Simulator_Upgrade_RFis_answered_6-10-19.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Simulator Upgrade Facility Federal contract opportunity
- Solicitation number
- W912LD19R5000
About this file
RFI Answers thru 6-10-19
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W90FYQ-10-D-0008_RIANG_Flight_Sim_MODS-_Bidder_Inquiries_-6-11_2019.xlsx | XLSX spreadsheet | |
| W912LD-19-R-5000-0003.docx | DOCX document | |
| W912LD-19-R-5000-0002.docx | DOCX document | |
| W912LD-19-R-5000_Simulator_Upgrade_RFP.docx | DOCX document | |
| TWLR129077a_RIANG_Flight_Sim_Mod-B-3_Final_Drawings.pdf | ||
| TWLR129077a_RIANG_Flight_Sim_Mod-B-3_Final_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Rhode Island Air National Guard | ||||||||||
| Flight Simulator MODS | 7-Jun-19 | |||||||||
| W90FYQ-10-D-0008 | ||||||||||
| Quonset ANG Base, North Kingstown, RI | ||||||||||
| BIDDER INQUIRIES | ||||||||||
| Item | Date Received | Bidder Name | Reference: Print / Page Number | Discipline | RFI | Assigned to | Evaluation | A/E Response | Date Returned to RIANG | |
| 1 | 3-Jun-19 | Maron | A-101 | Architectural | There is a note on A101 between column lines 4 and 5 stating "Add cell lockers". What is that note and is there a specification om what is desired? | FSB | FIO | Please disregard this note. | 6-Jun-19 | |
| 2 | 3-Jun-19 | Maron | Specs | Architectural / Interior Design | There are several spec sections that we cannot find any notes on the plans that pertain to them. They include Section 096519 Resilient Tile Flooring, Section 096816 Sheet Carpeting and 102600 Wall & Door protection. Do they exist? | FSB | FIO | Stated spec sections were included for use as required for the patch and repair of the existing floor finishes. Section 102600 was included for use with the corner guard reinstallation, Sheet Keynote 19 on Sheet A-101. | 6-Jun-19 | |
| 3 | 3-Jun-19 | Maron | A-101 | Architectural | Notes 1 and 6 on sheet A101 are very vague and it shouldn't be left up to the contractor to verify the quantity during the bidding stage as this would involve some destructive exploratory work. The A/E of record should either provide the quantities or some type of allowance be provided so all bidders are on the same even playing field. Please advise. | FSB | FIO | Notes 1 & 6 on sheet A-101 are to be omitted. | 6-Jun-19 | |
| 4 | 3-Jun-19 | Nutmeg | A-102 & A-103 | Architectural / Interior Design | Please advise of the ceiling/soffit height for the operable partition. | FSB | FIO | The gypsum soffit for the operable partiton is to be flush with the existing 10'-0" AFF ceiling as illustrated in Detail 9/A-103. | 6-Jun-19 | |
| 5 | 5-Jun-19 | inControl | Spec Section 230900 | Mechanical | In specification section #230900 (Instrumentation & Control for HVAC); 2.1 (Manufacturers) & 2.2 (HVAC Control System), pages #4 &5; both Andover Controls & Honeywell are listed as the manufacturers for this work. It appears this verbiage was “cut & paste” from the original spec in 2014. The original | |||||
| C130 Flight Simulator project was completed using Schneider Electric (formerly Andover Controls) Smartstruxture DDC controls which has since become the DDC base standard. Please confirm if Schneider Electric Smartstruxture DDC controls are to be used for this project. | FSB | FIO | The same controls shall be used as per the previous project. | 6-Jun-19 |