Questions_-Answers_TKWR182302_Aguadilla.pdf

PDF 191 KB Posted

Attached to
TKWR182302 Pt Boriquen Multiple Roofs Repairs Federal contract opportunity
Solicitation number
W912LR-18-R-5000
Issued by
Department of the Army Puerto Rico Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to TKWR182302 Pt Boriquen Multiple Roofs Repairs, newest first.
File Type Posted
Site_Visit_Sign_In_Sheet_060518.pdf PDF
4._QASP_TKWR182302.docx DOCX document
W912LR-18-R-5000.pdf PDF
3._SOW_-_TKWR182302-BOUND.PDF PDF
2._PWS_TKWR182302.rtf RTF text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.: TKWR182302

PROJECT NAME: REPAIR BUILDINGS 1, 3, 11, 13, 31, AND 32 ROOFS

A. Building 1

1. "Repair any areas where the pond can be on the roof deck." - Please indicate the area or Allowance.

A: 200SF

2. What are the square feet of the roof seal to be removed and fixed?

A: 4,200SF

3. Linear feet of the flashing to be removed and replaced in the one-story building.

A: 140 LF

4. Allowance for the work of repairing or replacing the roof deck.

A: 4,200SF

5. Estimator has a concern regarding the SOW received, since for Building No. 1 Roof, the existing taper and insulation board removal and replacement is not included, but they will result affected during the existing membrane removal process on the perimeter, and would need to be replaced. There is no method to remove the existing membrane without damaging the taper and insulation board, thus it should be part of the SOW (at least, we responsibly, must consider it in our proposal costs).

A: Yes, include all work you need to perform to give us a complete and usable product. If your method requires that work you need to include it.

B. Building 3

1. Details of the roof structure of the metal roof deck and the square feet to be arranged.

A: Replace with same type, had to be verified on site visit.

C. Building 11

Allowance for square feet of damaged seal to be fixed or indicate square footage.

A: All the roof has to be repaired and/or replace if needed A: Allowance for the low roof 25% A: Allowance for the high roof 50%

The specifications request “flashings” in Stainless Steel; Due to the lack of materials request if it can be exchanged for Aluminum .040”?

A: NO

The specifications requires a “wind resistance” of 160 miles per hours; the ANG has carried out some study of the structural wind resistance of buildings where insulation will be installed?

A: NO

The specifications mention a 20-year guarantee on one page, but on another page it says 30, which is the correct one?

A: 30 years as per specs.

The specification requires spray Polyurethane (R-Value of 20) and wind resistance of 160 mph; can it be changed by Rigid Insulation mechanically anchored to the metal deck?

A: NO

Will electronic signature be accepted on the main sheet of Bid?

A: YES