08. Schematics_BD Dean Mann Supply Caging_Sioux Falls_20250320.pdf
PDF 674 KB Posted
- Attached to
- BG Dean Mann armory supply cages Federal contract opportunity
- Solicitation number
- W912MM25QA022
About this file
The provided image is a detailed floor plan schematic for the Supply Room Caging at the Dean Mann Readiness Center, prepared by the South Dakota Department of the Military's Construction & Facility Management Office. The floor plan depicts a comprehensive layout of 17 storage cages, including 14 single-swing gate and 3 double-swing gate configurations, each specified to be 10 feet tall. The schematic provides precise dimensional measurements for each cage and associated spaces, including unit supply areas, vaults, and supply offices, with the overall floor plan covering an extensive area across multiple interconnected sections. The document is dated 12 DEC 2024 and bears the sheet number G-101, indicating it is a preliminary or design-stage architectural drawing for the proposed supply caging infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912MM25QA0220001 SF 30.pdf | ||
| 08. Schematics_BD Dean Mann Supply Caging_Sioux Falls_20250320.pdf | ||
| Solicitation - W912MM25QA022 -Amendment.pdf | ||
| Solicitation - W912MM25QA022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
SUPPLY
UNIT
SUPPLY
VAULT
D
7.
D
1.
D
3.
SUPPLY
OFFIC
E
FE
C
D132.1
VAULT
SUPPLY
OFFIC
E
D130.1
D
8.
UNIT
SUPPLY
VAULT
SUPPLY
OFFIC
E
D
0.
D303.1
D
1.
46'-5 1/4" 46'-7 5/16" 36'-0 15/32"
'-8
14'-11 1/4" 6'-4" 25'-4 1/32" 15'-1 5/32" 6'-4 1/32" 13'-10 9/16"
3 3
1 1
1 1
1 1
1 1 1 1
2 2 2
2 2 2 2
1 1
1 1
8' -0
8'
-0
8' -0
8'
-0
6' -8
12'-0"
12'-0"
12'-0"
'-0
8'
-0
8' -0
6'
-1
1/ 4"
1 1
1 1
8' -0
'-0
'-0
16'-0"
'-0
'-1
1/ 4"
'-7
/8
4'-0"
Clot hin g, Offic e
Sup pli es
Etc.
16'-0"
'-0
'-0
'-0
8'-0"
SHEET No:
DATE:
SUBMITTAL:
FL
O
O R
PL
AN
SU
PP
LY
R
O O
M C
AG
IN
G
DE
AN
M
AN
N
R
EA
DI
N
ES
S
CE
N
TE
R
CF
M
O
-C
AG
IN
G
XX%
12 DEC 2024
G-101
SO
U
TH
D
AK
O
TA
D
EP
AR
TM
EN
T O
F
TH
E M
IL
IT
AR
Y
SD
AR
N G
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DEPARTM
ENT
OF
TH
EM
ILITARY
S T A
T E
O F
S O
U T
H
D A
K
O
TA
Cage 1
Cage 2
Cage 4
Cage 5
Cage 6
Cage 7
Cage 8
Cage 9
Cage 10
Cage 11
Cage 12
Cage 3
Cage 13
Cage 14
Cage 15
Cage 16
Cage 17
All cages will be 10FT tall
All cages will be 10FT tall
All cages will be 10FT tall
16'-0"
| Sheets and Views |
| Caging |
File details come from the government source that posted it. Updated .