SOW_Floor_Resurfacing_SOW_V2.pdf
PDF 160 KB Posted
- Attached to
- Floor Resurfacing Project Federal contract opportunity
- Solicitation number
- W912NR-19-Q-5012
About this file
Amended Statement of Work 30May2019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs_19-Q-5012_H5_Floor.pdf | ||
| B195-_Flooring.pdf | ||
| Hangar_5_1st_Floor_Plan.pdf | ||
| J189_Floor.pdf | ||
| B489_AGE-FLOOR.pdf | ||
| W912NR19Q5012.pdf | ||
| UFGSSpecification.pdf | ||
| FloorPlansHangarFloor.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
H5 HANGAR FLOOR PAINTING
AT
LOUISIANA AIR
NATIONAL GUARD
Prepared by:
Civil Engineer Squadron
13 November 2018
Revised 30 May 2019
TABLE OF CONTENTS
I. Scope
A. General Information Pg 3 B. Location Pg 3 C. Description of Work Pg 3 D. Submittals Pg 4 E. Scheduling Pg 5 F. Environmental Considerations Pg 5 G. Clean Up Pg 6
II. General Administrative
A. Work Hours Pg 6 B. Occupancy Pg 7 C. Government Property Pg 7
D. Antiterrorism Pg 8 E. CMRA Pg 8 F. Construction Close-Out Pg 8
III. Attachments
A. Drawings Pg 9 B. Specifications Pg 9 C. Submittals Required Pg 9
IV. Addenda/Change Orders
A. Description of Change Pg 9
I. SCOPE
A. General:
1. The work consists of removing current floor coating and repainting the Hangar 5 floor and Building 195’s bay floors as outlined in Section I (C) below and attached drawings, as well as removing current floor coating and repainting AGE (Bldg. 489) and Hush House 1 (Bldg. 189). Changes and/or modifications must have prior approval from the Contracting Officer. The contractor is responsible for any damages caused to government facilities. The Contractor is responsible for ensuring proper documentation and vehicle passes for personnel are received in time to avoid any delay in project start of performance. Proper documentation includes personnel attainment of contractor badges and appropriate advance notification to an Air Force Civil Engineer squadron representative for scheduling of escort support. Client will move equipment from areas of work.
2. Period of performance: 45 days from receipt of Notice to Proceed
B. Location:
1. All work on this project is to be performed at NAS JRB for LA Air National Guard, New Orleans, LA 70143.
C. Description of Work:
1. The Contractor shall provide all professional services, tools, labor, equipment, materials and travel required to paint an aircraft hangar floor. Contractor shall provide manufacturer, model number and specs on materials prior to installation for approval.
The Contractor shall provide all equipment necessary to complete service to include paint spray machines, water tanks, cleaning equipment, and any relevant equipment.
The below work shall be done in accordance with all relevant codes, regulations and manufacturer requirements.
Division 01 General Conditions:
• The Prime Contractor and all subcontractors shall be responsible for access to NASJRB, by means of DBIDS or short term extended pass through Navy Security. When on the installation the Contractor Superintendent shall check in with LA ANG Security Forces at Building 186 (Alert Facility) before every work day. All contractors shall provide photo identification and receive Contractor’s badge. Contractor Superintendent must then report to Production Control located at Building 473 (Civil Engineering).
o Contractors must visibly wear their badge at all times during working hours. Contractors cannot work without it. Badge must be placed above waist over working garments. If badge is misplaced or lost, it must be report it to Security Force at Building 186 (Alert Facility).
Division 02 Existing Conditions:
• Contractor to make an assessment of all existing conditions.
• Remove existing floor coating system, approximately 26,000SF, contractor to verify at site visit.
Division 09 Finishes:
• Specification Section 09 067 23.15 Fuel Resistive Resinous Flooring, 3- Coat System (see attachment) addresses all requirements unless stated additionally in this section of the Statement of Work.
• Existing coating system will be fully removed by grinding and any other necessary means outlined in attached specification.
• Exposed concrete will be shot blasted in accordance with Section 3.6 of the specification and then degreased in accordance with Section 3.4.
• Joints will be removed, sawed and repaired as necessary, and cleaned. New backer rod and sealant will be installed after floor coating system has been installed. Sealant must meet Fed Spec SS-S-200E: Pre-approved sealants – Sikaflex-68 TF, Pacific Polymers Elasto-thane 200, Polycoat Products Poly- Caulk JF, W.R. Meadows Poly-Jet 200-E.
• Main floor to be light gray, refer to attached drawing for all other colors and markings to be placed on the floor.
• The floor of hangar 5 is to include a 16X24 foot image of the Louisiana State Flag centered.
• Top coat of floor coating system must have a minimum coefficient of friction of .65 as measured on the James Test without grit added.
• #60 grit as described in specification will be BROADCAST at a rate of 1.75lb per 100SF into the second coat, see section 3.9.2.
• Two 100SF 3-coat test patches will be done, one with grit broadcast and one without for government testing. Patches may be kept as part of final system provided it matches into final finish seamlessly.
• Quality assurance is to be provided by coating system manufacturer representative or manufacturer recommendation.
• All testing specified in Specification Section 09 067 23.15 will be followed.
Option #1:
• Deletion of #60 grit broadcast, if determined by government after testing on 100SF 3-coat test patches.
D. Submittals
1. In general, for each facet of construction, the Contractor shall submit 1 electronic copy (PDF) of material samples, related calculations and a numbered fillable PDF AF3000 to the Contracting Officer (KO) for approval a minimum of 7 calendar days prior to procurement and placement of that particular material and construction respectively. Simple material submittals will be reviewed by the technical representative and returned to the KO within 5 government working days. Submittals requiring multiple level reviews such as environmental, design, calculations, etc. will be reviewed and returned to the KO within 7 government working days. Upon final approval the Contractor shall commence with the procurement and construction activity accordingly.
2. Physical sample submittals will be expressly mentioned by item below:
• N/A
3. All material and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the Contractor using the AF Form 3000, or automated equivalent. Any material used without or before Government approval is subject to removal, at no cost, if directed by the KO.
4. Submittals are required for all related materials and equipment that the Contractor intends to use for this project. The Contractor shall prepare and submit a materials and equipment listing of any items procured locally for project requirements. Specific items on the listing shall be selected for inspection. This does not include manufacturer recommended equipment and materials. Utilization of any parts and materials for this project will be at the Contractor’s risk if there is no prior submittal approved for such items and materials. The LA Air National Guard obtains the right to stop the Contractor and request the removal of any equipment and/or material utilized without prior approval by the LA ANG technical representatives.
5. Project specific Submittals will be detailed out in Section III (C).
E. Scheduling
1. Contractor will submit a Plan/Schedule that includes minimal milestones detailing various stages of construction and phasing, lead time of new materials and installation to the Government for review prior to performing the associated work. Weekly updates shall be provided to the KO.
2. No work shall commence until the Government has approved the schedule at the Pre-Construction Meeting or at a pre-determined time.
F. Environmental Considerations
1. Protection of Human Health and the Environment: It is intended that land resources within the project boundaries be preserved or restored to a condition that appears natural and is protective of human health and the environment. To meet that goal the contractor is responsible for conforming to the following procedures listed.
2. In the event the Contractor brings any hazardous materials onto LA Air National Guard, the Contractor shall notify the KO of the approximate quantities of the materials to be used on the project and will supply a material Safety Data Sheet (SDS) of those materials in English.
3. The Contractor shall be responsible for maintaining the work site to prevent the spread of contamination, provide for the safety of all individuals in the vicinity of the work site areas, and prevent the release of any contaminants to the environment. Any tanks or drum containers used by the Contractor on LA Air National Guard property to store hazardous materials, including petroleum products, will be stored within secondary containment structures capable of holding a volume of 110% of the largest container.
4. All mud, dirt, debris, foreign objects, trash, or spills (including from Sub- Contractors and suppliers) on a street or parking lot, used as access to the work site or staging area shall be cleaned off the same day or as soon as practicable or requested by the KO.
5. The Contractor shall immediately report to the KO to discuss any issues or incidents which may indicate potential imminent risk to contracted, federal, or local personnel, the public at large, or the environment. Following the notification, the Contractor shall be available to the KO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies related to working on LA Air National Guard and be prepared to respond to a release caused by the Contractor’s personnel.
6. To report a release or spill, contact the KO as soon as possible with the following:
• Your name, organization and telephone number
• Name/address of the party responsible for the incident
• Date and time of the incident
• Location of incident
• Sources and cause of the release or spill
• Type and quantity of material released or spilled
• Danger or threat posed by release or spill
• Number and type of injuries (if any)
7. The Contractor shall comply with all applicable U.S. Air Force, Federal, and State environmental statutes and regulations.
G. Clean Up
1. Do not dispose of rubbish and debris into any waste receptacle on NAS JRB New
Orleans (LA ANG).
2. Do not allow accumulation of rubbish or debris in parking lots or on planted materials or grass.
3. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer.
4. Comply with federal, state, and local hauling and disposal regulations. The Contractor shall haul waste from the LA ANG site to an appropriate disposal site. All debris will be removed from the site (Contractor is responsible for dump locations and fees).
5. Contractor is responsible for daily clean-up.
6. Contractor is responsible for repair cost incurred as a result of all damage to any facilities on LA ANG.
7. The use of burning at the project site for the disposal of refuse and debris will not be permitted.
8. The job site will be returned the same general condition that it was in prior to any construction done to the job site. This includes, but in not limited to re-sodding disturbed grass, removal of extra fill, removal of demolished building materials, etc.
9. The Contractor shall be responsible for all clean-up before substantial completion.
II. GENERAL ADMINISTRATIVE
A. Work Hours
1. Standard work hours for this project are the base normal work hours of 7:00 AM to
4:30 PM, local time, Tuesday through Friday. Work must stop on official Government holidays and work curtailment days, unless specifically approved in advance.
2. Recognized Federal Holidays:
• New Year’s Day
• Birthday of Martin Luther King, Jr.
• President’s Day
• Memorial Day
• Independence Day
• Labor Day
• Columbus Day
• Veterans Day
• Thanksgiving Day
• Christmas Day
3. Alternate work hours, such as Monday through Friday or weekends, must be submitted in writing 4 work days before the date desired.
4. To work special hours or days such as to continue exterior painting until dark, request verbal approval from the Contracting Officer at least 4 hours in advance.
5. The Government reserves the right to refuse these requests. However, they will usually be approved unless they negatively affect the base or the using activity. For example, the using activity may have difficulty paying overtime for escorts in controlled areas. In addition, work requiring inspector presence such as building erection may not be possible outside normal hours on short notice. Digging outside of normal hours will normally not be approved.
B. Occupancy
1. The Government will continue to operate in the work site/building unless specified otherwise. Contractor will have access to the area and shall coordinate with the Building Manager and the Contracting Officer Representative a schedule to allow the continued flow of work for both the Government and Contractor.
2. Laydown area or storage space will be determined at the Pre-Construction Meeting prior to start of construction.
C. Government Property
1. Use of government equipment and tools for the construction project is not allowed.
Contractor is to provide all necessary equipment and tools for completing the project.
2. Government furnished equipment or furniture to be installed by Contractor will be described in the Scope Section C and identified by item below:
• Not Applicable
3. Government provided utilities for use by the Contractor are limited to electricity to run small power tools on site and water and sewage for incidental clean-up.
D. Anti-terrorism
1. All Contractor employees, including Sub-Contractor employees, requiring access to
Government Installations, Facilities and Controlled Access areas, shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable, Certificates of completion for each affected Contractor employee and Sub-Contractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jCO.jten.mil
E. CMRA
1. The Office of the Assistant Secretary of the Army (Manpower &Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including Sub-Contractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address:
https://armycmra.dmdc.osd.mil/Login.aspx
F. Construction Close-Out
1. Upon Final Inspection, Government will provide the Contractor the Final
Acceptance Letter.
2. Upon completion, the Contractor shall provide the Contracting Officer with two (2) http://jko.jten.mil/ https://armycmra.dmdc.osd.mil/Login.aspx bound sets containing maintenance, repair and operating instructions and parts lists for each piece of installed equipment and one (1) digital set (PDF) on a CD. Additionally, one (1) digital and one (1) hard copy of As-Built drawings must be provide as well.
3. In addition to the specific guarantees required by the specifications for certain portions of the work to be performed under this Contract, the Contractor shall furnish a written warranty for all of the work to be performed under this Contract, against defects in materials or workmanship for a minimum period of three (3) years from the date of final acceptance of the completed work by the Government. All work including workmanship, material, and equipment (other than Government furnished equipment) shall be warranted for the full period of standard manufacturer’s warranty, but in no case shall be warranted for a period of less than three (3) years upon notice from the Contracting Officer of any failure during this warranty period. The part or parts shall be replaced promptly with new parts by and at the expense of the Contractor.
Whenever the manufacturer of a piece of equipment supplied by the Contractor customarily provides a warranty covering the equipment, the Contractor shall promptly turn over such to the Contracting Officer.
4. In addition to the general warranty required by the contract, the O&M manuals shall include any specific warranties required by other sections of the TECHNICAL SPECIFICATIONS and other warranties normally provided with the particular piece of equipment or system. Extended warranties normally provided by manufacturers that are beyond the warranty of construction shall be specifically noted. The O&M manuals shall also include a specific warranty section itemizing all standard and extended warranty items. The warranty list shall contain the information indicated below.
Warranties will not begin until the Government accepts the facility. Copy of warranty shall be included in the manual.
5. Further warranty information, reference: Contract Clause FAR 52.246-12, “Inspection of Construction” and FAR 52.246-21, “Warranty of Construction”.
III. Attachments
A. Drawings
1. Hangar 5 Floor
2. Building 195 Bay Floors
B. Specifications
1. Specification Section 09 67 23.15
C. Submittals Required
1. Site specific Safety Plan
2. Site specific QC Plan
3. AF Form 66 – provided by Government, will outline further submittal requirements
4. See Specification 09 67 23.15 Section 1.2
IV. Addenda / Change Orders
A. Description of Change
1. Not Applicable
| 2019-05-30T08:17:09-0500 | |
| COOK.JENNIFER.LEONE.1025440460 |
File details come from the government source that posted it.