Site_visit_Questions_B12.docx
DOCX document 14 KB Posted
- Attached to
- TUMR182106 Repair Interior Bldg. 12
- Solicitation number
- W912LR-18-B-5004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| As_Builts.pdf | ||
| W912LR-18-B-5004-01.docx | DOCX document | |
| BLDG_12_Drawings.pdf | ||
| BLDG_12_Floor_Plan_1.pdf | ||
| W912LR-18-B-5004-02.docx | DOCX document | |
| TUMR182106_ACM_in_Base_Bid.pdf | ||
| W912LR-18-B-5004-Conformed_Copy.docx | DOCX document | |
| W912lR-18-B-5004_Pre-Bid_Conference_Slides.pdf | ||
| Pre-Bid_scheduled_vendor_attendance_073118.xlsx | XLSX spreadsheet | |
| 4._QASP_TUMR182106.docx | DOCX document | |
| 2._PWS_TUMR182106.rtf | RTF text file | |
| 3._SOW_-_TUMR182106-BOUND-V2.pdf | ||
| W912LR-18-B-5004.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. In the SOW, page 4, paragraph titled “Asbestos Abatement” and page 5, paragraph titled “LBP Abatement” is a statement that indicates the following: “Pre and Post abatement visual inspection must be scheduled with the COR office at least 24 hours in advance and any discrepancies found as a result shall be corrected by the contractor, at no additional cost to the government, before proceeding.”
Please explain and clarify this statement.
Specifications
1) The Specifications and Appendix B do not contain the same information for quote purposes. Please indicate which of the two predominates for quote effect? Response: Specification supersedes SOW Electrical
1) The number four point in the electrical section mentions perform testing of ceiling lights to insure all damage lights are replace. At the time of the visit the building had no power. Are presumed to be replaced all by a new one or what percent are understood to be damaged? Response: All
2) When talking about ceiling lights that we are referring to? Whole ceiling lamp or ceiling lights tube. Response: Lamp
3) If I have to change the entire ceiling lamp, what is the recommended voltage? Response: 120V verify on site with electrician Interior Walls
1) Point three mentions repair damaged electrical outlet and switches. I understand that it should be replaced since outlet and switches are not repaired. Or is it that when we refer to repair is the circuit? Response: Repair by replacing outlets
2) If it is replacing what percentage of oulet and switches can we consider it since at the time of the visit the building did not have power to inspect each one? Response: All Exterior Walls
1) At the end of point one mentions (replace locks with BEST) which brand for the government is the best one for estimated effect. Response: The brand is “BEST” with master key system of the base Handle type locks
2) Point six in the specification mentions (replaced damaged or not functioning exterior lighting with like kind.) Since at the time of the visit the building had no power what percent of the lamps are considered damaged? Response: All Bid Inquiry:
1. The documents posted on the FOB webpage do not contain the Asbestos Study that was mentioned today during the Pre-Bid Meeting. Please provide the full Asbestos Study. Response: provided by EMO
2. Please provide scaled drawings of the existing building Response: will be posted
3. The Scope of Work calls for “provide polished concrete floors (sealed) in all rooms where flooring is to be removed”. There are no spces provided for polished concrete. Please provide specification for polished concrete. Response: follow UFGS 09-66-13
4. Is it required to include a Builders Risk Insurance for this bid? Response: yes
| 1. | Scope of Work, page 5 ask Electrical works such as replace transformer, transfer switch, and main panel board with like kind. Please provide specs for these equipment’s. Response: Site visit requirement to get specs and model information from the equipment’s. |
| 2. | Scope of Work, page 5 ask Flooring works to abate the vinyl asbestos tile. Please provide environmental assessment and study for these materials present in the project. Response: provided by EMO |
| 3. | After removing VAT and carpet, except room 6, existing floor slab will have polished concrete finish? Please provide polished concrete procedure and specifications of materials to be used. Response: follow UFGS 09-66-13 |
| 4. | Existing base in carpet areas is wood base. Please confirm that wood base will be replaced or vinyl base will be used instead? Response: Yes use Vinyl Base |
| 5. | Interior painting states that LBP should be tested. LBP assessment is not available? Response: There is not assessment avilable |
| 6. | HVAC ask to abate all ACM ductwork. Please provide Asbestos environmental assessment. Response: provided by EMO |
| 7. | HVAC ask to replace 2 condensing units for split system with like kind. Please provide model. Response: Site visit requirement to get specs and model information from the equipment’s. |
| 8. | Is it possible to have temporary power from nearby or should we provide emergency generator to perform works until power is restored in the building? Response: Not possible provide generator for own power. |
| 9. | Does the building has water supply? Response: Yes it has water |
| 10. | Do we have to consider provide temporary restrooms? Response: yes |
| 11. | Do we have to consider provide inspection office for your use? Response: No |
| 12. | Is this project exempt of construction permit? Response: yes |
| 13. | Is it possible to have As builts for HVAC ductwork? Response we will post what is available |
| 14. | Is it possible to have As builts for Electrical Power Rooms? Response we will post what is available |
| 15. | Does this building have fire alarm connected to a main panel in the Base? Response: ye |
| 16. | Is the fire sprinkler system out of this quote? Response: Yes |
| 17. | Is it necessary to provide occupancy permit? Response: No |
| 18. | Do we have to consider Health Department and Fire Department Endorsements? Response: No |
| 19. | Section 26 56 00 Exterior Lighting, is part of the scope of work? Where and how many do we have to consider? Response: All |