Mates Temp Offices Plans 27AUG21_Rev3.pdf
PDF 4 MB Posted
- Attached to
- PRNG - MATES Facilities Repairs and Alterations Federal contract opportunity
- Solicitation number
- W912LR21B0001
- Issued by
- Department of the Army National Guard
About this file
This is a Statement of Work (SOW) for a construction services contract awarded by the Department of the Army National Guard. The contractor shall provide all personnel, equipment, tools, materials, supervision and quality control necessary to perform construction services for temporary administrative buildings and maintenance bays in Buildings 1026, 1027 and 1028 at Camp Santiago Joint Training Center in Salinas, Puerto Rico. Specifically, the work includes refurbishing and repurposing existing buildings to fabricate temporary office areas, construction of partitions, installation of ceilings, lighting, air conditioning and electrical systems. The contractor is responsible for obtaining all required permits and coordinating inspections and certifications. References to the SOW and scope of work are included as an attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MATES Plans 10 Sep 2021.pdf | ||
| MATES Government Responses 10 Sep 2021.pdf | ||
| Davis Bacon Act 2021.pdf | ||
| W912LR21B0001 MATES REPAIRS AND ALTERATIONS.pdf | ||
| TE 3 Site Pictures - Electronics Shop.pdf | ||
| TE 1 Drawings.pdf | ||
| SF24.pdf | ||
| TE 5 Site Pictures - Utility Pole 3-Phase Bldg. 1026.pdf | ||
| TE 4 Site Pictures - Maintenance Shop.pdf | ||
| SOW Mates Temp Facilities (Ver 22June2021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADJUTANT GENERAL
MAJ GEN JOSÉ J. REYES
PUERTO RICO ARMY NATIONAL GUARD
TEL. (787) 289-1400 EXT. 7050
STATE ROAD PR 1 INT. 154 KM 89.5
CAMP SANTIAGO JOINT TRAINING CENTER
DIRECTORATE OF PUBLIC WORKS
GARRISON COMMANDER
COL ISRAEL ROMERO
DEPARTMENT OF THE ARMY
DPW DIRECTOR
LTC JOSÉ E. VELÁZQUEZ CARLO
TEMPORARY OFFICE AREAS FOR MATES IN CAMP SANTIAGO
REVIEWED BY:
NUM. PAGEDESCRIPTION
CPT ARGENIES GONZALEZ DRAWN BY:
CARLOS MONTOYO DESIGN BY:
ELIAS TOLEDO, PE
1. Title Sheet....................................................................................... T-01
2. General Notes................................................................................. G-01
3. Existing Conditions.......................................................................... G-02
4. New Construction Floor Plan........................................................... G-03
5. New Construction Floor Plan 2 ....................................................... G-04
6. Electrical Plan (Switches/Outlets).................................................... E-01
7. Electrical, Mechanical, and Illumination .......................................... E-02
8. Utility Connections (Electrical) ........................................................ E-03
9. Acoustic Ceiling Plan ...................................................................... A-01
AutoCAD SHX Text
DIRECTORATE OF ENGINEERING
AutoCAD SHX Text
DIRECTORATE OF ENGINEERING
P U
E R
T O
R
I C
A
M Y
N
T
I O
N
L
G
A R
D
G E
N E
R A
L N
O T
E S
T E
M P
O R
A R
Y O
F F
IC
E
A R
E A
S F
O R
M A
T E
S
IN
C A
M P
S A
N T
IA
G
O
C A
M P
S A
N T
IA
G
O J
O
IN
T T
R A
IN
IN
G C
E N
T E
R , S
A
LI
N A
S , P
R
GENERAL NOTES: SCOPE OF THE PROJECT:
GENERAL SYMBOLS LEGEND:
AutoCAD SHX Text
DIRECTORATE OF ENGINEERING
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text R E V I S I O N S
AutoCAD SHX Text D E S C R I P T I O N
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text C A L L E G E N E R A L E S T E V E S #100 , S A N J U A N P U E R T O R I C O 00901 - 2104
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGN:
AutoCAD SHX Text
TOTAL SHEETS:
AutoCAD SHX Text
SHEET NAME:
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CERTIFIED:
AutoCAD SHX Text
SUPERVISOR:
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text D E S C R I P T I O N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CARLOS MONTOYO
AutoCAD SHX Text
CPT ARGENIES GONZALEZ
AutoCAD SHX Text
LTC JOSE VELAZQUEZ
AutoCAD SHX Text 20210730
AutoCAD SHX Text G-01
AutoCAD SHX Text
1. THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE GENERAL NOTES ARE NOT INTENDED TO REPLACE GENERAL NOTES ARE NOT INTENDED TO REPLACE NOTES ARE NOT INTENDED TO REPLACE NOTES ARE NOT INTENDED TO REPLACE ARE NOT INTENDED TO REPLACE ARE NOT INTENDED TO REPLACE NOT INTENDED TO REPLACE NOT INTENDED TO REPLACE INTENDED TO REPLACE INTENDED TO REPLACE TO REPLACE TO REPLACE REPLACE REPLACE SPECIFICATIONS. SEE SPECIFICATIONS FOR REQUIREMENTS IN SEE SPECIFICATIONS FOR REQUIREMENTS IN SEE SPECIFICATIONS FOR REQUIREMENTS IN SPECIFICATIONS FOR REQUIREMENTS IN SPECIFICATIONS FOR REQUIREMENTS IN FOR REQUIREMENTS IN FOR REQUIREMENTS IN REQUIREMENTS IN REQUIREMENTS IN IN IN ADDITION TO GENERAL NOTES. 2. REFER TO THE GENERAL CONDITIONS AND DIVISION 1 REFER TO THE GENERAL CONDITIONS AND DIVISION 1 TO THE GENERAL CONDITIONS AND DIVISION 1 TO THE GENERAL CONDITIONS AND DIVISION 1 THE GENERAL CONDITIONS AND DIVISION 1 THE GENERAL CONDITIONS AND DIVISION 1 GENERAL CONDITIONS AND DIVISION 1 GENERAL CONDITIONS AND DIVISION 1 CONDITIONS AND DIVISION 1 CONDITIONS AND DIVISION 1 AND DIVISION 1 AND DIVISION 1 DIVISION 1 DIVISION 1 1 1 "GENERAL REQUIREMENTS IN THE SPECIFICATIONS. 3. CONTRACTOR AND ALL TRADES SHALL NOTE REQUIREMENTS CONTRACTOR AND ALL TRADES SHALL NOTE REQUIREMENTS AND ALL TRADES SHALL NOTE REQUIREMENTS AND ALL TRADES SHALL NOTE REQUIREMENTS ALL TRADES SHALL NOTE REQUIREMENTS ALL TRADES SHALL NOTE REQUIREMENTS TRADES SHALL NOTE REQUIREMENTS TRADES SHALL NOTE REQUIREMENTS SHALL NOTE REQUIREMENTS SHALL NOTE REQUIREMENTS NOTE REQUIREMENTS NOTE REQUIREMENTS REQUIREMENTS REQUIREMENTS OF "GENERAL NOTES" ON ALL SHEETS. 4. WHERE INFORMATION MAY BE AT VARIANCE BETWEEN PLANS WHERE INFORMATION MAY BE AT VARIANCE BETWEEN PLANS INFORMATION MAY BE AT VARIANCE BETWEEN PLANS INFORMATION MAY BE AT VARIANCE BETWEEN PLANS MAY BE AT VARIANCE BETWEEN PLANS MAY BE AT VARIANCE BETWEEN PLANS BE AT VARIANCE BETWEEN PLANS BE AT VARIANCE BETWEEN PLANS AT VARIANCE BETWEEN PLANS AT VARIANCE BETWEEN PLANS VARIANCE BETWEEN PLANS VARIANCE BETWEEN PLANS BETWEEN PLANS BETWEEN PLANS PLANS PLANS AND SPECIFICATIONS, THE PLANS SHALL GOVERN. HOWEVER, IF SPECIFICATIONS, THE PLANS SHALL GOVERN. HOWEVER, IF SPECIFICATIONS, THE PLANS SHALL GOVERN. HOWEVER, IF THE PLANS SHALL GOVERN. HOWEVER, IF THE PLANS SHALL GOVERN. HOWEVER, IF PLANS SHALL GOVERN. HOWEVER, IF PLANS SHALL GOVERN. HOWEVER, IF SHALL GOVERN. HOWEVER, IF SHALL GOVERN. HOWEVER, IF GOVERN. HOWEVER, IF GOVERN. HOWEVER, IF HOWEVER, IF HOWEVER, IF IF IF CERTAIN INFORMATION IS NOTED ONLY ON THE PLANS OR ONLY INFORMATION IS NOTED ONLY ON THE PLANS OR ONLY INFORMATION IS NOTED ONLY ON THE PLANS OR ONLY IS NOTED ONLY ON THE PLANS OR ONLY IS NOTED ONLY ON THE PLANS OR ONLY NOTED ONLY ON THE PLANS OR ONLY NOTED ONLY ON THE PLANS OR ONLY ONLY ON THE PLANS OR ONLY ONLY ON THE PLANS OR ONLY ON THE PLANS OR ONLY ON THE PLANS OR ONLY THE PLANS OR ONLY THE PLANS OR ONLY PLANS OR ONLY PLANS OR ONLY OR ONLY OR ONLY ONLY ONLY IN THE SPECIFICATIONS, THE INFORMATION WILL BE CONSIDERED THE SPECIFICATIONS, THE INFORMATION WILL BE CONSIDERED THE SPECIFICATIONS, THE INFORMATION WILL BE CONSIDERED SPECIFICATIONS, THE INFORMATION WILL BE CONSIDERED SPECIFICATIONS, THE INFORMATION WILL BE CONSIDERED THE INFORMATION WILL BE CONSIDERED THE INFORMATION WILL BE CONSIDERED INFORMATION WILL BE CONSIDERED INFORMATION WILL BE CONSIDERED WILL BE CONSIDERED WILL BE CONSIDERED BE CONSIDERED BE CONSIDERED CONSIDERED CONSIDERED AS VALID AS BEING NOTED ON PLANS AND IN THE VALID AS BEING NOTED ON PLANS AND IN THE VALID AS BEING NOTED ON PLANS AND IN THE AS BEING NOTED ON PLANS AND IN THE AS BEING NOTED ON PLANS AND IN THE BEING NOTED ON PLANS AND IN THE BEING NOTED ON PLANS AND IN THE NOTED ON PLANS AND IN THE NOTED ON PLANS AND IN THE ON PLANS AND IN THE ON PLANS AND IN THE PLANS AND IN THE PLANS AND IN THE AND IN THE AND IN THE IN THE IN THE THE THE SPECIFICATIONS. 5. THE CONTRACTOR SHALL VISIT THE PROJECT SITE TO THE CONTRACTOR SHALL VISIT THE PROJECT SITE TO CONTRACTOR SHALL VISIT THE PROJECT SITE TO CONTRACTOR SHALL VISIT THE PROJECT SITE TO SHALL VISIT THE PROJECT SITE TO SHALL VISIT THE PROJECT SITE TO VISIT THE PROJECT SITE TO VISIT THE PROJECT SITE TO THE PROJECT SITE TO THE PROJECT SITE TO PROJECT SITE TO PROJECT SITE TO SITE TO SITE TO TO TO VERIFY EXISTING CONDITION AND IDENTIFY VISIBLE PROBLEM EXISTING CONDITION AND IDENTIFY VISIBLE PROBLEM EXISTING CONDITION AND IDENTIFY VISIBLE PROBLEM CONDITION AND IDENTIFY VISIBLE PROBLEM CONDITION AND IDENTIFY VISIBLE PROBLEM AND IDENTIFY VISIBLE PROBLEM AND IDENTIFY VISIBLE PROBLEM IDENTIFY VISIBLE PROBLEM IDENTIFY VISIBLE PROBLEM VISIBLE PROBLEM VISIBLE PROBLEM PROBLEM PROBLEM AREAS OR DIFFICULTIES IN ORDER TO INCLUDE ALL COST IN OR DIFFICULTIES IN ORDER TO INCLUDE ALL COST IN OR DIFFICULTIES IN ORDER TO INCLUDE ALL COST IN DIFFICULTIES IN ORDER TO INCLUDE ALL COST IN DIFFICULTIES IN ORDER TO INCLUDE ALL COST IN IN ORDER TO INCLUDE ALL COST IN IN ORDER TO INCLUDE ALL COST IN ORDER TO INCLUDE ALL COST IN ORDER TO INCLUDE ALL COST IN TO INCLUDE ALL COST IN TO INCLUDE ALL COST IN INCLUDE ALL COST IN INCLUDE ALL COST IN ALL COST IN ALL COST IN COST IN COST IN IN IN BASE BID. 6. IF SPACE IS AVAILABLE, THE OWNER MAY PERMIT THE IF SPACE IS AVAILABLE, THE OWNER MAY PERMIT THE SPACE IS AVAILABLE, THE OWNER MAY PERMIT THE SPACE IS AVAILABLE, THE OWNER MAY PERMIT THE IS AVAILABLE, THE OWNER MAY PERMIT THE IS AVAILABLE, THE OWNER MAY PERMIT THE AVAILABLE, THE OWNER MAY PERMIT THE AVAILABLE, THE OWNER MAY PERMIT THE THE OWNER MAY PERMIT THE THE OWNER MAY PERMIT THE OWNER MAY PERMIT THE OWNER MAY PERMIT THE MAY PERMIT THE MAY PERMIT THE PERMIT THE PERMIT THE THE THE CONTRACTOR TO STORE SOME MATERIALS, EQUIPMENTS AND TO STORE SOME MATERIALS, EQUIPMENTS AND TO STORE SOME MATERIALS, EQUIPMENTS AND STORE SOME MATERIALS, EQUIPMENTS AND STORE SOME MATERIALS, EQUIPMENTS AND SOME MATERIALS, EQUIPMENTS AND SOME MATERIALS, EQUIPMENTS AND MATERIALS, EQUIPMENTS AND MATERIALS, EQUIPMENTS AND EQUIPMENTS AND EQUIPMENTS AND AND AND TOOLS ON THE SITE IN AN AREA APPROVED BY THE OWNER. ON THE SITE IN AN AREA APPROVED BY THE OWNER. ON THE SITE IN AN AREA APPROVED BY THE OWNER. THE SITE IN AN AREA APPROVED BY THE OWNER. THE SITE IN AN AREA APPROVED BY THE OWNER. SITE IN AN AREA APPROVED BY THE OWNER. SITE IN AN AREA APPROVED BY THE OWNER. IN AN AREA APPROVED BY THE OWNER. IN AN AREA APPROVED BY THE OWNER. AN AREA APPROVED BY THE OWNER. AN AREA APPROVED BY THE OWNER. AREA APPROVED BY THE OWNER. AREA APPROVED BY THE OWNER. APPROVED BY THE OWNER. APPROVED BY THE OWNER. BY THE OWNER. BY THE OWNER. THE OWNER. THE OWNER. OWNER. OWNER. THE CONTRACTORS ACCEPTS FULL RESPONSIBILITY FOR ANY AND CONTRACTORS ACCEPTS FULL RESPONSIBILITY FOR ANY AND CONTRACTORS ACCEPTS FULL RESPONSIBILITY FOR ANY AND ACCEPTS FULL RESPONSIBILITY FOR ANY AND ACCEPTS FULL RESPONSIBILITY FOR ANY AND FULL RESPONSIBILITY FOR ANY AND FULL RESPONSIBILITY FOR ANY AND RESPONSIBILITY FOR ANY AND RESPONSIBILITY FOR ANY AND FOR ANY AND FOR ANY AND ANY AND ANY AND AND AND ALL STORED MATERIALS, EQUIPMENTS AND TOOLS. 7. THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL CONTRACTOR SHALL CHECK AND VERIFY ALL CONTRACTOR SHALL CHECK AND VERIFY ALL SHALL CHECK AND VERIFY ALL SHALL CHECK AND VERIFY ALL CHECK AND VERIFY ALL CHECK AND VERIFY ALL AND VERIFY ALL AND VERIFY ALL VERIFY ALL VERIFY ALL ALL ALL DIMENSIONS AND GRADE CONDITIONS, (BOTH NEW AND EXISTING) AND GRADE CONDITIONS, (BOTH NEW AND EXISTING) AND GRADE CONDITIONS, (BOTH NEW AND EXISTING) GRADE CONDITIONS, (BOTH NEW AND EXISTING) GRADE CONDITIONS, (BOTH NEW AND EXISTING) CONDITIONS, (BOTH NEW AND EXISTING) CONDITIONS, (BOTH NEW AND EXISTING) (BOTH NEW AND EXISTING) (BOTH NEW AND EXISTING) NEW AND EXISTING) NEW AND EXISTING) AND EXISTING) AND EXISTING) EXISTING) EXISTING) REPORTING ANY DISCREPANCIES TO THE ARCHITECT/ ENGINEER ANY DISCREPANCIES TO THE ARCHITECT/ ENGINEER ANY DISCREPANCIES TO THE ARCHITECT/ ENGINEER DISCREPANCIES TO THE ARCHITECT/ ENGINEER DISCREPANCIES TO THE ARCHITECT/ ENGINEER TO THE ARCHITECT/ ENGINEER TO THE ARCHITECT/ ENGINEER THE ARCHITECT/ ENGINEER THE ARCHITECT/ ENGINEER ARCHITECT/ ENGINEER ARCHITECT/ ENGINEER ENGINEER ENGINEER PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH ANY TO ORDERING MATERIALS OR PROCEEDING WITH ANY TO ORDERING MATERIALS OR PROCEEDING WITH ANY ORDERING MATERIALS OR PROCEEDING WITH ANY ORDERING MATERIALS OR PROCEEDING WITH ANY MATERIALS OR PROCEEDING WITH ANY MATERIALS OR PROCEEDING WITH ANY OR PROCEEDING WITH ANY OR PROCEEDING WITH ANY PROCEEDING WITH ANY PROCEEDING WITH ANY WITH ANY WITH ANY ANY ANY PHASE OF THE WORK. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SHALL BE RESPONSIBLE FOR PROVIDING SHALL BE RESPONSIBLE FOR PROVIDING BE RESPONSIBLE FOR PROVIDING BE RESPONSIBLE FOR PROVIDING RESPONSIBLE FOR PROVIDING RESPONSIBLE FOR PROVIDING FOR PROVIDING FOR PROVIDING PROVIDING PROVIDING ALL MATERIALS (UNLESS NOTED OTHERWISE) AND WORKMANSHIP MATERIALS (UNLESS NOTED OTHERWISE) AND WORKMANSHIP MATERIALS (UNLESS NOTED OTHERWISE) AND WORKMANSHIP (UNLESS NOTED OTHERWISE) AND WORKMANSHIP (UNLESS NOTED OTHERWISE) AND WORKMANSHIP NOTED OTHERWISE) AND WORKMANSHIP NOTED OTHERWISE) AND WORKMANSHIP OTHERWISE) AND WORKMANSHIP OTHERWISE) AND WORKMANSHIP AND WORKMANSHIP AND WORKMANSHIP WORKMANSHIP WORKMANSHIP IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL BUILDING ACCORDANCE WITH FEDERAL, STATE AND LOCAL BUILDING ACCORDANCE WITH FEDERAL, STATE AND LOCAL BUILDING WITH FEDERAL, STATE AND LOCAL BUILDING WITH FEDERAL, STATE AND LOCAL BUILDING FEDERAL, STATE AND LOCAL BUILDING FEDERAL, STATE AND LOCAL BUILDING STATE AND LOCAL BUILDING STATE AND LOCAL BUILDING AND LOCAL BUILDING AND LOCAL BUILDING LOCAL BUILDING LOCAL BUILDING BUILDING BUILDING CODES AND THEIR REQUIREMENTS. 9. GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR SHALL SUBMIT SHOP DRAWINGS FOR SHALL SUBMIT SHOP DRAWINGS FOR SUBMIT SHOP DRAWINGS FOR SUBMIT SHOP DRAWINGS FOR SHOP DRAWINGS FOR SHOP DRAWINGS FOR DRAWINGS FOR DRAWINGS FOR FOR FOR ARCHITECT/ENGINEER APPROVAL FOR ALL ITEMS CALLED FOR OR APPROVAL FOR ALL ITEMS CALLED FOR OR APPROVAL FOR ALL ITEMS CALLED FOR OR FOR ALL ITEMS CALLED FOR OR FOR ALL ITEMS CALLED FOR OR ALL ITEMS CALLED FOR OR ALL ITEMS CALLED FOR OR ITEMS CALLED FOR OR ITEMS CALLED FOR OR CALLED FOR OR CALLED FOR OR FOR OR FOR OR OR OR INDICATED ON PLANS BUT NOT SPECIFICALLY DETAILED. WHERE ON PLANS BUT NOT SPECIFICALLY DETAILED. WHERE ON PLANS BUT NOT SPECIFICALLY DETAILED. WHERE PLANS BUT NOT SPECIFICALLY DETAILED. WHERE PLANS BUT NOT SPECIFICALLY DETAILED. WHERE BUT NOT SPECIFICALLY DETAILED. WHERE BUT NOT SPECIFICALLY DETAILED. WHERE NOT SPECIFICALLY DETAILED. WHERE NOT SPECIFICALLY DETAILED. WHERE SPECIFICALLY DETAILED. WHERE SPECIFICALLY DETAILED. WHERE DETAILED. WHERE DETAILED. WHERE WHERE WHERE FURTHER CLARIFICATION FOR CONSTRUCTION IS REQUIRED, THE CLARIFICATION FOR CONSTRUCTION IS REQUIRED, THE CLARIFICATION FOR CONSTRUCTION IS REQUIRED, THE FOR CONSTRUCTION IS REQUIRED, THE FOR CONSTRUCTION IS REQUIRED, THE CONSTRUCTION IS REQUIRED, THE CONSTRUCTION IS REQUIRED, THE IS REQUIRED, THE IS REQUIRED, THE REQUIRED, THE REQUIRED, THE THE THE ARCHITECT/ ENGINEER WILL SUBMIT DETAILS ON REQUEST. 10. ALL WORK SHALL BE DONE IN A THOROUGH AND ALL WORK SHALL BE DONE IN A THOROUGH AND WORK SHALL BE DONE IN A THOROUGH AND WORK SHALL BE DONE IN A THOROUGH AND SHALL BE DONE IN A THOROUGH AND SHALL BE DONE IN A THOROUGH AND BE DONE IN A THOROUGH AND BE DONE IN A THOROUGH AND DONE IN A THOROUGH AND DONE IN A THOROUGH AND IN A THOROUGH AND IN A THOROUGH AND A THOROUGH AND A THOROUGH AND THOROUGH AND THOROUGH AND AND AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE APPLICABLE MANNER IN ACCORDANCE WITH THE APPLICABLE MANNER IN ACCORDANCE WITH THE APPLICABLE IN ACCORDANCE WITH THE APPLICABLE IN ACCORDANCE WITH THE APPLICABLE ACCORDANCE WITH THE APPLICABLE ACCORDANCE WITH THE APPLICABLE WITH THE APPLICABLE WITH THE APPLICABLE THE APPLICABLE THE APPLICABLE APPLICABLE APPLICABLE SPECIFICATIONS AND DRAWINGS. THE LATEST EDITION OF THE AND DRAWINGS. THE LATEST EDITION OF THE AND DRAWINGS. THE LATEST EDITION OF THE DRAWINGS. THE LATEST EDITION OF THE DRAWINGS. THE LATEST EDITION OF THE THE LATEST EDITION OF THE THE LATEST EDITION OF THE LATEST EDITION OF THE LATEST EDITION OF THE EDITION OF THE EDITION OF THE OF THE OF THE THE THE APPLICABLE CODES (FOR ANY SPECIFIC WORK) SHALL BE CODES (FOR ANY SPECIFIC WORK) SHALL BE CODES (FOR ANY SPECIFIC WORK) SHALL BE (FOR ANY SPECIFIC WORK) SHALL BE (FOR ANY SPECIFIC WORK) SHALL BE ANY SPECIFIC WORK) SHALL BE ANY SPECIFIC WORK) SHALL BE SPECIFIC WORK) SHALL BE SPECIFIC WORK) SHALL BE WORK) SHALL BE WORK) SHALL BE SHALL BE SHALL BE BE BE FALLOWED EXCEPT WHERE LOCAL REGULATIONS ARE MORE EXCEPT WHERE LOCAL REGULATIONS ARE MORE EXCEPT WHERE LOCAL REGULATIONS ARE MORE WHERE LOCAL REGULATIONS ARE MORE WHERE LOCAL REGULATIONS ARE MORE LOCAL REGULATIONS ARE MORE LOCAL REGULATIONS ARE MORE REGULATIONS ARE MORE REGULATIONS ARE MORE ARE MORE ARE MORE MORE MORE STRINGENT IN WHICH CASE LOCAL REGULATIONS SHALL GOVERN. 11. THE CONTRACTOR SHALL COMPARE STRUCTURAL SECTIONS THE CONTRACTOR SHALL COMPARE STRUCTURAL SECTIONS CONTRACTOR SHALL COMPARE STRUCTURAL SECTIONS CONTRACTOR SHALL COMPARE STRUCTURAL SECTIONS SHALL COMPARE STRUCTURAL SECTIONS SHALL COMPARE STRUCTURAL SECTIONS COMPARE STRUCTURAL SECTIONS COMPARE STRUCTURAL SECTIONS STRUCTURAL SECTIONS STRUCTURAL SECTIONS SECTIONS SECTIONS WITH ARCHITECTURAL SECTIONS AND REPORT ANY DISCREPANCY ARCHITECTURAL SECTIONS AND REPORT ANY DISCREPANCY ARCHITECTURAL SECTIONS AND REPORT ANY DISCREPANCY SECTIONS AND REPORT ANY DISCREPANCY SECTIONS AND REPORT ANY DISCREPANCY AND REPORT ANY DISCREPANCY AND REPORT ANY DISCREPANCY REPORT ANY DISCREPANCY REPORT ANY DISCREPANCY ANY DISCREPANCY ANY DISCREPANCY DISCREPANCY DISCREPANCY TO THE ARCHITECT/ENGINEER PRIOR TO FABRICATION OR THE ARCHITECT/ENGINEER PRIOR TO FABRICATION OR THE ARCHITECT/ENGINEER PRIOR TO FABRICATION OR ARCHITECT/ENGINEER PRIOR TO FABRICATION OR ARCHITECT/ENGINEER PRIOR TO FABRICATION OR PRIOR TO FABRICATION OR PRIOR TO FABRICATION OR TO FABRICATION OR TO FABRICATION OR FABRICATION OR FABRICATION OR OR OR INSTALLATION OF STRUCTURAL MEMBERS. 12. REFER TO ALL CONSTRUCTION DOCUMENTS FOR REFER TO ALL CONSTRUCTION DOCUMENTS FOR TO ALL CONSTRUCTION DOCUMENTS FOR TO ALL CONSTRUCTION DOCUMENTS FOR ALL CONSTRUCTION DOCUMENTS FOR ALL CONSTRUCTION DOCUMENTS FOR CONSTRUCTION DOCUMENTS FOR CONSTRUCTION DOCUMENTS FOR DOCUMENTS FOR DOCUMENTS FOR FOR FOR REQUIREMENTS WHICH MAY AFFECT THE WORK IN ANOTHER WHICH MAY AFFECT THE WORK IN ANOTHER WHICH MAY AFFECT THE WORK IN ANOTHER MAY AFFECT THE WORK IN ANOTHER MAY AFFECT THE WORK IN ANOTHER AFFECT THE WORK IN ANOTHER AFFECT THE WORK IN ANOTHER THE WORK IN ANOTHER THE WORK IN ANOTHER WORK IN ANOTHER WORK IN ANOTHER IN ANOTHER IN ANOTHER ANOTHER ANOTHER DISCIPLINE AND COORDINATE WORK. 13. DIMENSIONS ARE FACE OF CONCRETE, FACE OF MASONRY, DIMENSIONS ARE FACE OF CONCRETE, FACE OF MASONRY, ARE FACE OF CONCRETE, FACE OF MASONRY, ARE FACE OF CONCRETE, FACE OF MASONRY, FACE OF CONCRETE, FACE OF MASONRY, FACE OF CONCRETE, FACE OF MASONRY, OF CONCRETE, FACE OF MASONRY, OF CONCRETE, FACE OF MASONRY, CONCRETE, FACE OF MASONRY, CONCRETE, FACE OF MASONRY, FACE OF MASONRY, FACE OF MASONRY, OF MASONRY, OF MASONRY, MASONRY, MASONRY, AND CENTER LINE OF ANY PARTITIONS UNLESS INDICATED CENTER LINE OF ANY PARTITIONS UNLESS INDICATED CENTER LINE OF ANY PARTITIONS UNLESS INDICATED LINE OF ANY PARTITIONS UNLESS INDICATED LINE OF ANY PARTITIONS UNLESS INDICATED OF ANY PARTITIONS UNLESS INDICATED OF ANY PARTITIONS UNLESS INDICATED ANY PARTITIONS UNLESS INDICATED ANY PARTITIONS UNLESS INDICATED PARTITIONS UNLESS INDICATED PARTITIONS UNLESS INDICATED UNLESS INDICATED UNLESS INDICATED INDICATED INDICATED OTHERWISE. 14. SEE ARCHITECTURAL DRAWINGS FOR TYPICAL MOUNTING SEE ARCHITECTURAL DRAWINGS FOR TYPICAL MOUNTING ARCHITECTURAL DRAWINGS FOR TYPICAL MOUNTING ARCHITECTURAL DRAWINGS FOR TYPICAL MOUNTING DRAWINGS FOR TYPICAL MOUNTING DRAWINGS FOR TYPICAL MOUNTING FOR TYPICAL MOUNTING FOR TYPICAL MOUNTING TYPICAL MOUNTING TYPICAL MOUNTING MOUNTING MOUNTING HEIGHTS OF PLUMBING FIXTURES, BATHROOM ACCESSORIES AND OF PLUMBING FIXTURES, BATHROOM ACCESSORIES AND OF PLUMBING FIXTURES, BATHROOM ACCESSORIES AND PLUMBING FIXTURES, BATHROOM ACCESSORIES AND PLUMBING FIXTURES, BATHROOM ACCESSORIES AND FIXTURES, BATHROOM ACCESSORIES AND FIXTURES, BATHROOM ACCESSORIES AND BATHROOM ACCESSORIES AND BATHROOM ACCESSORIES AND ACCESSORIES AND ACCESSORIES AND AND AND MISCELLANEOUS ITEMS AMONG OTHERS. 15. REFER TO DETAILS FOR ADDITIONAL DIMENSIONAL REFER TO DETAILS FOR ADDITIONAL DIMENSIONAL TO DETAILS FOR ADDITIONAL DIMENSIONAL TO DETAILS FOR ADDITIONAL DIMENSIONAL DETAILS FOR ADDITIONAL DIMENSIONAL DETAILS FOR ADDITIONAL DIMENSIONAL FOR ADDITIONAL DIMENSIONAL FOR ADDITIONAL DIMENSIONAL ADDITIONAL DIMENSIONAL ADDITIONAL DIMENSIONAL DIMENSIONAL DIMENSIONAL INFORMATION. 16. SEE ARCHITECTURAL DRAWINGS FOR FLOOR ELEVATIONS, SEE ARCHITECTURAL DRAWINGS FOR FLOOR ELEVATIONS, ARCHITECTURAL DRAWINGS FOR FLOOR ELEVATIONS, ARCHITECTURAL DRAWINGS FOR FLOOR ELEVATIONS, DRAWINGS FOR FLOOR ELEVATIONS, DRAWINGS FOR FLOOR ELEVATIONS, FOR FLOOR ELEVATIONS, FOR FLOOR ELEVATIONS, FLOOR ELEVATIONS, FLOOR ELEVATIONS, ELEVATIONS, ELEVATIONS, FLOOR SLOPES AND THE LOCATION OF DEPRESSED FLOOR SLOPES AND THE LOCATION OF DEPRESSED FLOOR SLOPES AND THE LOCATION OF DEPRESSED FLOOR AND THE LOCATION OF DEPRESSED FLOOR AND THE LOCATION OF DEPRESSED FLOOR THE LOCATION OF DEPRESSED FLOOR THE LOCATION OF DEPRESSED FLOOR LOCATION OF DEPRESSED FLOOR LOCATION OF DEPRESSED FLOOR OF DEPRESSED FLOOR OF DEPRESSED FLOOR DEPRESSED FLOOR DEPRESSED FLOOR FLOOR FLOOR AREAS. 17. ELEVATIONS INDICATED ON THE GENERAL, ARCHITECTURAL, ELEVATIONS INDICATED ON THE GENERAL, ARCHITECTURAL, INDICATED ON THE GENERAL, ARCHITECTURAL, INDICATED ON THE GENERAL, ARCHITECTURAL, ON THE GENERAL, ARCHITECTURAL, ON THE GENERAL, ARCHITECTURAL, THE GENERAL, ARCHITECTURAL, THE GENERAL, ARCHITECTURAL, GENERAL, ARCHITECTURAL, GENERAL, ARCHITECTURAL, ARCHITECTURAL, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND MECHANICAL, ELECTRICAL, FIRE PROTECTION AND MECHANICAL, ELECTRICAL, FIRE PROTECTION AND ELECTRICAL, FIRE PROTECTION AND ELECTRICAL, FIRE PROTECTION AND FIRE PROTECTION AND FIRE PROTECTION AND PROTECTION AND PROTECTION AND AND AND PLUMBING DRAWINGS AMONG OTHERS ARE BASED ON AN DRAWINGS AMONG OTHERS ARE BASED ON AN DRAWINGS AMONG OTHERS ARE BASED ON AN AMONG OTHERS ARE BASED ON AN AMONG OTHERS ARE BASED ON AN OTHERS ARE BASED ON AN OTHERS ARE BASED ON AN ARE BASED ON AN ARE BASED ON AN BASED ON AN BASED ON AN ON AN ON AN AN AN ASSIGNED REFERENCE ELEVATION OF THE CURRENT FINISH REFERENCE ELEVATION OF THE CURRENT FINISH REFERENCE ELEVATION OF THE CURRENT FINISH ELEVATION OF THE CURRENT FINISH ELEVATION OF THE CURRENT FINISH OF THE CURRENT FINISH OF THE CURRENT FINISH THE CURRENT FINISH THE CURRENT FINISH CURRENT FINISH CURRENT FINISH FINISH FINISH FLOOR ELEVATION. THE ACTUAL FIRST FLOOR ELEVATIONS ARE ELEVATION. THE ACTUAL FIRST FLOOR ELEVATIONS ARE ELEVATION. THE ACTUAL FIRST FLOOR ELEVATIONS ARE THE ACTUAL FIRST FLOOR ELEVATIONS ARE THE ACTUAL FIRST FLOOR ELEVATIONS ARE ACTUAL FIRST FLOOR ELEVATIONS ARE ACTUAL FIRST FLOOR ELEVATIONS ARE FIRST FLOOR ELEVATIONS ARE FIRST FLOOR ELEVATIONS ARE FLOOR ELEVATIONS ARE FLOOR ELEVATIONS ARE ELEVATIONS ARE ELEVATIONS ARE ARE ARE BASED ON THE DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, ON THE DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, ON THE DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, THE DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, THE DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, DATUM SHOWN ON THE TOPOGRAPHIC AS-BUILT, SHOWN ON THE TOPOGRAPHIC AS-BUILT, SHOWN ON THE TOPOGRAPHIC AS-BUILT, ON THE TOPOGRAPHIC AS-BUILT, ON THE TOPOGRAPHIC AS-BUILT, THE TOPOGRAPHIC AS-BUILT, THE TOPOGRAPHIC AS-BUILT, TOPOGRAPHIC AS-BUILT, TOPOGRAPHIC AS-BUILT, AS-BUILT, AS-BUILT, EXISTING GRADING PLAN AND/OR THE PROPOSED GRADING PLAN GRADING PLAN AND/OR THE PROPOSED GRADING PLAN GRADING PLAN AND/OR THE PROPOSED GRADING PLAN PLAN AND/OR THE PROPOSED GRADING PLAN PLAN AND/OR THE PROPOSED GRADING PLAN AND/OR THE PROPOSED GRADING PLAN AND/OR THE PROPOSED GRADING PLAN THE PROPOSED GRADING PLAN THE PROPOSED GRADING PLAN PROPOSED GRADING PLAN PROPOSED GRADING PLAN GRADING PLAN GRADING PLAN PLAN PLAN SHEETS. 18. PRINCIPAL OPENINGS IN THE STRUCTURE ARE SHOWN ON PRINCIPAL OPENINGS IN THE STRUCTURE ARE SHOWN ON OPENINGS IN THE STRUCTURE ARE SHOWN ON OPENINGS IN THE STRUCTURE ARE SHOWN ON IN THE STRUCTURE ARE SHOWN ON IN THE STRUCTURE ARE SHOWN ON THE STRUCTURE ARE SHOWN ON THE STRUCTURE ARE SHOWN ON STRUCTURE ARE SHOWN ON STRUCTURE ARE SHOWN ON ARE SHOWN ON ARE SHOWN ON SHOWN ON SHOWN ON ON ON THESE DRAWINGS. THE GENERAL CONTRACTOR SHALL EXAMINE DRAWINGS. THE GENERAL CONTRACTOR SHALL EXAMINE DRAWINGS. THE GENERAL CONTRACTOR SHALL EXAMINE THE GENERAL CONTRACTOR SHALL EXAMINE THE GENERAL CONTRACTOR SHALL EXAMINE GENERAL CONTRACTOR SHALL EXAMINE GENERAL CONTRACTOR SHALL EXAMINE CONTRACTOR SHALL EXAMINE CONTRACTOR SHALL EXAMINE SHALL EXAMINE SHALL EXAMINE EXAMINE EXAMINE THE ARCHITECTURAL, MECHANICAL AND PLUMBING DRAWINGS FOR ARCHITECTURAL, MECHANICAL AND PLUMBING DRAWINGS FOR ARCHITECTURAL, MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL AND PLUMBING DRAWINGS FOR AND PLUMBING DRAWINGS FOR AND PLUMBING DRAWINGS FOR PLUMBING DRAWINGS FOR PLUMBING DRAWINGS FOR DRAWINGS FOR DRAWINGS FOR FOR FOR REQUIRED OPENINGS AS THEY SHALL BE PROVIDED FOR OPENINGS AS THEY SHALL BE PROVIDED FOR OPENINGS AS THEY SHALL BE PROVIDED FOR AS THEY SHALL BE PROVIDED FOR AS THEY SHALL BE PROVIDED FOR THEY SHALL BE PROVIDED FOR THEY SHALL BE PROVIDED FOR SHALL BE PROVIDED FOR SHALL BE PROVIDED FOR BE PROVIDED FOR BE PROVIDED FOR PROVIDED FOR PROVIDED FOR FOR FOR WHETHER SHOWN ON THESE DRAWINGS OR NOT. GENERAL SHOWN ON THESE DRAWINGS OR NOT. GENERAL SHOWN ON THESE DRAWINGS OR NOT. GENERAL ON THESE DRAWINGS OR NOT. GENERAL ON THESE DRAWINGS OR NOT. GENERAL THESE DRAWINGS OR NOT. GENERAL THESE DRAWINGS OR NOT. GENERAL DRAWINGS OR NOT. GENERAL DRAWINGS OR NOT. GENERAL OR NOT. GENERAL OR NOT. GENERAL NOT. GENERAL NOT. GENERAL GENERAL GENERAL CONTRACTOR SHALL VERIFY SIZE AND LOCATION OF ALL SHALL VERIFY SIZE AND LOCATION OF ALL SHALL VERIFY SIZE AND LOCATION OF ALL VERIFY SIZE AND LOCATION OF ALL VERIFY SIZE AND LOCATION OF ALL SIZE AND LOCATION OF ALL SIZE AND LOCATION OF ALL AND LOCATION OF ALL AND LOCATION OF ALL LOCATION OF ALL LOCATION OF ALL OF ALL OF ALL ALL ALL OPENINGS WITH ALL SUB-CONTRACTORS PRIOR TO WITH ALL SUB-CONTRACTORS PRIOR TO WITH ALL SUB-CONTRACTORS PRIOR TO ALL SUB-CONTRACTORS PRIOR TO ALL SUB-CONTRACTORS PRIOR TO SUB-CONTRACTORS PRIOR TO SUB-CONTRACTORS PRIOR TO PRIOR TO PRIOR TO TO TO CONSTRUCTION. 19. DOOR JAMBS SHALL BE LOCATED 6" FROM CORNER IN DOOR JAMBS SHALL BE LOCATED 6" FROM CORNER IN JAMBS SHALL BE LOCATED 6" FROM CORNER IN JAMBS SHALL BE LOCATED 6" FROM CORNER IN SHALL BE LOCATED 6" FROM CORNER IN SHALL BE LOCATED 6" FROM CORNER IN BE LOCATED 6" FROM CORNER IN BE LOCATED 6" FROM CORNER IN LOCATED 6" FROM CORNER IN LOCATED 6" FROM CORNER IN 6" FROM CORNER IN 6" FROM CORNER IN FROM CORNER IN FROM CORNER IN CORNER IN CORNER IN IN IN STUD PARTITIONS AND 8" FROM CORNER IN MASONRY PARTITIONS AND 8" FROM CORNER IN MASONRY PARTITIONS AND 8" FROM CORNER IN MASONRY AND 8" FROM CORNER IN MASONRY AND 8" FROM CORNER IN MASONRY 8" FROM CORNER IN MASONRY 8" FROM CORNER IN MASONRY FROM CORNER IN MASONRY FROM CORNER IN MASONRY CORNER IN MASONRY CORNER IN MASONRY IN MASONRY IN MASONRY MASONRY MASONRY PARTITIONS UNLESS INDICATED OTHERWISE. 20. PROVIDE BLOCKING IN WALLS AS NECESSARY WHERE PROVIDE BLOCKING IN WALLS AS NECESSARY WHERE BLOCKING IN WALLS AS NECESSARY WHERE BLOCKING IN WALLS AS NECESSARY WHERE IN WALLS AS NECESSARY WHERE IN WALLS AS NECESSARY WHERE WALLS AS NECESSARY WHERE WALLS AS NECESSARY WHERE AS NECESSARY WHERE AS NECESSARY WHERE NECESSARY WHERE NECESSARY WHERE WHERE WHERE CASEWORK, SHELVES, HANDRAILS AND MISCELLANEOUS SHELVES, HANDRAILS AND MISCELLANEOUS SHELVES, HANDRAILS AND MISCELLANEOUS HANDRAILS AND MISCELLANEOUS HANDRAILS AND MISCELLANEOUS AND MISCELLANEOUS AND MISCELLANEOUS MISCELLANEOUS MISCELLANEOUS EQUIPMENT ARE LOCATED. 21. EACH TRADE TO PROVIDE SMOKE OR FIRE SEALANT AT EACH TRADE TO PROVIDE SMOKE OR FIRE SEALANT AT TRADE TO PROVIDE SMOKE OR FIRE SEALANT AT TRADE TO PROVIDE SMOKE OR FIRE SEALANT AT TO PROVIDE SMOKE OR FIRE SEALANT AT TO PROVIDE SMOKE OR FIRE SEALANT AT PROVIDE SMOKE OR FIRE SEALANT AT PROVIDE SMOKE OR FIRE SEALANT AT SMOKE OR FIRE SEALANT AT SMOKE OR FIRE SEALANT AT OR FIRE SEALANT AT OR FIRE SEALANT AT FIRE SEALANT AT FIRE SEALANT AT SEALANT AT SEALANT AT AT AT PENETRATIONS AS REQUIRED FOR WALL TYPE. ALL SEALANT, FIRE AS REQUIRED FOR WALL TYPE. ALL SEALANT, FIRE AS REQUIRED FOR WALL TYPE. ALL SEALANT, FIRE REQUIRED FOR WALL TYPE. ALL SEALANT, FIRE REQUIRED FOR WALL TYPE. ALL SEALANT, FIRE FOR WALL TYPE. ALL SEALANT, FIRE FOR WALL TYPE. ALL SEALANT, FIRE WALL TYPE. ALL SEALANT, FIRE WALL TYPE. ALL SEALANT, FIRE TYPE. ALL SEALANT, FIRE TYPE. ALL SEALANT, FIRE ALL SEALANT, FIRE ALL SEALANT, FIRE SEALANT, FIRE SEALANT, FIRE FIRE FIRE STOPPING AND SMOKE STOPPING ASSEMBLIES SHALL BE U.L. AND SMOKE STOPPING ASSEMBLIES SHALL BE U.L. AND SMOKE STOPPING ASSEMBLIES SHALL BE U.L. SMOKE STOPPING ASSEMBLIES SHALL BE U.L. SMOKE STOPPING ASSEMBLIES SHALL BE U.L. STOPPING ASSEMBLIES SHALL BE U.L. STOPPING ASSEMBLIES SHALL BE U.L. ASSEMBLIES SHALL BE U.L. ASSEMBLIES SHALL BE U.L. SHALL BE U.L. SHALL BE U.L. BE U.L. BE U.L. U.L. U.L. RATED. 22. DO NOT SCALE DIMENSIONS FROM DRAWINGS. THE DO NOT SCALE DIMENSIONS FROM DRAWINGS. THE NOT SCALE DIMENSIONS FROM DRAWINGS. THE NOT SCALE DIMENSIONS FROM DRAWINGS. THE SCALE DIMENSIONS FROM DRAWINGS. THE SCALE DIMENSIONS FROM DRAWINGS. THE DIMENSIONS FROM DRAWINGS. THE DIMENSIONS FROM DRAWINGS. THE FROM DRAWINGS. THE FROM DRAWINGS. THE DRAWINGS. THE DRAWINGS. THE THE THE CONTRACTOR SHALL REQUEST, FROM THE ARCHITECT/ ENGINEER SHALL REQUEST, FROM THE ARCHITECT/ ENGINEER SHALL REQUEST, FROM THE ARCHITECT/ ENGINEER REQUEST, FROM THE ARCHITECT/ ENGINEER REQUEST, FROM THE ARCHITECT/ ENGINEER FROM THE ARCHITECT/ ENGINEER FROM THE ARCHITECT/ ENGINEER THE ARCHITECT/ ENGINEER THE ARCHITECT/ ENGINEER ARCHITECT/ ENGINEER ARCHITECT/ ENGINEER ENGINEER ENGINEER NECESSARY DIMENSIONS NOT SHOWN ON THE DRAWINGS. 23. IF ANY BIDDER IS IN DOUBT AS TO THE INTENT OF THE IF ANY BIDDER IS IN DOUBT AS TO THE INTENT OF THE ANY BIDDER IS IN DOUBT AS TO THE INTENT OF THE ANY BIDDER IS IN DOUBT AS TO THE INTENT OF THE BIDDER IS IN DOUBT AS TO THE INTENT OF THE BIDDER IS IN DOUBT AS TO THE INTENT OF THE IS IN DOUBT AS TO THE INTENT OF THE IS IN DOUBT AS TO THE INTENT OF THE IN DOUBT AS TO THE INTENT OF THE IN DOUBT AS TO THE INTENT OF THE DOUBT AS TO THE INTENT OF THE DOUBT AS TO THE INTENT OF THE AS TO THE INTENT OF THE AS TO THE INTENT OF THE TO THE INTENT OF THE TO THE INTENT OF THE THE INTENT OF THE THE INTENT OF THE INTENT OF THE INTENT OF THE OF THE OF THE THE THE PLANS OR SPECIFICATIONS, THEY SHALL REQUEST AN OR SPECIFICATIONS, THEY SHALL REQUEST AN OR SPECIFICATIONS, THEY SHALL REQUEST AN SPECIFICATIONS, THEY SHALL REQUEST AN SPECIFICATIONS, THEY SHALL REQUEST AN THEY SHALL REQUEST AN THEY SHALL REQUEST AN SHALL REQUEST AN SHALL REQUEST AN REQUEST AN REQUEST AN AN AN INTERPRETATION FROM THE ARCHITECT/ENGINEER IN WRITING AT FROM THE ARCHITECT/ENGINEER IN WRITING AT FROM THE ARCHITECT/ENGINEER IN WRITING AT THE ARCHITECT/ENGINEER IN WRITING AT THE ARCHITECT/ENGINEER IN WRITING AT ARCHITECT/ENGINEER IN WRITING AT ARCHITECT/ENGINEER IN WRITING AT IN WRITING AT IN WRITING AT WRITING AT WRITING AT AT AT LEAST TEN (10) DAYS PRIOR TO THE BID DATE. 24. THE WORD "PROVIDE" MEANS "FURNISH AND INSTALL". THE WORD "PROVIDE" MEANS "FURNISH AND INSTALL". 25. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS THE STRUCTURAL DRAWINGS AND SPECIFICATIONS STRUCTURAL DRAWINGS AND SPECIFICATIONS STRUCTURAL DRAWINGS AND SPECIFICATIONS DRAWINGS AND SPECIFICATIONS DRAWINGS AND SPECIFICATIONS AND SPECIFICATIONS AND SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE, AND, EXCEPT WHERE THE FINISHED STRUCTURE, AND, EXCEPT WHERE THE FINISHED STRUCTURE, AND, EXCEPT WHERE FINISHED STRUCTURE, AND, EXCEPT WHERE FINISHED STRUCTURE, AND, EXCEPT WHERE STRUCTURE, AND, EXCEPT WHERE STRUCTURE, AND, EXCEPT WHERE AND, EXCEPT WHERE AND, EXCEPT WHERE EXCEPT WHERE EXCEPT WHERE WHERE WHERE SPECIFICALLY SHOWN, DO NOT INDICATE THE METHOD OR MEANS SHOWN, DO NOT INDICATE THE METHOD OR MEANS SHOWN, DO NOT INDICATE THE METHOD OR MEANS DO NOT INDICATE THE METHOD OR MEANS DO NOT INDICATE THE METHOD OR MEANS NOT INDICATE THE METHOD OR MEANS NOT INDICATE THE METHOD OR MEANS INDICATE THE METHOD OR MEANS INDICATE THE METHOD OR MEANS THE METHOD OR MEANS THE METHOD OR MEANS METHOD OR MEANS METHOD OR MEANS OR MEANS OR MEANS MEANS MEANS OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND THE CONTRACTOR SHALL SUPERVISE AND THE CONTRACTOR SHALL SUPERVISE AND CONTRACTOR SHALL SUPERVISE AND CONTRACTOR SHALL SUPERVISE AND SHALL SUPERVISE AND SHALL SUPERVISE AND SUPERVISE AND SUPERVISE AND AND AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR WORK AND SHALL BE SOLELY RESPONSIBLE FOR WORK AND SHALL BE SOLELY RESPONSIBLE FOR AND SHALL BE SOLELY RESPONSIBLE FOR AND SHALL BE SOLELY RESPONSIBLE FOR SHALL BE SOLELY RESPONSIBLE FOR SHALL BE SOLELY RESPONSIBLE FOR BE SOLELY RESPONSIBLE FOR BE SOLELY RESPONSIBLE FOR SOLELY RESPONSIBLE FOR SOLELY RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR ALL CONSTRUCTION MEANS, METHODS, PROCEDURES, CONSTRUCTION MEANS, METHODS, PROCEDURES, CONSTRUCTION MEANS, METHODS, PROCEDURES, MEANS, METHODS, PROCEDURES, MEANS, METHODS, PROCEDURES, METHODS, PROCEDURES, METHODS, PROCEDURES, PROCEDURES, PROCEDURES, TECHNIQUES, AND SEQUENCE. ALL APPLICABLE SAFETY AND SEQUENCE. ALL APPLICABLE SAFETY AND SEQUENCE. ALL APPLICABLE SAFETY SEQUENCE. ALL APPLICABLE SAFETY SEQUENCE. ALL APPLICABLE SAFETY ALL APPLICABLE SAFETY ALL APPLICABLE SAFETY APPLICABLE SAFETY APPLICABLE SAFETY SAFETY SAFETY REGULATIONS TO BE FOLLOWED STRICTLY. 26. THE STRUCTURE AS BEEN DESIGNED TO RESIST DESIGN THE STRUCTURE AS BEEN DESIGNED TO RESIST DESIGN STRUCTURE AS BEEN DESIGNED TO RESIST DESIGN STRUCTURE AS BEEN DESIGNED TO RESIST DESIGN AS BEEN DESIGNED TO RESIST DESIGN AS BEEN DESIGNED TO RESIST DESIGN BEEN DESIGNED TO RESIST DESIGN BEEN DESIGNED TO RESIST DESIGN DESIGNED TO RESIST DESIGN DESIGNED TO RESIST DESIGN TO RESIST DESIGN TO RESIST DESIGN RESIST DESIGN RESIST DESIGN DESIGN DESIGN LOADS ONLY AS A COMPLETED STRUCTURE. APPLICATIONS OF ONLY AS A COMPLETED STRUCTURE. APPLICATIONS OF ONLY AS A COMPLETED STRUCTURE. APPLICATIONS OF AS A COMPLETED STRUCTURE. APPLICATIONS OF AS A COMPLETED STRUCTURE. APPLICATIONS OF A COMPLETED STRUCTURE. APPLICATIONS OF A COMPLETED STRUCTURE. APPLICATIONS OF COMPLETED STRUCTURE. APPLICATIONS OF COMPLETED STRUCTURE. APPLICATIONS OF STRUCTURE. APPLICATIONS OF STRUCTURE. APPLICATIONS OF APPLICATIONS OF APPLICATIONS OF OF OF CONSTRUCTION LOADS TO THE PARTIALLY COMPLETED STRUCTURE LOADS TO THE PARTIALLY COMPLETED STRUCTURE LOADS TO THE PARTIALLY COMPLETED STRUCTURE TO THE PARTIALLY COMPLETED STRUCTURE TO THE PARTIALLY COMPLETED STRUCTURE THE PARTIALLY COMPLETED STRUCTURE THE PARTIALLY COMPLETED STRUCTURE PARTIALLY COMPLETED STRUCTURE PARTIALLY COMPLETED STRUCTURE COMPLETED STRUCTURE COMPLETED STRUCTURE STRUCTURE STRUCTURE SHALL BE CONSIDERED BY THE CONTRACTOR AND SO INCLUDED BE CONSIDERED BY THE CONTRACTOR AND SO INCLUDED BE CONSIDERED BY THE CONTRACTOR AND SO INCLUDED CONSIDERED BY THE CONTRACTOR AND SO INCLUDED CONSIDERED BY THE CONTRACTOR AND SO INCLUDED BY THE CONTRACTOR AND SO INCLUDED BY THE CONTRACTOR AND SO INCLUDED THE CONTRACTOR AND SO INCLUDED THE CONTRACTOR AND SO INCLUDED CONTRACTOR AND SO INCLUDED CONTRACTOR AND SO INCLUDED AND SO INCLUDED AND SO INCLUDED SO INCLUDED SO INCLUDED INCLUDED INCLUDED IN THE DESIGN OF SHORING, BRACING, FRAMEWORK, AND ANY THE DESIGN OF SHORING, BRACING, FRAMEWORK, AND ANY THE DESIGN OF SHORING, BRACING, FRAMEWORK, AND ANY DESIGN OF SHORING, BRACING, FRAMEWORK, AND ANY DESIGN OF SHORING, BRACING, FRAMEWORK, AND ANY OF SHORING, BRACING, FRAMEWORK, AND ANY OF SHORING, BRACING, FRAMEWORK, AND ANY SHORING, BRACING, FRAMEWORK, AND ANY SHORING, BRACING, FRAMEWORK, AND ANY BRACING, FRAMEWORK, AND ANY BRACING, FRAMEWORK, AND ANY FRAMEWORK, AND ANY FRAMEWORK, AND ANY AND ANY AND ANY ANY ANY OTHER SUPPORTING ELEMENTS PROVIDED FOR CONSTRUCTION OF SUPPORTING ELEMENTS PROVIDED FOR CONSTRUCTION OF SUPPORTING ELEMENTS PROVIDED FOR CONSTRUCTION OF ELEMENTS PROVIDED FOR CONSTRUCTION OF ELEMENTS PROVIDED FOR CONSTRUCTION OF PROVIDED FOR CONSTRUCTION OF PROVIDED FOR CONSTRUCTION OF FOR CONSTRUCTION OF FOR CONSTRUCTION OF CONSTRUCTION OF CONSTRUCTION OF OF OF THE STRUCTURE. DURING ERECTION AND UNTIL ALL PERMANENT STRUCTURE. DURING ERECTION AND UNTIL ALL PERMANENT STRUCTURE. DURING ERECTION AND UNTIL ALL PERMANENT DURING ERECTION AND UNTIL ALL PERMANENT DURING ERECTION AND UNTIL ALL PERMANENT ERECTION AND UNTIL ALL PERMANENT ERECTION AND UNTIL ALL PERMANENT AND UNTIL ALL PERMANENT AND UNTIL ALL PERMANENT UNTIL ALL PERMANENT UNTIL ALL PERMANENT ALL PERMANENT ALL PERMANENT PERMANENT PERMANENT CONNECTIONS ARE MADE, THE CONTRACTOR MUST PROVIDE ARE MADE, THE CONTRACTOR MUST PROVIDE ARE MADE, THE CONTRACTOR MUST PROVIDE MADE, THE CONTRACTOR MUST PROVIDE MADE, THE CONTRACTOR MUST PROVIDE THE CONTRACTOR MUST PROVIDE THE CONTRACTOR MUST PROVIDE CONTRACTOR MUST PROVIDE CONTRACTOR MUST PROVIDE MUST PROVIDE MUST PROVIDE PROVIDE PROVIDE TEMPORARY BRACING FOR THE STRUCTURE IN ALL DIRECTIONS. 27. SEE PLANS AND SPECIFICATIONS FOR ALL WORKS SEE PLANS AND SPECIFICATIONS FOR ALL WORKS PLANS AND SPECIFICATIONS FOR ALL WORKS PLANS AND SPECIFICATIONS FOR ALL WORKS AND SPECIFICATIONS FOR ALL WORKS AND SPECIFICATIONS FOR ALL WORKS SPECIFICATIONS FOR ALL WORKS SPECIFICATIONS FOR ALL WORKS FOR ALL WORKS FOR ALL WORKS ALL WORKS ALL WORKS WORKS WORKS REQUIRING INSPECTION, TESTING AND/OR CERTIFICATIONS. THE INSPECTION, TESTING AND/OR CERTIFICATIONS. THE INSPECTION, TESTING AND/OR CERTIFICATIONS. THE TESTING AND/OR CERTIFICATIONS. THE TESTING AND/OR CERTIFICATIONS. THE AND/OR CERTIFICATIONS. THE AND/OR CERTIFICATIONS. THE CERTIFICATIONS. THE CERTIFICATIONS. THE THE THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THOSE SHALL BE RESPONSIBLE TO COORDINATE THOSE SHALL BE RESPONSIBLE TO COORDINATE THOSE BE RESPONSIBLE TO COORDINATE THOSE BE RESPONSIBLE TO COORDINATE THOSE RESPONSIBLE TO COORDINATE THOSE RESPONSIBLE TO COORDINATE THOSE TO COORDINATE THOSE TO COORDINATE THOSE COORDINATE THOSE COORDINATE THOSE THOSE THOSE WORKS. 28. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN SHALL BE RESPONSIBLE TO MAINTAIN SHALL BE RESPONSIBLE TO MAINTAIN BE RESPONSIBLE TO MAINTAIN BE RESPONSIBLE TO MAINTAIN RESPONSIBLE TO MAINTAIN RESPONSIBLE TO MAINTAIN TO MAINTAIN TO MAINTAIN MAINTAIN MAINTAIN CLEAN AT ALL TIME THE CONSTRUCTION SITE. THE CONTRACTOR AT ALL TIME THE CONSTRUCTION SITE. THE CONTRACTOR AT ALL TIME THE CONSTRUCTION SITE. THE CONTRACTOR ALL TIME THE CONSTRUCTION SITE. THE CONTRACTOR ALL TIME THE CONSTRUCTION SITE. THE CONTRACTOR TIME THE CONSTRUCTION SITE. THE CONTRACTOR TIME THE CONSTRUCTION SITE. THE CONTRACTOR THE CONSTRUCTION SITE. THE CONTRACTOR THE CONSTRUCTION SITE. THE CONTRACTOR CONSTRUCTION SITE. THE CONTRACTOR CONSTRUCTION SITE. THE CONTRACTOR SITE. THE CONTRACTOR SITE. THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR ALSO SHALL BE RESPONSIBLE OF REMOVE AND DISPOSE OUT SHALL BE RESPONSIBLE OF REMOVE AND DISPOSE OUT SHALL BE RESPONSIBLE OF REMOVE AND DISPOSE OUT BE RESPONSIBLE OF REMOVE AND DISPOSE OUT BE RESPONSIBLE OF REMOVE AND DISPOSE OUT RESPONSIBLE OF REMOVE AND DISPOSE OUT RESPONSIBLE OF REMOVE AND DISPOSE OUT OF REMOVE AND DISPOSE OUT OF REMOVE AND DISPOSE OUT REMOVE AND DISPOSE OUT REMOVE AND DISPOSE OUT AND DISPOSE OUT AND DISPOSE OUT DISPOSE OUT DISPOSE OUT OUT OUT OF THE PUERTO RICO ARMY NATIONAL GUARD PROPERTY ALL THE PUERTO RICO ARMY NATIONAL GUARD PROPERTY ALL THE PUERTO RICO ARMY NATIONAL GUARD PROPERTY ALL PUERTO RICO ARMY NATIONAL GUARD PROPERTY ALL PUERTO RICO ARMY NATIONAL GUARD PROPERTY ALL RICO ARMY NATIONAL GUARD PROPERTY ALL RICO ARMY NATIONAL GUARD PROPERTY ALL ARMY NATIONAL GUARD PROPERTY ALL ARMY NATIONAL GUARD PROPERTY ALL NATIONAL GUARD PROPERTY ALL NATIONAL GUARD PROPERTY ALL GUARD PROPERTY ALL GUARD PROPERTY ALL PROPERTY ALL PROPERTY ALL ALL ALL THE DEBRIS AND GARBAGE GENERATED BY THE CONSTRUCTION DEBRIS AND GARBAGE GENERATED BY THE CONSTRUCTION DEBRIS AND GARBAGE GENERATED BY THE CONSTRUCTION AND GARBAGE GENERATED BY THE CONSTRUCTION AND GARBAGE GENERATED BY THE CONSTRUCTION GARBAGE GENERATED BY THE CONSTRUCTION GARBAGE GENERATED BY THE CONSTRUCTION GENERATED BY THE CONSTRUCTION GENERATED BY THE CONSTRUCTION BY THE CONSTRUCTION BY THE CONSTRUCTION THE CONSTRUCTION THE CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS. 29. THE CONTRACTOR SHALL MADE ALL REASONABLE EFFORTS THE CONTRACTOR SHALL MADE ALL REASONABLE EFFORTS CONTRACTOR SHALL MADE ALL REASONABLE EFFORTS CONTRACTOR SHALL MADE ALL REASONABLE EFFORTS SHALL MADE ALL REASONABLE EFFORTS SHALL MADE ALL REASONABLE EFFORTS MADE ALL REASONABLE EFFORTS MADE ALL REASONABLE EFFORTS ALL REASONABLE EFFORTS ALL REASONABLE EFFORTS REASONABLE EFFORTS REASONABLE EFFORTS EFFORTS EFFORTS TO RECYCLE AND RECOVER CONSTRUCTION AND DEMOLITION RECYCLE AND RECOVER CONSTRUCTION AND DEMOLITION RECYCLE AND RECOVER CONSTRUCTION AND DEMOLITION AND RECOVER CONSTRUCTION AND DEMOLITION AND RECOVER CONSTRUCTION AND DEMOLITION RECOVER CONSTRUCTION AND DEMOLITION RECOVER CONSTRUCTION AND DEMOLITION CONSTRUCTION AND DEMOLITION CONSTRUCTION AND DEMOLITION AND DEMOLITION AND DEMOLITION DEMOLITION DEMOLITION WASTE FROM THE PROJECT. A MINIMUM OF 50% BY WEIGHT, OF FROM THE PROJECT. A MINIMUM OF 50% BY WEIGHT, OF FROM THE PROJECT. A MINIMUM OF 50% BY WEIGHT, OF THE PROJECT. A MINIMUM OF 50% BY WEIGHT, OF THE PROJECT. A MINIMUM OF 50% BY WEIGHT, OF PROJECT. A MINIMUM OF 50% BY WEIGHT, OF PROJECT. A MINIMUM OF 50% BY WEIGHT, OF A MINIMUM OF 50% BY WEIGHT, OF A MINIMUM OF 50% BY WEIGHT, OF MINIMUM OF 50% BY WEIGHT, OF MINIMUM OF 50% BY WEIGHT, OF OF 50% BY WEIGHT, OF OF 50% BY WEIGHT, OF 50% BY WEIGHT, OF 50% BY WEIGHT, OF BY WEIGHT, OF BY WEIGHT, OF WEIGHT, OF WEIGHT, OF OF OF TOTAL PROJECT SOLID WASTE SHALL BE DIVERTED FROM THE PROJECT SOLID WASTE SHALL BE DIVERTED FROM THE PROJECT SOLID WASTE SHALL BE DIVERTED FROM THE SOLID WASTE SHALL BE DIVERTED FROM THE SOLID WASTE SHALL BE DIVERTED FROM THE WASTE SHALL BE DIVERTED FROM THE WASTE SHALL BE DIVERTED FROM THE SHALL BE DIVERTED FROM THE SHALL BE DIVERTED FROM THE BE DIVERTED FROM THE BE DIVERTED FROM THE DIVERTED FROM THE DIVERTED FROM THE FROM THE FROM THE THE THE LANDFILL IN ACCORDANCE WITH THE EXECUTIVE ORDER 13423 IN ACCORDANCE WITH THE EXECUTIVE ORDER 13423 IN ACCORDANCE WITH THE EXECUTIVE ORDER 13423 ACCORDANCE WITH THE EXECUTIVE ORDER 13423 ACCORDANCE WITH THE EXECUTIVE ORDER 13423 WITH THE EXECUTIVE ORDER 13423 WITH THE EXECUTIVE ORDER 13423 THE EXECUTIVE ORDER 13423 THE EXECUTIVE ORDER 13423 EXECUTIVE ORDER 13423 EXECUTIVE ORDER 13423 ORDER 13423 ORDER 13423 13423 13423 "STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND FEDERAL ENVIRONMENTAL, ENERGY AND FEDERAL ENVIRONMENTAL, ENERGY AND ENVIRONMENTAL, ENERGY AND ENVIRONMENTAL, ENERGY AND ENERGY AND ENERGY AND AND AND TRANSPORTATION MANAGEMENT" JANUARY 24, 2007. 30. THE CONTRACTOR SHALL PROVIDE ON-SITE INSTRUCTIONS THE CONTRACTOR SHALL PROVIDE ON-SITE INSTRUCTIONS CONTRACTOR SHALL PROVIDE ON-SITE INSTRUCTIONS CONTRACTOR SHALL PROVIDE ON-SITE INSTRUCTIONS SHALL PROVIDE ON-SITE INSTRUCTIONS SHALL PROVIDE ON-SITE INSTRUCTIONS PROVIDE ON-SITE INSTRUCTIONS PROVIDE ON-SITE INSTRUCTIONS ON-SITE INSTRUCTIONS ON-SITE INSTRUCTIONS INSTRUCTIONS INSTRUCTIONS FOR SEPARATING, HANDLING, RECYCLING SALVAGE, REUSE AND SEPARATING, HANDLING, RECYCLING SALVAGE, REUSE AND SEPARATING, HANDLING, RECYCLING SALVAGE, REUSE AND HANDLING, RECYCLING SALVAGE, REUSE AND HANDLING, RECYCLING SALVAGE, REUSE AND RECYCLING SALVAGE, REUSE AND RECYCLING SALVAGE, REUSE AND SALVAGE, REUSE AND SALVAGE, REUSE AND REUSE AND REUSE AND AND AND RETURN METHODS TO BE USED BY ALL PARTIES AT THE METHODS TO BE USED BY ALL PARTIES AT THE METHODS TO BE USED BY ALL PARTIES AT THE TO BE USED BY ALL PARTIES AT THE TO BE USED BY ALL PARTIES AT THE BE USED BY ALL PARTIES AT THE BE USED BY ALL PARTIES AT THE USED BY ALL PARTIES AT THE USED BY ALL PARTIES AT THE BY ALL PARTIES AT THE BY ALL PARTIES AT THE ALL PARTIES AT THE ALL PARTIES AT THE PARTIES AT THE PARTIES AT THE AT THE AT THE THE THE APPROPRIATE STAGES OF THE PROJECT. RECORDS SHALL BE STAGES OF THE PROJECT. RECORDS SHALL BE STAGES OF THE PROJECT. RECORDS SHALL BE OF THE PROJECT. RECORDS SHALL BE OF THE PROJECT. RECORDS SHALL BE THE PROJECT. RECORDS SHALL BE THE PROJECT. RECORDS SHALL BE PROJECT. RECORDS SHALL BE PROJECT. RECORDS SHALL BE RECORDS SHALL BE RECORDS SHALL BE SHALL BE SHALL BE BE BE MAINTAINED TO DOCUMENT THE QUANTITY OF WASTE DISPOSED TO DOCUMENT THE QUANTITY OF WASTE DISPOSED TO DOCUMENT THE QUANTITY OF WASTE DISPOSED DOCUMENT THE QUANTITY OF WASTE DISPOSED DOCUMENT THE QUANTITY OF WASTE DISPOSED THE QUANTITY OF WASTE DISPOSED THE QUANTITY OF WASTE DISPOSED QUANTITY OF WASTE DISPOSED QUANTITY OF WASTE DISPOSED OF WASTE DISPOSED OF WASTE DISPOSED WASTE DISPOSED WASTE DISPOSED DISPOSED DISPOSED OF BY LANDFILL OR INCINERATION. THE CONTRACTOR SHALL BY LANDFILL OR INCINERATION. THE CONTRACTOR SHALL BY LANDFILL OR INCINERATION. THE CONTRACTOR SHALL LANDFILL OR INCINERATION. THE CONTRACTOR SHALL LANDFILL OR INCINERATION. THE CONTRACTOR SHALL OR INCINERATION. THE CONTRACTOR SHALL OR INCINERATION. THE CONTRACTOR SHALL INCINERATION. THE CONTRACTOR SHALL INCINERATION. THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL SUBMIT THIS REPORT AND THE DISPOSAL MANIFESTO OF ALL THIS REPORT AND THE DISPOSAL MANIFESTO OF ALL THIS REPORT AND THE DISPOSAL MANIFESTO OF ALL REPORT AND THE DISPOSAL MANIFESTO OF ALL REPORT AND THE DISPOSAL MANIFESTO OF ALL AND THE DISPOSAL MANIFESTO OF ALL AND THE DISPOSAL MANIFESTO OF ALL THE DISPOSAL MANIFESTO OF ALL THE DISPOSAL MANIFESTO OF ALL DISPOSAL MANIFESTO OF ALL DISPOSAL MANIFESTO OF ALL MANIFESTO OF ALL MANIFESTO OF ALL OF ALL OF ALL ALL ALL NON-HAZARDOUS CONSTRUCTION AND DEMOLITION WASTE CONSTRUCTION AND DEMOLITION WASTE CONSTRUCTION AND DEMOLITION WASTE AND DEMOLITION WASTE AND DEMOLITION WASTE DEMOLITION WASTE DEMOLITION WASTE WASTE WASTE GENERATION. 31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING, CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING, CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING, SHALL BE RESPONSIBLE FOR SUBMITTING, SHALL BE RESPONSIBLE FOR SUBMITTING, BE RESPONSIBLE FOR SUBMITTING, BE RESPONSIBLE FOR SUBMITTING, RESPONSIBLE FOR SUBMITTING, RESPONSIBLE FOR SUBMITTING, FOR SUBMITTING, FOR SUBMITTING, SUBMITTING, SUBMITTING, FOLLOW UP AND OBTAINING ALL APPLICABLE PERMITS (FOR UP AND OBTAINING ALL APPLICABLE PERMITS (FOR UP AND OBTAINING ALL APPLICABLE PERMITS (FOR AND OBTAINING ALL APPLICABLE PERMITS (FOR AND OBTAINING ALL APPLICABLE PERMITS (FOR OBTAINING ALL APPLICABLE PERMITS (FOR OBTAINING ALL APPLICABLE PERMITS (FOR ALL APPLICABLE PERMITS (FOR ALL APPLICABLE PERMITS (FOR APPLICABLE PERMITS (FOR APPLICABLE PERMITS (FOR PERMITS (FOR PERMITS (FOR (FOR (FOR EXAMPLE BUILDING, CONSTRUCTION AND ENVIRONMENTAL AMONG BUILDING, CONSTRUCTION AND ENVIRONMENTAL AMONG BUILDING, CONSTRUCTION AND ENVIRONMENTAL AMONG CONSTRUCTION AND ENVIRONMENTAL AMONG CONSTRUCTION AND ENVIRONMENTAL AMONG AND ENVIRONMENTAL AMONG AND ENVIRONMENTAL AMONG ENVIRONMENTAL AMONG ENVIRONMENTAL AMONG AMONG AMONG OTHERS) FOR THE REALIZATION OF THE PROJECT AS PER JOINT FOR THE REALIZATION OF THE PROJECT AS PER JOINT FOR THE REALIZATION OF THE PROJECT AS PER JOINT THE REALIZATION OF THE PROJECT AS PER JOINT THE REALIZATION OF THE PROJECT AS PER JOINT REALIZATION OF THE PROJECT AS PER JOINT REALIZATION OF THE PROJECT AS PER JOINT OF THE PROJECT AS PER JOINT OF THE PROJECT AS PER JOINT THE PROJECT AS PER JOINT THE PROJECT AS PER JOINT PROJECT AS PER JOINT PROJECT AS PER JOINT AS PER JOINT AS PER JOINT PER JOINT PER JOINT JOINT JOINT PERMIT REGULATIONS FOR BUILDING PERMITS AND LAND USE REGULATIONS FOR BUILDING PERMITS AND LAND USE REGULATIONS FOR BUILDING PERMITS AND LAND USE FOR BUILDING PERMITS AND LAND USE FOR BUILDING PERMITS AND LAND USE BUILDING PERMITS AND LAND USE BUILDING PERMITS AND LAND USE PERMITS AND LAND USE PERMITS AND LAND USE AND LAND USE AND LAND USE LAND USE LAND USE USE USE ADOPTED BY THE PERMIT MANAGEMENT OFFICE (OGPE IN BY THE PERMIT MANAGEMENT OFFICE (OGPE IN BY THE PERMIT MANAGEMENT OFFICE (OGPE IN THE PERMIT MANAGEMENT OFFICE (OGPE IN THE PERMIT MANAGEMENT OFFICE (OGPE IN PERMIT MANAGEMENT OFFICE (OGPE IN PERMIT MANAGEMENT OFFICE (OGPE IN MANAGEMENT OFFICE (OGPE IN MANAGEMENT OFFICE (OGPE IN OFFICE (OGPE IN OFFICE (OGPE IN (OGPE IN (OGPE IN IN IN SPANISH) UNDER LAW 161 AND FOR ANY AUTONOMOUS UNDER LAW 161 AND FOR ANY AUTONOMOUS UNDER LAW 161 AND FOR ANY AUTONOMOUS LAW 161 AND FOR ANY AUTONOMOUS LAW 161 AND FOR ANY AUTONOMOUS 161 AND FOR ANY AUTONOMOUS 161 AND FOR ANY AUTONOMOUS AND FOR ANY AUTONOMOUS AND FOR ANY AUTONOMOUS FOR ANY AUTONOMOUS FOR ANY AUTONOMOUS ANY AUTONOMOUS ANY AUTONOMOUS AUTONOMOUS AUTONOMOUS MUNICIPALITY OF THE COMMONWEALTH OF PUERTO RICO. OF THE COMMONWEALTH OF PUERTO RICO. OF THE COMMONWEALTH OF PUERTO RICO. THE COMMONWEALTH OF PUERTO RICO. THE COMMONWEALTH OF PUERTO RICO. COMMONWEALTH OF PUERTO RICO. COMMONWEALTH OF PUERTO RICO. OF PUERTO RICO. OF PUERTO RICO. PUERTO RICO. PUERTO RICO. RICO. RICO. INCLUDING BUT NOT LIMITED TO THE FOLLOWING: CONSTRUCTION PERMIT, DEMOLITION PERMIT, GENERAL CONSOLIDATED PERMIT, ELECTRICAL GENERATOR PERMIT, FORMAL EARTH CRUST EXTRACTION PERMIT, SIMPLE EARTH CRUST EXTRACTION PERMIT AND/OR SIGN INSTALLATION PERMITS AMONG OTHERS. 32. IN ALL CORRESPONDENT AREAS, EXAMPLE FOR DEMOLITION, NEW CONSTRUCTION OR INSTALLATION OF DOORS AND WINDOWS, ALTHOUGH NOT LIMITED TO THESE WORKS, THE CONTRACTOR WILL BE RESPONSIBLE FOR PATCHING AND REPAIRING WITH PLASTER FINISH FOR MATCH WITH EXISTING WALL.
AutoCAD SHX Text The project consists in the refurbishing and repurposing of Bldg. 1026 and Bldg. 1027, Controlled Humidity Warehouse, Installation, with 15,000 each, amounting to 30,000 SF, to fabricate…