PWS Landscaping Services.pdf

PDF 191 KB Posted

Attached to
Landscape Care and Maintenance Services Federal contract opportunity
Solicitation number
W912LR24Q0030
Issued by
Department of the Army National Guard

About this file

This document is a Performance Work Statement (PWS) for Landscape Care and Maintenance Services at Camp Santiago Joint Training Center in Salinas, Puerto Rico. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform monthly landscaping services on 22.1 acres surrounding Building 2001, including lawn mowing, vegetation mowing, edging, trimming, and weed removal. The Period of Performance is 1 Base Year of 12 months with 1 12-month option year. The Government will provide utilities, while the contractor shall furnish all other required property, materials, and equipment. The PWS outlines performance standards, quality control, and quality assurance requirements. A related Federal Contract Opportunity under Solicitation Number W912LR24Q0030 seeks these landscaping services through a Firm Fixed Price contract. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, with a site visit scheduled for April 17, 2024, and a quote submission deadline of April 22, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Landscape Care and Maintenance Services, newest first.
File Type Posted
W912LR24Q0030 Questions and Answers.pdf PDF
W912LR24Q0030 - 0001 - Solicitation Modification.pdf PDF
Allowable Herbicides.xlsx XLSX spreadsheet
W912LR24Q0030 Combined Synopsis-Solicitation.pdf PDF
W912LR24Q0030 - ASP Grounds Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT (PWS)

FOR

Landscape Care and Maintenance Services for Areas Surrounding Building 2001, CSJTC, Salinas, Puerto Rico

19 March 2024

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform monthly landscaping care and maintenance services as defined in this PWS.

1.1.1 Objectives Ground Maintenance Services (Lawn Mowing, Vegetation Mowing, Edging, Trimming, and Weed Removal) on 22.1 acres of terrain surrounding building #2001 in Camp Santiago Joint Training Center, to provide visibility, security, and mobility on the premises. The contractor shall provide landscaping and groundskeeping services, and the equipment required (trimmers, mowing tractors, backpack blowers, mowing and cleaning tools, safety equipment and uniforms, fuel, herbicide, and any other additional equipment) to facilitate the cleaning of the vegetation and perimeter areas.

1.2 Background: Applicable regulations for the surroundings areas of building #2001 in Camp Santiago Joint Training Center, requires the zone to be clear of obstacles, topographic features, and vegetation exceeding eight inches (8") in height. Clear zones will extend sixty feet (60') on the outside and 30 feet (30') on the inside of the perimeter fence. Vegetation or topographical features, which must be retained in clear zones for erosion control, and for legal reasons, will be trimmed or pruned to eliminate concealment.

1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and 1 (12-month) option year.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1630 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be on the surrounding areas of Building #2001 (Camp Santiago Training Center, Salinas, PR) extending beyond sixty feet (60') of its perimeter fence. The contractor shall maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework is not authorized.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor's employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification (company identifiable identification badge) with them and shall be subject to such checks as may be deemed necessary. Contractor employees shall wear protective equipment while performing landscaping/groundskeeping tasks such as helmet, goggles, gloves, protective boots, and ear protection devices. Contractor employees shall not wear any type of military uniform at any time while in the facility.

The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer's (KO's) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR190-13), applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by Government representative), or at OCONUS locations, in accordance with status of forces agreement and other theater regulations.

1.4.5.2 AT Level 1 Training: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 15 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil

1.4.5.3 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 15 calendar days of contract award and within 15 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 15 calendar days after contract award.

1.4.5.4 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.5 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.

1.4.6 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all licenses and certifications required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor's performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor's performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor's status as a "contractor" shall be predominantly displayed in all correspondence types (to include signature blocks on e- mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word "contractor" displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD 254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense ECM Earth Covered Magazine

FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: None.

3.2 Materials: None.

3.3 Equipment: None.

3.4 Services: None.

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government- Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Lawn Mowing.

5.1.1 Area will be mowed and trimmed to maintain a uniform lawn height to look well-manicured, with a neat and professional appearance. Lawns will be cut to a uniform height of 8-inches. Grass clippings will be evenly distributed with no windrows, matting, or clumps. The level of vegetation permitted within firebreaks should be minimal. A 50-feet firebreak will be maintained around munitions operating facilities, including munitions storage structures and areas including outdoor munitions storage and ready munitions storage. A 5-feet firebreak will be maintained around ECM ventilators and on both sides of fences.

5.2 Edging.

5.2.1 Grass vegetation will be cut no more than 1/2-1 inch from the surface edged, maintaining an even contour with the edged surface, uniform in appearance and free of scalping, and uneven or rough cutting. Sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within the area will be edged. Grass clippings will be removed from, beds, sidewalks, curbs, gutters, streets, (hard surfaces), etc., before leaving the work area to maintain a clean appearance.

5.3 Trimming.

5.3.1 Grass and weeds will be trimmed around trees, shrubs, hedges, buildings, fences, poles, posts, and other fixed obstacles.

5.4 Manual Weed Removal (Southwestern Rocky Slope within surroundings).

5.4.1 Weeds in the area will be manually removed and eco-friendly herbicide applied to this area to prevent weed growth.

5.5 Waste Management.

5.5.1 Transportation and disposition of all waste and vegetation material resulting from all mowing, trimming, and edging tasks performing these services.

6.0 Applicable Publications: Publications applicable to this PWS are listed below

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website DD Form 369 Police

Record Check Oct 2021 http://www.dtic.mil/whs/directives/forms/dd/ddforms

0001- 0499.htm

Publication (Chapter/Page) Date of Publication Mandatory or Advisory

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar

Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1, DoD Identification (ID) Cards, (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1: 07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2, Personal Identity Verification (PIV) of Federal Employees and Contractors, (paragraph 9)

Aug-13 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

4/3/2017 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC)

09/09/14 (Change 1: 05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors 8/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 1/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy Program

5/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01 Cyberspace Workforce Management

10/5/2020 https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce Improvement Program

12/19/2005 (Change 4: 11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/

DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM)

02/28/2006 (Change 2: 05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/

Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors

3/7/2014 https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx

AR 25-2 Information Assurance 2/4/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 530-1 Operations Security 9/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 525-13 Antiterrorism 12/9/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 381-12 Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b)

6/1/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective Performance Standard Acceptable

Quality Levels

(AQL)

Surveillance Method / By Whom

5.1 Landscaping Services The contractor shall

provide landscaping care and maintenance once per month.

Meets the standard 100% of the time.

100% Inspection/COR

5.2 Edging The contractor shall cut

grass and vegetation between 0 .5 inch to 1 inch (no more than 1 inch) from the surfaced edged while maintaining an even contour with the surface.

Meets the standard 90% of the time.

Periodic Inspection/COR

5.5 Waste Management The contractor disposes

of all waste, materials, and vegetation materials resulting from the performance of this service.

Meets the standard 90% of the time.

Periodic Inspection/COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title Frequency Number of Copies Medium/Format Submit To

1.4.3 Quality Control

Plan

Provide within 10 calendar days after contract award

1 Electronic Submission

COR

1.4.5.2 AT Level 1

Certificates

Provide within 15 calendar days after contract award

1 Electronic Submission

COR

1.4.5.3 iWatch Training

Provide within 15 calendar days after contract award

1 Electronic Submission

COR

1.4.5.5 OPSEC

Training

Provide within 15 calendar days after contract award

1 Electronic Submission

COR

1.4.9 Contract

Manager

Provide within 10 calendar days after contract award

1 Electronic Submission

COR

1.4.10 Identification

Media

Return within 14 days of employee’s departure from contract performance

1 Electronic Submission

COR

File details come from the government source that posted it. Updated .