Solicitation Amendment W912MM25QA0220001 SF 30.pdf

PDF 3 MB Posted

Attached to
BG Dean Mann armory supply cages Federal contract opportunity
Solicitation number
W912MM25QA022
Issued by
Department of the Army South Dakota Army National Guard

About this file

This is a contract modification document (Standard Form 30) amending solicitation W912MM25QA022 for the South Dakota Army National Guard (SDARNG), effective August 5, 2025. The modification addresses questions from a site visit and updates specifications for supply room caging at the BG Dean Mann Readiness Center in Sioux Falls, SD.

The contract requires providing materials for 18 storage cages (increased from 17) across three supply rooms, with specifications including 10-gauge wire mesh with tower gray powder coat finish, hasp locks for each cage, and various gate configurations (14 single 4ft swing gates and 4 double 8ft swing gates). Key modifications include adding specific gate widths, requiring hasp locks on all cages, and adding one additional cage to Supply Room 133. The contractor must provide two pricing models: supplies only and supplies with installation. All materials must be on-site prior to project commencement, with no government-provided storage available. The completion date has been modified to no later than December 1, 2025. Installation considerations include working around ventilation systems on certain cages and restrictions on drilling into value walls. The contract includes detailed specifications for cage dimensions across the three supply rooms and requires coordination with the government point of contact.

View the file

Other files for this federal contract opportunity

Other files attached to BG Dean Mann armory supply cages, newest first.
File Type Posted
08. Schematics_BD Dean Mann Supply Caging_Sioux Falls_20250320.pdf PDF
Solicitation - W912MM25QA022 -Amendment.pdf PDF
Solicitation - W912MM25QA022.pdf PDF
08. Schematics_BD Dean Mann Supply Caging_Sioux Falls_20250320.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Supplies or Services and Prices/Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO CHANGED

BY

Description

Supply Room 128 Caging

9 total Cages

1 Cage - W 12ft, L 6ft 8 inches, H 10ft 1 Cage - W 12ft, L 6ft 11.25 inches, H 10ft 1 Cage - W 12ft, L 16ft, H 10ft 6 Cages - W 12ft, L 8ft, H 10ft 8 single swing gates 1 double swing gate Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

Supply Room 128 Caging

9 total Cages

1 Cage - W 12ft, L 6ft 8 inches, H 10ft 1 Cage - W 12ft, L 6ft 11.25 inches, H 10ft 1 Cage - W 12ft, L 16ft, H 10ft 6 Cages - W 12ft, L 8ft, H 10ft 8 4ft single swing gates 1 8ft double swing gate Each cage will need a hasp lock Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

INFORMATION FROM TO CHANGED

BY

Description

Supply Room 128 Caging and installation

9 total Cages

1 Cage - W 12ft, L 6ft 8 inches, H 10ft 1 Cage - W 12ft, L 6ft 11.25 inches, H 10ft 1 Cage - W 12ft, L 16ft, H 10ft 6 Cages - W 12ft, L 8ft, H 10ft 8 single swing gates 1 double swing gate Please see Schematics to verify dimensions

All caging will be 10 gage with a

Supply Room 128 Caging and installation

9 total Cages

1 Cage - W 12ft, L 6ft 8 inches, H 10ft 1 Cage - W 12ft, L 6ft 11.25 inches, H 10ft 1 Cage - W 12ft, L 16ft, H 10ft 6 Cages - W 12ft, L 8ft, H 10ft 8 4ft single swing gates 1 8ft double swing gate Each cage will need a hasp lock Please see Schematics to verify dimensions

All caging will be 10 gage with a

W912MM25QA0220001

tower gray powder finish

DA3953: W91XEH-5057-0500

tower gray powder finish

DA3953: W91XEH-5057-0500

INFORMATION FROM TO CHANGED

BY

Description

Supply Room 133 Caging

5 total Cages

1 Cage - W 16ft, L 8ft, H 10ft 1 Cage - W 16ft, L 26ft 11.25 inches , H 10ft 3 Cages - W 16ft, L 12ft, H 10ft 4 single swing gates 1 double swing gate Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

Supply Room 133 Caging

6 total Cages

1 Cage - W 16ft, L 8ft, H 10ft 1 Cage - W 16ft, L 26ft 11.25 inches , H 10ft 1 Cage - W 20ft 7 7/8inch, L 4ft, H 10ft 3 Cages - W 16ft, L 12ft, H 10ft 4 4ft single swing gates 2 8ft double swing gate Each cage will need a hasp lock Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

INFORMATION FROM TO CHANGED

BY

Description

Supply Room 133 Caging and installation

5 total Cages

1 Cage - W 16ft, L 8ft, H 10ft 1 Cage - W 16ft, L 26ft 11.25 inches , H 10ft 3 Cages - W 16ft, L 12ft, H 10ft 4 single swing gates 1 double swing gate Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

Supply Room 133 Caging and installation

6 total Cages

1 Cage - W 16ft, L 8ft, H 10ft 1 Cage - W 16ft, L 26ft 11.25 inches , H 10ft 1 Cage - W 20ft 7 7/8inch, L 4ft, H 10ft 3 Cages - W 16ft, L 12ft, H 10ft 4 4ft single swing gates 2 8ft double swing gate Each cage will need a hasp lock Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

INFORMATION FROM TO CHANGED

BY

Description

Supply Room 301 Caging

3 total Cages

1 Cage - W 16ft, L 20ft, H 10ft 1 Cages - W 16ft, L 12ft, H 10ft 1 Cages - W 8ft, L 12ft, H 10ft 2 single swing gates 1 double swing gate Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

Supply Room 301 Caging

3 total Cages

1 Cage - W 16ft, L 20ft, H 10ft 1 Cages - W 16ft, L 12ft, H 10ft 1 Cages - W 8ft, L 12ft, H 10ft 2 4ft single swing gates 1 8ft double swing gate Each cage will need a hasp lock Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

INFORMATION FROM TO CHANGED

BY

Description

Supply Room 301 Caging and installation

3 total Cages

1 Cage - W 16ft, L 20ft, H 10ft 1 Cages - W 16ft, L 12ft, H 10ft 1 Cages - W 8ft, L 12ft, H 10ft 2 single swing gates 1 double swing gate Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

Supply Room 301 Caging and installation

3 total Cages

1 Cage - W 16ft, L 20ft, H 10ft 1 Cages - W 16ft, L 12ft, H 10ft 1 Cages - W 8ft, L 12ft, H 10ft 2 4ft single swing gates 1 8ft double swing gate Each cage will need a hasp lock Please see Schematics to verify dimensions

All caging will be 10 gage with a tower gray powder finish

DA3953: W91XEH-5057-0500

List of Contract Documents, Exhibits, or Attachments

Miscellaneous text in this section has been modified to:

1.0 General. The SDARNG has a requirement for BG Dean Mann Supply Caging to support three Unit's being housed in the Readiness Center.

1.1 Period of Performance/Delivery Location TBD, BG Dean Mann Readiness Center, 4417 N Bahnson Ave, Sioux Falls, SD 57104

2.0 Scope. The Contractor shall provide all equipment delivery in support of the South Dakota Army National Guard

(SDARNG).

2.1 Two pricing models will need to be included: one with supplies only and one with supplies and installation.

3.0 Supply Description. Provide materials for 18 storage cages. Includes 14 single swing gates and four double swing gates. Each storage cage shall have a lid installed. All posts shall be plated and anchored to concrete. All cages must be 10 gage wire mesh with a tower gray powder coat finish. The Government POC will ensure advance coordination is made with the vendor. Please see schematics for dimensions of each cage.

4.0 Requirements. Provide all materials to install seventeen storage cages amongst three different Supply Rooms at BG Dean Mann Readiness Center. Pending funding there is potential for installation services to be included.

5.0 Site Visit: A site visit will be held on 7/30/2025 at 1400 (2pm) Central time. If you will be attending this please ensure you send notification by 7/29/2025 to tyler.j.pringle4.mil@army.mil

7/30/2025 Site Visit Questions

Will each cage need locks?

Each cage will need a hasp lock

Will the caging be impacted by the ventilation?

Yes, there is ventilation systems on the wall of cages 5,6, and 13. These cages will have to go around the system.

Is there a dock?

No, there is no dock and no forklift to unload with onsite.

What is the width of the cage doors?

All single doors will be 4ft and double doors will be 8ft.

Do all materials need to be onsite prior to starting?

Yes, all materials must be onsite prior to beginning the project.

Is there a place to store the materials?

No, there is no government provided weather proof place to store materials. Vendor can I provide their own onsite storage.

Is there an order of preference for completion of cages?

There is no order of preference. However, it is requested to do one side of a supply room at a time to ensure equipment can be moved out of the way.

Are there any areas we cannot connect the caging to?

Yes, value walls cannot be drilled into.

The number of cages has increased from 17 to 18. Please see updated schematics for this addition.

Completion date has been modified. This must be completed NLT 1 Dec 2025

IDCode: J
Page: 1
Pages: 6
AmendNo: 0001
EffDate: 05 AUG 2025
ReqNo:
ProjNo:
IssCode: W912MM
AdmCode:
IssuedBy: W7N0 USPFO ACTIVITY SD ARNG

2823 WEST MAIN STREET, RAPID CITY SD 57702-8170

RAPID CITY, SD 57702-8170

UNITED STATES

TYLER PRINGLE, EMAIL: TYLER.J.PRINGLE4.MIL@ARMY.MIL TELEPHONE: 605-737-6904

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912MM25QA022
SolDate: 18 JUL 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: TO ADDRESS QUESTIONS FROM THE SITE VISIT
ContNameTitle:
CoNameTitle: DOUGLAS HARDING
ContDate:
CODate: 05 AUG 2025