MPa400 psi, patch test adhesion is acceptable. If concrete surface preparation was insufficient, apply an additional coating system patch to properly prepared concrete

SECTION 09 67 23.15 Page 9 followed by the above adhesion testing. If adhesion results are unacceptable for both the topcoats and the primer, submit a new coating system manufactured by a different coating vendor. Apply a patch of the new coating system and subject patch to the above requirements for adhesion prior to approval. If customer dislikes non-skid grit application, adjustments to the specifications can be made. Grit coarser than #60 aluminum oxide is not recommended.

PART 2 PRODUCTS

2.1 JOINT SEALANT

Formulate the joint sealant to exhibit the properties as listed in Table Ia.

2.2 THIN FILM FLOORING SYSTEM

A three-coat industrial flooring system consisting of primer and two urethane topcoats. Apply the coating system at a Dry Film Thickness (DFT) ranging from 325 to 500 microns 13 to 20 mils and contain a broadcast of aluminum oxide non-skid grit. Formulate the complete flooring system to exhibit the properties as listed in Table Ib. Additional requirements for primer coat and urethane topcoat are listed in the following sub-paragraphs.

2.2.1 Primer Coat

In addition to the requirements of the thin film flooring system, formulate the primer coat to exhibit the properties as listed in Table Ic.

2.2.2 Urethane Topcoat

In addition to the requirements of the thin film flooring system, formulate the urethane top coat to exhibit the properties as listed in Table Id.

2.3 WHITE ALUMINUM OXIDE NON-SKID GRIT

Size #60, dust free (washed and dry), minimum 99 percent pure, having the following sieve analysis when tested using a 1000 gram 2.2 pound sample

(ASTM E11):

Sieve No. 40 100 percent passing

Sieve No. 50 15-30 percent retained

Sieve No. 60 70-85 percent retained

Sieve No. 70 0-15 percent retained

SECTION 09 67 23.15 Page 10

2.4 PREAPPROVED MATERIALS

Table II contains a listing of vendors with "preapproved materials."

Other materials may be submitted by must meet the requirements described in this specification, and approved by the government.

PART 3 EXECUTION

3.1 COATING SAMPLE COLLECTION

The Contracting Officer and QC Manager shall witness all material sampling.

Notify the Contracting Officer a minimum of three days in advance of sampling. Obtain liquid samples of each component of primer and topcoat by random selection from sealed containers and in accordance with ASTM D3925.

Samples may be either individual cans of liquid material or 1.0 liter 1.0 quart quantities of properly mixed, extracted, and sealed liquid material.

Identify samples by designated name, specification number, batch number, project contract number, sample date, intended use, and quantity involved.

When the applied coating system has met the requirements defined in the Article entitled "ADHESION TESTING," return coating to the installation contractor for proper disposal.

3.2 TILE AND TILE ADHESIVE REMOVAL

N/A

3.3 JOINT MATERIAL REMOVAL, RE-SAW CUTTING, CRACK CHASING

Remove 100 percent of the existing material in all joints including material bonded to joint walls and base. Rigid material may require the use of saw cutting equipment to remove. Joints may be widened up to 3.2 mm 1/8 inch when re-saw cutting. Chase concrete cracks identified for repair and open to a minimum depth of 12.5 mm 1/2 inch below crack surface with smooth vertical walls.

3.4 DEGREASING

On both coated and uncoated concrete, degrease entire floor by scrubbing using a solution of hot potable water, 49 degrees C 120 degrees F to 77 degrees C 170 degrees F, and a concentrated water-based alkaline degreaser. Perform two complete degreasing cycles on the entire floor surface. Allow solution to soak into surfaces prior to scrubbing and remove using hot potable water under a minimum of

27.6 MPa 4,000 psi. Rinsing is complete when the rinse

water appears clear. If the industrial detergent is not biodegradable, collect all rinse water and dispose as hazardous waste.

Squeegees and shop vacuums may be used to collect pooling rinse water. Fans may be used to aid drying of floor surfaces.

3.5 [COATING SYSTEM REMOVAL

Remove 100 percent of the existing coating system employing one or more of the following techniques: shot blasting, chipping, scraping, sanding, scarification, high pressure water blasting, and various hand tools. The use of impact tools such as scabblers may be used to remove unsound epoxy

SECTION 09 67 23.15 Page 11 mortar flooring systems. In general, a coating system cannot be completely removed by shot blasting and, to attain 100 percent coating removal, and requires a combination of the above techniques.

]3.6 SURFACE PREPARATION

Shot blast entire floor to produce a level of coarseness equal to ICRI 03732 CSP 3. Overlap each pass of shot blasting by 6.25 mm 1/4 inches to

12.5 mm

1/2 inches. Add new shot to shot blasting equipment prior to blasting.

Prepare surfaces inaccessible to shot blasting, base of perimeter walls and under secured equipment, using diamond disk grinding and/or light scarification to produce a level of coarseness equal to ICRI 03732 CSP 2 and/or ICRI 03732 CSP 4, respectively. Resulting surfaces shall appear clean and contain the appropriate level of surface coarseness. If the resulting level of cleanliness cannot be determined, place numerous drops of water on surfaces that appear contaminated. If the water drops soak into concrete, the surfaces are free of hydrocarbon contamination (oils, grease, skydrol). If the water drops bead up and do not flatten out, surfaces require additional degreasing as detailed in the Article entitled "DEGREASING." Shot blasting coarse concrete and/or broom finished concrete can produce a level of coarseness equal to ICRI 03732CSP 5: employ a best effort attempt to minimize over shot blasting of coarse concrete. If coarse concrete is encountered, shot blasting to a level of coarseness equal to ICRI 03732 CSP 5 is acceptable: however, extremely coarse concrete can require resurfacing prior to the flooring system's installation.

Sweep, vacuum, and run a high powered magnet over all surfaces to be coated, including joints.

3.7 JOINT TREATMENT

Use the "Conventional Sealed Joint" as detailed in Figure 1 of SSPC-TU 2/NACE 6G197 to seal joints. Employ measures to reduce contamination from equipment and foot traffic. Limit floor access to essential contractor personnel. Confirm joint surfaces are sufficiently clean.

3.7.1 Install Backer Rod

Install a continuous length of round, closed-cell polyethylene backer rod into each joint using a backer rod tool. For 12.5 mm 1/2 inch, 9.4 mm 3/8 inch, and 6.25 mm 1/4 inch wide joints, place backer rod to a depth of 9.4 mm 3/8 inch (depth equals the distance from the concrete's surface to the highest point on the backer rod). For joints greater than or equal to

18.75 mm 3/4 inch width, place backer to a depth of 15.6 mm 5/8 inch below the concrete's surface. Fit backer rod tight between joint walls (30 percent compression). Remove and reinstall all backer rod that is installed using either the incorrect size (loose fit) or at the incorrect depth. Following backer rod installation, apply painter's tape to surfaces adjacent joints to protect from sealant.

3.7.2 Sealant Application

Apply sealant directly into joints using a bulk-caulking gun. At room temperature, the resulting sealant application shall exhibit a concave recess between 3.2 mm 1/8 inch to 1.6 mm 1/16 inch below the concrete's surface. Remove and reapply cured sealant remaining either flush or greater. Following sealant application, remove painter's tape and sealant

SECTION 09 67 23.15 Page 12 drips on concrete surfaces. Cure sealant a minimum of 24 hours, prior to the application of coatings.

3.8 PRE-APPLICATION TESTING FOR CONTAMINATION

Spot check surfaces for oil/grease contamination using the water break test. At a rate of 5 tests per 95 square meters 1000 square feet, place one to two drops of water onto surfaces and observe for beading. Test all other surfaces that show visible signs of potential contamination. Apply additional degreasing techniques to surfaces displaying water beading in accordance with the Article entitled "DEGREASING."

3.9 COATING APPLICATION

Vacuum flooring space one additional time prior to coating application.

3.9.1 Primer Application

Apply primer to flooring space at 175 microns 7.0 mils to 375 microns 15.0 mils Dry Film Thickness (DFT). If the prepared concrete resembles an ICRI 03732 CSP 3 surface, apply the primer at a minimum of 175 microns 7.0 mils DFT. If the prepared concrete resembles an ICRI 03732 CSP 5 surface, apply the primer at a maximum of 375 microns 15.0 mils DFT. The previously applied sealant may be lightly coated.

3.9.2 Non-Skid Grit Broadcast

Broadcast non-skid grit at a rate of 680 grams 1.5 pounds per 9.3 square meters 100 square feet into the second urethane top coat and backroll. Map floor into 55.8 square meter 600 square foot sections where 4080 grams 9.0 pounds of non-skid grit is pre-weighed, placed into clean buckets and used in its entirety per marked 55.8 square meter 600 square foot section.

3.9.3 Application of Topcoats

Apply two coats of urethane topcoat to the epoxy primer and broadcast white aluminum oxide non-skid grit directly into the second urethane topcoat.

3.9.3.1 First Topcoat

Apply a full coat of the urethane topcoat at a spreading rate from 62.5 to 80 microns 2.5 to 3.2 mils Dry Film Thickness (DFT). Stripe coat perimeter edges and around equipment footings. Monitor and record a minimum of one Wet Film Thickness (WFT) reading per 55.8 square meter 600 square feet of floor surface. Sealant is to be lightly coated.

3.9.3.2 Second Topcoat

Apply a second coat of the urethane topcoat at a spreading rate of 62.5 to 80 microns 2.5 to 3.2 mils DFT. Stripe coat perimeter edges and around equipment footings. Monitor and record a minimum of one WFT reading per

55.8 square meters 600 square feet of floor surface prior to broadcasting non-skid grit. When the correct WFT has been applied per 55.8 square meters 600 square feet of area, immediately and evenly broadcast non-skid grit directly into the second topcoat of urethane and backroll in two directions. Test the adhesion of the thin film flooring system in accordance with the Article entitled "ADHESION TESTING."

3.9.3.3 Walkway Stripe and Grounding Rod Markings

SECTION 09 67 23.15 Page 13

Place the walkway stripe and grounding rod markings according to Government drawings, if applicable. When the second topcoat is within its recoat window, apply a walkway stripe of the red/orange urethane topcoat at 75 microns 3.0 mils DFT, completely hiding the top coat, in one coat. If insufficient hiding occurs, apply one additional coat of the walkway stripe. Lightly broadcast non-skid grit into the wet walkway stripe. Use solvent resistant tape to protect the floor coating against stripe coat bleed. A thin clear coat of either epoxy or urethane may be required to prevent stripe coat bleed prior to the full application of the colored stripe coat. Apply grounding rod markings using similar procedures, urethane top coat, and colors and size according to Government drawings.

3.10 CURING

Cure installed materials to display performance equal to manufacturer's product literature. Remove and reapply improperly cured material.

3.11 FIELD TESTS AND INSPECTION

3.11.1 Coating Inspector

Consider the Coating Inspector as a QC Specialist, who works for the QC Manager, and be qualified in accordance with Section 01 45 00.00 10 01 45 00.00 20 01 45 00.00 40 QUALITY CONTROL. The Coating Inspector will be present during all field tests, surface preparation, flooring application, initial cure of the flooring system, and during all flooring repair work. The Coating Inspector will provide all tools/equipment necessary to perform field tests and inspection. The Coating Inspector will be responsible for field tests and specified level of inspection.

3.11.2 Inspection

Document weather conditions, job site occurrences, and report conditions and occurrences potentially detrimental to the flooring system. The listed inspection requirements are in addition to the QC inspection and reporting requirements defined in Section 01 45 00.00 10 01 45 00.00 20 01 45 00.00 40 QUALITY CONTROL. Prepare a project reference sheet outlining all requirements, tests, test methods, and evaluation criteria, and hold regular meetings with contractor personnel, including shot blasting operators and applicators, to review requirements/evaluation criteria for upcoming work prior to execution. At the start of coating operations and every 1.0 hour following until daily work is complete, record air temperature, substrate temperature, and relative humidity.

Following the application of each coat, inspect surfaces for improperly cured material, blisters, inadequate and/or excessive coating thickness, and other defects. Document each inspection, test, non-compliant area, and location of each non-compliant area. List method of evaluation, evaluation criteria, areas requiring rework, and all other pertinent observations.

SECTION 09 67 23.15 Page 20

3.11.2.1 Daily Inspection Report

Submit to the Contracting Officer one copy of the daily inspection report completed each day when performing work under this Section. Use Appendix X1 "Inspection Checklist" of ASTM D6237 to monitor daily activity and to assist in preparing the daily inspection report. Note each non-compliant issue and each issue identified for rework in accordance with the QC documentation procedures of Section 01 45 00.00 10 01 45 00.00 20 01 45 00.00 40 QUALITY CONTROL. Use of forms containing entry blocks for all required data is encouraged. The data shall be legible and presented in a professional format. Submit report within 24 hours of the report date.

3.11.2.2 Inspection Logbook

Record all daily activity related to this section in the Inspection Logbook, including the daily inspection reports, as well as all other pertinent observations and information. Use hard or spiral bound book with consecutively numbered pages. Prior to final payment, submit original Inspection Logbook to the Contracting Officer upon completion of project.

3.11.2.3 Inspection Equipment

Use equipment in good condition, operational within its design range, and calibrated as required by the specified standard for use with each device.

3.11.3 Adhesion Testing

Perform a minimum of three adhesion tests in accordance with ASTM D4541 to the thin film flooring system. Select three random flooring locations spaced a minimum of 6 meters 20 feet between each location. Prior to attaching pull-off coupons, lightly sand flooring surface and attach pull-off coupons containing a grit-blasted anchor profile. Adhere directly to the center of each sanded surface a 18.75 mm 3/4 inch diameter pull-off coupon. When pull-off coupon adhesive has sufficiently cured, score circumference of each pull-off coupon to concrete substrate. Test adhesion and evaluate results. If testing produces cohesive failures within the concrete, no less than 1 mm 40 milsconcrete removed over 95 percent of each pull-off coupon, and/or adhesion more than 2.75 MPa 400 psi coating system's adhesion is acceptable. If the above requirements are not satisfied, then perform one adhesion test per 9.3 square meters 100 square feet using the above procedures. Perform two additional tests per non-compliant area to confirm results. Remove to sound material and rework all areas unable to meet adhesion requirements. Repair each adhesion test using a combination of primer, sand-filled epoxy mortar (for deep cohesive failures, if applicable), and two urethane topcoats. Make repairs flush with adjacent coatings and display an equivalent appearance.

3.12 FINAL CLEANUP

Following completion of the work, remove debris, equipment,and materials from the site. Remove temporary connections to Government or contractor furnished water and electrical services. Restore existing facilities in and around the work areas to their original condition.

SECTION 09 67 23.15 Page 21

TABLE I - MATERIALS REQUIREMENTS

TABLE Ia

Test Minimum Requirement (maximum where indicated)

Sealant System (two-pack: self-leveling) Polysulfide (Manganese Cure; MnO2) or Urethane

Percent Volume Solids 100 percent

Chemical Resistance to JP-8 plus 100 Fuel at 21 degrees C (ASTM D1308) (see note 1)

48 hours immersion: 2.0 percent (max) weight increase, 5.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Motor Oils at 21 degrees C (ASTM D1308) (see note 1)

48 hours immersion: 2.0 percent (max) weight increase, 5.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Skydrols at 21 degrees C (ASTM D1308) (see note 1)

48 hours immersion: 2.0 percent (max) weight increase, 5.0 percent (max) volume increase, 2.0 percent (max) weight loss

Hardness (ASTM D2240:Shore A) 20

Tensile Strength (ASTM D412) (or ASTM D638) 1.0 MPa

Percent Elongation (ASTM D412) (or

ASTM D638)

500 percent

Tack Free at 18.3 degrees C (ASTM C679) 12 hours maximum

Adhesion to Concrete 0.96 MPa

Adhesion to Urethane Topcoats (paintable sealant)

0.96 MPa

NOTES: (1) Immerse and test a minimum of three 50 mm by 12.5 mm by 12.5 mm sections of cured sealant.

SECTION 09 67 23.15 Page 22

TABLE I - MATERIALS REQUIREMENTS

TABLE Ia

Test Minimum Requirement (maximum where indicated)

Sealant System (two-pack: self-leveling) Polysulfide (Manganese Cure; MnO2) or Urethane

Percent Volume Solids 100 percent

Chemical Resistance to JP-8 plus 100 Fuel at 70 degrees F (ASTM D1308) (see note 1)

48 hours immersion: 2.0 percent (max) weight increase, 5.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Motor Oils at 70 degrees F (ASTM D1308) (see note 1)

48 hours immersion: 2.0 percent (max) weight increase, 5.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Skydrols at 70 degrees F (ASTM D1308) (see note 1)

48 hours immersion: 2.0 percent (max) weight increase, 5.0 percent (max) volume increase, 2.0 percent (max) weight loss

Hardness (ASTM D2240:Shore A) 20

Tensile Strength (ASTM D412) (or ASTM D638) 150 psi

Percent Elongation (ASTM D412) (or

ASTM D638)

500 percent

Tack Free at 65 degrees F(ASTM C679) 12 hours maximum

Adhesion to Concrete 140 psi Adhesion to Urethane Topcoats (paintable sealant)

140 psi

NOTES: (1) Immerse and test a minimum of three 2 inch by 1/2 inch by 1/2 inch section of cured sealant.

SECTION 09 67 23.15 Page 23

TABLE Ib

Test Minimum Requirement (maximum where indicated)

Tensile Strength (ASTM D2370) 4.83 MPa

Percent Elongation (ASTM D2370) 5.0 percent

Adhesion to Concrete ( ASTM D4541) (see note 1)

2.75 MPa or 100 percent failure in

concrete

Thermal Compatibility between Concrete (

ASTM C884/C884M)

60 degrees C

Heat Resistance, continuous exposure "pass"

Chemical Resistance to JP-8 plus 100 Fuel at 21 degrees C (ASTM D1308)(see note 2)

48 hours immersion: 2.0 percent (max) weight increase, 2.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Motor Oils at 21 degrees C (ASTM D1308)(see note 2)

48 hours immersion: 2.0 percent (max) weight increase, 2.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Skydrols at 21 degrees C(ASTM D1308)(see note 2)

48 hours immersion: 2.0 percent (max) weight increase, 2.0 percent (max) volume increase, 2.0 percent (max) weight loss

Lead (ASTM D3335) 0.06 percent (max)

Cadmium (ASTM D3335) 0.06 percent (max)

Chromium (ASTM D3718) 0.00 percent

NOTES:

(1) When tested for adhesion, coating system shall display 2.75 MPa adhesion and/or remove no less than 1.0 mm of concrete over 95 percent of each pull-off coupon throughout service.

SECTION 09 67 23.15 Page 24 indicated)

(2) Immediately following immersion, in addition to the listed requirements, coating system shall be evaluated for blisters, checks, discoloration, softening, and lifting. Coating system shall be visually free of blisters, checks, discoloration, and display both substrate and intercoat adhesion no less than 2.4 MPa ( ASTM D4541).

SECTION 09 67 23.15 Page 25 indicated)

Tensile Strength (ASTM D2370) 700 psi

Percent Elongation (ASTM D2370) 5.0 percent

Adhesion to Concrete ( ASTM D4541) (see note 1)

400 psi or 100 percent failure in concrete

Thermal Compatibility between Concrete (

ASTM C884/C884M)

140 degrees F

Heat Resistance, continuous exposure "pass"

Chemical Resistance to JP-8 plus 100 Fuel at 70 degrees F (ASTM D1308)(see note 2)

48 hours immersion: 2.0 percent (max) weight increase, 2.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Motor Oils at 70 degrees F (ASTM D1308)(see note 2)

48 hours immersion: 2.0 percent (max) weight increase, 2.0 percent (max) volume increase, 2.0 percent (max) weight loss

Chemical Resistance to Skydrols at 70 degrees F (ASTM D1308)(see note 2)

48 hours immersion: 2.0 percent (max) weight increase, 2.0 percent (max) volume increase, 2.0 percent (max) weight loss

Lead (ASTM D3335) 0.06 percent (max)

Cadmium (ASTM D3335) 0.06 percent (max)

Chromium (ASTM D3718) 0.00 percent

NOTES:

(1) When tested for adhesion, coating system shall display 400 psi adhesion and/or remove no less than 40 mils of concrete over 95 percent of each pull-off coupon throughout service.

SECTION 09 67 23.15 Page 26 indicated)

(2) Immediately following immersion, in addition to the listed requirements, coating system shall be evaluated for blisters, checks, discoloration, softening, and lifting. Coating system shall be visually free of blisters, checks, discoloration, and display both substrate and intercoat adhesion no less than 350 psi ( ASTM D4541).

SECTION 09 67 23.15 Page 27

TABLE Ic indicated)

Resin System (ASTM D2621) Epoxy (two-pack)

Percent Volume Solids (ASTM D2697) 85 percent

Color 17925 (white) or 17875 (ultra-light gray)

Hydrolytic Stability (see note 1) No effect: 30 days immersion in Sodium Hydroxide solution with pH no less than 13.5

Moisture Insensitivity Throughout Service ( ASTM F1869, ASTM D4541) (see note 2)

No effect: Insensitive to moisture vapor emission at rates no more than 197.0 micrograms moisture/second, square meter

Adhesion to Concrete Throughout Service ( ASTM D4541) (see note 3)

2.75 MPa or 100 percent failure in

concrete

NOTES:

(1) Immediately following immersion, primer shall be evaluated for blisters, checks, discoloration, softening, and substrate lifting. Primer shall appear free of blisters, checks and moderate discoloration, and display wet adhesion no less than

2.4 MPa (ASTM D4541).

(2) During and following application, primer shall remain unaffected by Moisture Vapor Emission (MVE) at rates no more than 197.0 micrograms moisture per second, square meter: primer shall meet the requirements of Note (3). Signs of moisture sensitivity include blisters, softening, lifting, and discoloration (whitening).

(3) When tested for in-situ adhesion, primer shall display 2.75 MPa adhesion and/or remove no less than 1.0 mm of concrete over 95 percent off each pull-off coupon.

SECTION 09 67 23.15 Page 28

TABLE Ic indicated)

Resin System (ASTM D2621) Epoxy (two-pack)

Percent Volume Solids (ASTM D2697) 85 percent

Color 17925 (white) or 17875 (ultra-light gray)

Hydrolytic Stability (see note 1) No effect: 30 days immersion in Sodium Hydroxide solution with pH no less than 13.5

Moisture Insensitivity Throughout Service ( ASTM F1869, ASTM D4541) (see note 2)

No effect: Insensitive to moisture vapor emission at rates no more than 3.5 pounds moisture/24 hrs, 1000 square feet

Adhesion to Concrete Throughout Service ( ASTM D4541) (see note 3)

400 psi or 100 percent failure in concrete

NOTES:

(1) Immediately following immersion, primer shall be evaluated for blisters, checks, discoloration, softening, and substrate lifting. Primer shall appear free of blisters, checks and moderate discoloration, and display wet adhesion no less than 350 psi (ASTM D4541).

(2) During and following application, primer shall remain unaffected by Moisture Vapor Emission (MVE) at rates no more than 3.5 pounds moisture per 24 hours, 1000 square feet: primer shall meet the requirements of Note (3). Signs of moisture sensitivity include blisters, softening, lifting, and discoloration (whitening).

(3) When tested for in-situ adhesion, primer shall display 400 psi adhesion and/or remove no less than 40 mils of concrete over 95 percent off each pull-off coupon.

SECTION 09 67 23.15 Page 29

TABLE Id indicated)

Resin System (ASTM D2621) Aliphatic Urethane (two-pack)

Percent Volume Solids (ASTM D2697) 51 percent

Topcoat Color (FED-STD-595) 17925 (white) or 17875 (ultra-light gray)

Walkway Stripe Color: Red/Orange, semi-gloss (FED-STD-595)

22197 (red/orange)

Application Thickness per Coat 62.5 microns to 80 microns Dry Film Thickness(DFT)

Hiding Power: Red/Orange Complete hiding of white coatings at 80 microns DFT(one coat)

Sunlight Resistance Non-yellowing

Heat Resistance, continuous exposure 60 degrees C

Heat Resistance, intermittent exposure 93.3 degrees C

Chemical Resistance to JP-8 plus 100 Fuel at 21 degrees C (ASTM D1308) (see note 1)

48 hours immersion: 1.0 percent (max) weight increase, 1.0 percent (max) volume increase, 1.0 percent (max) weight loss

Chemical Resistance to Motor Oils at 21 degrees C (ASTM D1308)(see note 1)

48 hours immersion: 1.0 percent (max) weight increase, 1.0 percent (max) volume increase, 1.0 percent (max) weight loss

Chemical Resistance to Skydrols at 21 degrees C (ASTM D1308)(see note 1)

48 hours immersion: 1.0 percent (max) weight increase, 1.0 percent (max) volume increase, 1.0 percent (max) weight loss

NOTES:

(1) Immediately following immersion, in addition to the listed requirements, urethane topcoat shall be evaluated for blisters, checks, discoloration, softening, and lifting. Urethane topcoat shall be visually free of blisters, checks, and discoloration, and display adhesion no less than 2.4 MPa ( ASTM D4541).

SECTION 09 67 23.15 Page 30

TABLE Id indicated)

Resin System (ASTM D2621) Aliphatic Urethane (two-pack)

Percent Volume Solids (ASTM D2697) 51 percent

Topcoat Color (FED-STD-595) 17925 (white) or 17875 (ultra-light gray)

Walkway Stripe Color: Red/Orange, semi-gloss (FED-STD-595)

22197 (red/orange)

Application Thickness per Coat 2.5 mils to 3.2 Dry Film Thickness(DFT)

Hiding Power: Red/Orange Complete hiding of white coatings at 3.2 mils mils DFT(one coat)

Sunlight Resistance Non-yellowing

Heat Resistance, continuous exposure 140 degrees F

Heat Resistance, intermittent exposure 200 degrees F

Chemical Resistance to JP-8 plus 100 Fuel at 70 degrees F (ASTM D1308) (see note 1)

48 hours immersion: 1.0 percent (max) weight increase, 1.0 percent (max) volume increase, 1.0 percent (max) weight loss

Chemical Resistance to Motor Oils at 70 degrees F (ASTM D1308)(see note 1)

48 hours immersion: 1.0 percent (max) weight increase, 1.0 percent (max) volume increase, 1.0 percent (max) weight loss

Chemical Resistance to Skydrols at 70 degrees F (ASTM D1308)(see note 1)

48 hours immersion: 1.0 percent (max) weight increase, 1.0 percent (max) volume increase, 1.0 percent (max) weight loss

(1) Immediately following immersion, in addition to the listed requirements, urethane topcoat shall be evaluated for blisters, checks, discoloration, softening, and lifting. Urethane topcoat shall be visually free of blisters, checks, and discoloration, and display adhesion no less than 350 psi ( ASTM D4541).

SECTION 09 67 23.15 Page 31

TABLE II

PREAPPROVED MATERIALS*

Vendors Materials

Polyspec (281) 397-0033 Primer: 300EX

Topcoat: Tuffrez 235

Sealant: T-2235SL

Tennant (800) 553-8033 Primer: Eco-MPE (see note 1)

Topcoat: Eco-HPS100

Sealant: N/A (see note 2)

Stonhard (856) 779-7500 Primer: Standard Primer

Topcoat: Stonseal GS6

Sealant: Vulkem 245

Crawford Labs (800) 356-7625 Primer: Florock 4700

Topcoat: Florock Super CRU

Sealant: N/A (see note 2)

General Polymers (800) 543-7694 Primer: #3578, Universal Primer

Topcoat: #4618, Polyurethane Enamel

Sealant: Cor-Seal PS

NOTES:

(*) Other products may meet specification requirements, Up to specification's date of issue, preapproved materials met specification requirements. It is the user's responsibility to confirm preapproved material formulations have not changed and specification requirements will be met.

(1) ECO-CRE primer is to be used on floors with heavy Skydrol use.

(2) Polyspec T-2235SL sealant may be used.

SECTION 09 67 23.15 Page 32

-- End of Section --

************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-09 67 23.15 (August 2010)