08. Schematics_BD Dean Mann Supply Caging_Sioux Falls_20250320.pdf

PDF 651 KB Posted

Attached to
BG Dean Mann armory supply cages Federal contract opportunity
Solicitation number
W912MM25QA022
Issued by
Department of the Army South Dakota Army National Guard

About this file

This is a floor plan schematic for the Supply Room Caging at the Dean Mann Readiness Center in South Dakota, dated 12 December 2024. The detailed architectural drawing shows a comprehensive layout for 18 storage cages, with all cages specified to be 10 feet tall. The floor plan is designed for the South Dakota Department of the Military and includes multiple areas labeled as Unit Supply, Vault, and Supply Office. The cages are strategically arranged across different sections of the facility, with varying dimensions ranging from 12'-0" to 16'-0", and the total floor plan spans approximately 46'-7 5/16" by 36'-0 15/32". The schematic provides precise measurements and positioning for each cage, supply room, and associated spaces, offering a comprehensive visual representation of the proposed storage and supply infrastructure for the military facility.

View the file

Other files for this federal contract opportunity

Other files attached to BG Dean Mann armory supply cages, newest first.
File Type Posted
Solicitation Amendment W912MM25QA0220001 SF 30.pdf PDF
Solicitation - W912MM25QA022 -Amendment.pdf PDF
Solicitation - W912MM25QA022.pdf PDF
08. Schematics_BD Dean Mann Supply Caging_Sioux Falls_20250320.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT

SUPPLY

UNIT

SUPPLY

VAULT

D

7.

D

1.

D

3.

SUPPLY

OFFIC

E

FE

C

D132.1

VAULT

SUPPLY

OFFIC

E

D130.1

D

8.

UNIT

SUPPLY

VAULT

SUPPLY

OFFIC

E

D

0.

D303.1

D

1.

46'-5 1/4" 46'-7 5/16" 36'-0 15/32"

'-8

14'-11 1/4" 6'-4" 25'-4 1/32" 15'-1 5/32" 6'-4 1/32" 13'-10 9/16"

3 3

1 1

1 1

1 1

1 1 1 1

2 2 2

2 2 2 2

1 1

1 1

8' -0

8'

-0

8' -0

8'

-0

6' -8

12'-0"

12'-0"

12'-0"

'-0

8'

-0

8' -0

6'

-1

1/ 4"

1 1

1 1

8' -0

'-0

'-0

16'-0"

'-0

'-1

1/ 4"

'-7

/8

4'-0"

16'-0"

'-0

'-0

'-0

8'-0"

SHEET No:

DATE:

SUBMITTAL:

FL

O

O R

PL

AN

SU

PP

LY

R

O O

M C

AG

IN

G

DE

AN

M

AN

N

R

EA

DI

N

ES

S

CE

N

TE

R

CF

M

O

-C

AG

IN

G

XX%

12 DEC 2024

G-101

SO

U

TH

D

AK

O

TA

D

EP

AR

TM

EN

T O

F

TH

E M

IL

IT

AR

Y

SD

AR

N G

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DEPARTM

ENT

OF

TH

EM

ILITARY

S T A

T E

O F

S O

U T

H

D A

K

O

TA

Cage 1

Cage 2

Cage 4

Cage 5

Cage 6

Cage 7

Cage 8

Cage 9

Cage 10

Cage 11

Cage 12

Cage 3

Cage 13

Cage 14

Cage 15

Cage 16

Cage 17

All cages will be 10FT tall

All cages will be 10FT tall

All cages will be 10FT tall

16'-0"

Cage 18

Sheets and Views
Caging

File details come from the government source that posted it. Updated .