TE 5 Site Pictures - Utility Pole 3-Phase Bldg. 1026.pdf
PDF 2 MB Posted
- Attached to
- PRNG - MATES Facilities Repairs and Alterations Federal contract opportunity
- Solicitation number
- W912LR21B0001
- Issued by
- Department of the Army National Guard
About this file
This document includes a federal contract opportunity solicitation and supporting site pictures documentation. The solicitation from the Department of the Army National Guard seeks a contractor to provide all personnel, equipment, tools, materials, supervision and quality control to perform construction services for temporary administration buildings and maintenance bays in Buildings 1026, 1027 and 1028 at MATES facilities. Specifically, the contractor will repair and alter the facilities according to the attached scope of work documentation. The site pictures documentation provides measurements and details of Utility Pole 3-Phase Building 1026 to support the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MATES Plans 10 Sep 2021.pdf | ||
| MATES Government Responses 10 Sep 2021.pdf | ||
| Mates Temp Offices Plans 27AUG21_Rev3.pdf | ||
| Davis Bacon Act 2021.pdf | ||
| W912LR21B0001 MATES REPAIRS AND ALTERATIONS.pdf | ||
| TE 4 Site Pictures - Maintenance Shop.pdf | ||
| SOW Mates Temp Facilities (Ver 22June2021.pdf | ||
| TE 3 Site Pictures - Electronics Shop.pdf | ||
| TE 1 Drawings.pdf | ||
| SF24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPORT
Project Name: Utility Pole and Panelboard Bldg 1026
Date : Apr 14, 2021
Inspected By :
Location : MATES
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
Title :
Apr 14, 2021
MATES
H = 4ft
W = 24 in
D = 8.5in
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
MATES
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
Distance from Pole to Fence towards road =: 17ft-9in Distance from Pole to Fence towards Bldg. = 4ft-8in Distance from Fence to Bldg = 60ft-6in Distance from Fence (Road Side) to Bldg = 26ft-6in
MATES
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
MATES
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
MATES
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
MATES
Distance from concrete post to wood post 15ft
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
MATES
For Jobs, www.EngineersWanted.com | For all Subcontracts, www.SubContractMe.com Site Reporter App developed by www.technocuz.com
File details come from the government source that posted it. Updated .