Simulator_Upgrade_RFis_answered_6-10-19.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Simulator Upgrade Facility Federal contract opportunity
Solicitation number
W912LD19R5000
Issued by
Department of the Army Rhode Island Army National Guard

About this file

RFI Answers thru 6-10-19

View the file

Other files for this federal contract opportunity

Other files attached to Simulator Upgrade Facility, newest first.
File Type Posted
W90FYQ-10-D-0008_RIANG_Flight_Sim_MODS-_Bidder_Inquiries_-6-11_2019.xlsx XLSX spreadsheet
W912LD-19-R-5000-0003.docx DOCX document
W912LD-19-R-5000-0002.docx DOCX document
W912LD-19-R-5000_Simulator_Upgrade_RFP.docx DOCX document
TWLR129077a_RIANG_Flight_Sim_Mod-B-3_Final_Drawings.pdf PDF
TWLR129077a_RIANG_Flight_Sim_Mod-B-3_Final_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Rhode Island Air National Guard
Flight Simulator MODS7-Jun-19
W90FYQ-10-D-0008
Quonset ANG Base, North Kingstown, RI
BIDDER INQUIRIES
ItemDate ReceivedBidder NameReference: Print / Page NumberDisciplineRFIAssigned toEvaluationA/E ResponseDate Returned to RIANG
13-Jun-19MaronA-101ArchitecturalThere is a note on A101 between column lines 4 and 5 stating "Add cell lockers". What is that note and is there a specification om what is desired?FSBFIOPlease disregard this note.6-Jun-19
23-Jun-19MaronSpecsArchitectural / Interior DesignThere are several spec sections that we cannot find any notes on the plans that pertain to them. They include Section 096519 Resilient Tile Flooring, Section 096816 Sheet Carpeting and 102600 Wall & Door protection. Do they exist?FSBFIOStated spec sections were included for use as required for the patch and repair of the existing floor finishes. Section 102600 was included for use with the corner guard reinstallation, Sheet Keynote 19 on Sheet A-101.6-Jun-19
33-Jun-19MaronA-101ArchitecturalNotes 1 and 6 on sheet A101 are very vague and it shouldn't be left up to the contractor to verify the quantity during the bidding stage as this would involve some destructive exploratory work. The A/E of record should either provide the quantities or some type of allowance be provided so all bidders are on the same even playing field. Please advise.FSBFIONotes 1 & 6 on sheet A-101 are to be omitted.6-Jun-19
43-Jun-19NutmegA-102 & A-103Architectural / Interior DesignPlease advise of the ceiling/soffit height for the operable partition.FSBFIOThe gypsum soffit for the operable partiton is to be flush with the existing 10'-0" AFF ceiling as illustrated in Detail 9/A-103.6-Jun-19
55-Jun-19inControlSpec Section 230900MechanicalIn specification section #230900 (Instrumentation & Control for HVAC); 2.1 (Manufacturers) & 2.2 (HVAC Control System), pages #4 &5; both Andover Controls & Honeywell are listed as the manufacturers for this work. It appears this verbiage was “cut & paste” from the original spec in 2014. The original
C130 Flight Simulator project was completed using Schneider Electric (formerly Andover Controls) Smartstruxture DDC controls which has since become the DDC base standard. Please confirm if Schneider Electric Smartstruxture DDC controls are to be used for this project.FSBFIOThe same controls shall be used as per the previous project.6-Jun-19