Questions-Answers P2.pdf
PDF 95 KB Posted
- Solicitation number
- W912MM-20-R-0001
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
South Dakota National Guard MATOC Questions and Answers
Part 2
14 January 2020
1. Q: How are we to fill out the Price schedule in the solicitation pages 3-13? We are pricing a seed project that has 4 CLINS that does not pertain to option year pricing or Man power reporting.
1. A: Submit Proposal as per section 00110 of the solicitation.
2. Q: Per the Statement of work, it requires us to remove damage roof sheathings. Is this the entire roof or a specified amount? If it’s a specified amount please quantify.
2. A: Price per the drawings.
3. Q: There are no electrical drawings or specifications to work from. In the statement of work it item #7 it states “Remove obsolete electrical and communications conduits and wiring. Replace exterior light fixtures.” Please quantify the exterior light fixtures and all obsolete electrical and communications conduits and wiring.
3. A: Reference Attachment 4 – Protoypical Proj B55 Specs, Paragraph 1.01, A.7. is not required.
4. Q: On the demo plans page A2 it only reference Note J “Remove (E) 3’-0”x1’-6” aluminum sliding window.”
However, Page A3 says to remove all windows. Please confirm that we are to remove all windows.
4. A: Remove windows as per Drawings.
5. Q: Do we need to pull out/demo the door frames or just the door slabs?
5. A: Please refer to the drawings.
6. Q: Where is the seed projects location?
6. A: Sioux Falls, SD
7. Q: When will the questions be answered? If the questions were to be answered today, which would be difficult to accommodate, that would leave the contractor 3 working days to consider the new information. I would request we have at least 7 working days from the date of receipt of answered questions.
7. A: Questions were to be answered by close of business 14 January 2020. Proposals are due as per the solicitation.
File details come from the government source that posted it. Updated .