W912LR-18-B-5004-02 Solicitation Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| As_Builts.pdf | ||
| W912LR-18-B-5004-01.docx | DOCX document | |
| Site_visit_Questions_B12.docx | DOCX document | |
| BLDG_12_Drawings.pdf | ||
| BLDG_12_Floor_Plan_1.pdf | ||
| TUMR182106_ACM_in_Base_Bid.pdf | ||
| W912LR-18-B-5004-Conformed_Copy.docx | DOCX document | |
| W912lR-18-B-5004_Pre-Bid_Conference_Slides.pdf | ||
| Pre-Bid_scheduled_vendor_attendance_073118.xlsx | XLSX spreadsheet | |
| 4._QASP_TUMR182106.docx | DOCX document | |
| 2._PWS_TUMR182106.rtf | RTF text file | |
| 3._SOW_-_TUMR182106-BOUND-V2.pdf | ||
| W912LR-18-B-5004.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912LR18B5004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The description of performance 52.211-10 has been added.
The contractor period of performance end date has increased by 60 days from 120 days to 180 days.
The performance payment bonds calendar days has decreased by 20 from 30 to 10.
CLIN 0001
The CLIN description has changed from Bas Bid For Project Number TUMR182106 to Base Bid For Project Number TUMR182106.
SUBCLIN 000102 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
000102
Unit Price No. 1 Asbestos Containing Mat
FFP
CLIN 000102 - NEW - Unit Price No. 1 Asbestos Containing Material - Unit of Measure: Square Feet Pricing only beyond known quantity stated in the report only. Write "square feet" at the unit, state the Unit Price, Amount, and Net Amount.
FOB: Destination
NET AMT
SUBCLIN 000103 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
000103
Unit Price No. 2 Removal and Disposal Pb
FFP
CLIN 000103 - NEW - Unit Price No. 02 Removal and Disposal of Material Containing Lead Unit of Measure: Per 55 Gallon Drum Bidders shall assume no material containing Lead on the base bid. Write the "Per 55 Gallon Drum at the Unit, State your Unit Price, Amount, and Net Amount. Only for Removal and Disposal of material containing lead if found.
FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for SUBCLIN 000102:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| N/A |
| N/A |
| N/A |
| N/A |
The following Acceptance/Inspection Schedule was added for SUBCLIN 000103:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| N/A |
| N/A |
| N/A |
| N/A |
TABLE OF CONTENTS
The below Table of Contents has been added
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 1 |
| Performance Work Statement |
| 12 |
| 24-AUG-2018 |
| Attachment 2 |
| Statement of Work |
| 235 |
| 08-JAN-2018 |
| Attachment 3 |
| ACM in Base Bid |
| 4 |
| 16-AUG-2018 |
| Attachment 4 |
| PreBid Conference Slides |
| 27 |
| 06-AUG-2018 |
| Attachment 5 |
| Bid Bond |
| 2 |
| 31-AUG-2016 |
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after the date the Contractor receives the notice to proceed (NTP). The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes) image1.wmf