W912lR20B0017 OF 1419A Abstract of Offers Page 3 of 3.pdf
PDF 567 KB Posted
- Attached to
- Camp Santiago Sanitary Lift Station
- Solicitation number
- W912LR20B0017
- Issued by
-
Department of the Army National Guard
About this file
This federal contract opportunity solicitation seeks competitive bids for the Camp Santiago Sanitary Lift Station project. The Puerto Rico Army National Guard intends to issue an invitation for bid to award a single firm fixed-price contract to construct a new pit entrance channel strainer, stormwater catch basins, drainage lines, garbage station, perimeter fence, slabs and sidewalks, and rehabilitate the existing lift pump station and asphalt at Fort Allen Training Center in Juana Diaz, Puerto Rico. The project magnitude is between $250,000 and $500,000, with a performance period of 365 calendar days. The North American Industry Classification System code for this work is 238220. This opportunity is set aside 100% for small businesses. Bids are due by 10:00 AM on September 10, 2020. Price is the evaluation factor and award will be made without discussions to the lowest priced technically acceptable offeror.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
2. PROJECT TITLE
NO.:
NO.:
NO.:
NO.:
A. OFFEROR
A. OFFEROR
A. OFFEROR
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
A. ITEM NO.
B. ESTIMATED QUANTITY
C. UNIT
D. UNIT PRICE
E. ESTIMATED AMOUNT
E. ESTIMATED AMOUNT
D. UNIT PRICE
E. ESTIMATED AMOUNT
D. UNIT PRICE
E. ESTIMATED AMOUNT
D. UNIT PRICE
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable
OPTIONAL FORM 1419A (11-88)
8.2.1.3144.1.471865.466429
| 1. SOLICITATION NUMBER: W912LR20B0017 |
| 2. PROJECT TITLE: USPFO FOR PUERTO RICO |
BLDG 540 BORINQUENEER ST
FORT BUCHANAN PR 00934-4069
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): $100,000.00 |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): 20$ |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): NONE |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 3B. ESTIMATED QUANTITY: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 1000.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 1000.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 1.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: 1.00000000 |
| 3C. CONTRACT ITEMS. UNIT: Job |
| 3B. ESTIMATED QUANTITY: 1.00000000 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 2.00000000 |
| 3B. ESTIMATED QUANTITY: 1.00000000 |
| 3C. CONTRACT ITEMS. UNIT: Job |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 479980.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 479980.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 648060.41000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 648060.41000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 698712.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 698712.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| PAGE OF: 3.00000000 |
| PAGES: 3.00000000 |
| Offeror number. Column 1 of 4.: 7 |
| Offeror number. Column 2 of 4.: 8 |
| Offeror number. Column 3 of 4.: 9 |
| Offeror number. Column 4 of 4.: |
| A. OFFEROR: Reva Construction Corp. |
| A. OFFEROR: All Phase Solutions, LLC |
| A. OFFEROR: BlueIce Engineering LLC |
| A. OFFEROR: |