W912L8-20-B-00020001 Released MOD Copy.pdf
PDF 254 KB Posted
- Attached to
- Kenova Fence Installation Federal contract opportunity
- Solicitation number
- W912L8-20-B-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 003 Answered.pdf | ||
| RFI 3 Drawing-3.pdf | ||
| W912L8-20-B-00020001 Released.pdf | ||
| RFI 002 Answered.pdf | ||
| RFI 001 Answered.pdf | ||
| Drawings Kenova Fence .pdf | ||
| W912L8-20-B-0002 Released.pdf | ||
| Request For Information FORM.pdf | ||
| SOW Kenova Fence AFRC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011417902
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment allow s electronic or mail submission of Bids. Please NOTE if you choose one of these alternate methods of submitting your bid they must be received no later than 29 June 2020 at 10:00am EST. Please be aw are the government w ill not be held responsible if your mailed bids do not reach our office by the specified time and date (29 June 2020 at 10:00am EST). To avoid this potential issue, I w ould highly recommend emailing the bid, since this w ill have a date and time stamp on it and less likely to be delayed.
1. CONTRACT ID CODE PAGE OF PAGES
1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L820B0002
X 9B. DATED (SEE ITEM 11)
29-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2020
CODE
USPFO WV PURCHASING & CONTRACTING
50 ARMORY ROAD
BUCKHANNON WV 26201-8818
W912L8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912L820B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
BIDDING SCHEDULE
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: Work shall consist of furnishing all labor, equipment, materials and warranties and site survey to accomplish installation of new chain link fencing, one pedestrian gate, one access gate, one 15’ access gates and two 15’ motorized – remotely controlled rolling gate around the compound at 2194 Booth Road Kenova WV 25530.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) W912L8-20-B-0002, titled
Kenova Fence Installation.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for small business.
3. EVALUATION FOR AWARD. Reference DFARS 252.236-7007.
4. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
4.1. A pre-bid conference was conducted on 4 June 2020 at 12:00 EST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference was held at the Kenova AFRC, 2194 Booth Road, Kenova, WV 25530. The site visit was held following the conference.
4.2. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
4.3. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
4.4. A record of the conference shall be made and furnished to all prospective bidders via posting at http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
5. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
5.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer.
All questions must come through the Contracting Office. ng.wv.wvarng.list.uspfo-p-c-construction-a-e@mail.mil
Subject Line: Reference No. SOLICITATION W912L8-20-B-0002 Email: ng.wv.wvarng.list.uspfo-p-c-construction-a-e@mail.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:_____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: Please clearly state your question and use attachment 3 Request For Information (RFI).
4.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.2. All questions and requests for information (RFI) must be received NOT LATER THAN 10 DAYS prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN
THIS PROCESS.
4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.
However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov
4.4. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.5. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. Plans and specifications are locked on FBO and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on FBO. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
4.5.1. Amendments, if/when issued will be posted to https://www.fbo.gov/ for electronic downloading.
This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
6. BID SUBMISSION AND BID OPENING:
6.1. Hand carried bids must be received prior to bid opening. Mailed or emailed bids will be accepted, however if you choose to mail or email your bid they must be received no later than 29 June 2020 at 10:00am EST, to allow me time to prepare the abstract and print them off for reading at the actual bid opening, scheduled for 30 June 2020 at 12:00. Please be aware the government will not be held responsible if your mailed bids do not reach our office by the specified time and date (29 June 2020 at 10:00am EST). To avoid this potential issue, I would highly recommend emailing the bid, since this will have a date and time stamp on it and less likely to be delayed. Email bids to richard.l.osborne2.civ@mail.mil. To mail bids, please send to ATTN: Richard Osborne, Purchasing & Contracting, 50 Armory Road, Buckhannon, WV, 26201.
6.2. A bid repository is provided for hand carried bids and is located at CFMO, 1707 Coonskin Drive, Charleston, WV 25311. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they may be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
6.3. The bid opening will occur at CFMO, 1707 Coonskin Drive, Charleston, WV 25311 on Wednesday, 30
JUN 2020 at 12:00 PM EST. All interested offerors and their major subcontractors are encouraged to attend the bid opening. BE SURE YOUR BIDS ARE RECEIVED BEFORE THIS DATE AND TIME
6.3 When hand delivering your bid, please hand the bid to; Mr. Richard Osborne, MAJ Fernatt, CPT Marcum, or Mr. David Unrue.
7. WAGE DETERMINATION:
7.1. Construction Wage Rates are applicable to this project are General Decision Number:
WV20200048 06/12/2020 as shown in Section 00800.
8. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
9. CLAUSES:
9.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
10. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
11. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SECTION 00800
"General Decision Number: WV20200048 06/12/2020
Superseded General Decision Number: WV20190048
State: West Virginia
Construction Type: Building
County: Wayne County in West Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/28/2020 3 04/03/2020 4 04/24/2020 5 06/12/2020
ASBE0002-002 08/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 41.26 25.67
BOIL0667-005 03/01/2018
Rates Fringes
BOILERMAKER......................$ 39.38 23.77
BRWV0005-002 06/01/2018
Rates Fringes
BRICK POINTER/CAULKER/CLEANER....$ 29.65 24.68
BRICKLAYER.......................$ 29.65 24.68
BRWV0005-005 06/01/2018
Rates Fringes
MASON - STONE....................$ 29.65 24.68
BRWV0005-006 06/01/2018
Rates Fringes
TILE SETTER......................$ 29.65 24.68
BRWV0015-014 06/01/2018
Rates Fringes
TILE FINISHER....................$ 23.59 19.95
CARP0439-006 12/01/2019
Rates Fringes
CARPENTER (Including Drywall Hanging, Form Work and Floor Laying - Carpet, Hardwood, Resilient and Vinyl).............$ 28.53 24.44
* ELEC0317-003 06/01/2020
Rates Fringes
ELECTRICIAN......................$ 35.10 26.22
ENGI0132-010 12/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR:
GROUP 1.....................$ 39.56 19.20
GROUP 2.....................$ 39.21 19.20
GROUP 3.....................$ 38.21 19.20
GROUP 4.....................$ 27.71 19.20
GROUP 1: All Friction Cranes, Tower Cranes and all Cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with 30,000 pound line pull or more, Mechanics with tools with 3/4 inch drive and below
GROUP 2: Operating Cranes and Tower Cranes with a lifting capacity of 15 tons and over
GROUP 3: Backhoe, Bulldozer, Excavator, Forklift, Non-Farm Type Tractor, all other Cranes, all other Mechanics
GROUP 4: Bobcat/Skid Steer/Skid Loader, Farm Type Tractor, Loader, Roller
IRON0549-006 12/01/2018
Rates Fringes
IRONWORKER (Ornamental)..........$ 33.34 20.81
* IRON0769-009 06/01/2020
Rates Fringes
IRONWORKER (Reinforcing and Structural)
ZONE 1:.....................$ 32.75 26.34
ZONE 2:.....................$ 33.15 26.34
ZONE 3:.....................$ 34.75 26.34
ZONE 1: 0-10 miles from Union Hall ZONE 2: 10-50 miles from Union Hall ZONE 3: 50 miles & over from Union Hall
LABO0543-006 06/01/2017
Rates Fringes
LABORER..........................$ 25.41 16.75
LABORER CLASSIFICATIONS
Carpenter Tender, Common or General, Concrete Saw (Hand Held/Walk Behind), Concrete Worker, Demolition, Grade Checker, Jack Hammer, Landscape, Mason Tender-Brick, Mason Tender-Cement/Concrete, Mortar Mixer, Motorized Buggy Operator, Pipelayer, Scaffold Builder (Brick and Masonry), Skytrak Forklift Operator, Tamper (Hand Held), Water Boy, Wacker Roller Operator
PAIN0970-008 12/01/2019
Rates Fringes
PAINTER (Drywall Finishing/Taping; Brush, Roller and Spray)................$ 28.85 16.50
PAIN1195-002 12/01/2018
Rates Fringes
GLAZIER..........................$ 30.75 12.24
PLAS0926-006 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.63 21.26
PLASTERER........................$ 30.06 20.36
PLUM0083-004 07/01/2019
PIPEFITTER.......................$ 32.62 33.53
PLUM0565-004 07/01/2018
Rates Fringes
PLUMBER..........................$ 40.95 23.86
ROOF0034-003 05/01/2019
Rates Fringes
ROOFER...........................$ 29.00 13.71
SHEE0024-022 06/01/2015
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 27.71 23.18
TEAM0175-005 10/01/2019
Rates Fringes
Truck drivers:
GROUP 2.....................$ 29.30 17.81
GROUP 3.....................$ 29.45 17.81
TRUCK DRIVER CLASSIFICATIONS
GROUP 2 - Dump Truck (Up to 5 cu. yds.), Water Tank Truck (Straight)
GROUP 3 - Dump Truck (5 cu. yds. & over), Tractor Haul Truck, Water Tank Truck (Semi)
* UAVG-WV-0026 01/01/2019
LABORER (Power Tool Operator)....$ 23.10 16.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
File details come from the government source that posted it. Updated .