RFI 002 Answered.pdf
PDF 129 KB Posted
- Attached to
- Kenova Fence Installation Federal contract opportunity
- Solicitation number
- W912L8-20-B-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 3 Drawing-3.pdf | ||
| RFI 003 Answered.pdf | ||
| W912L8-20-B-00020001 Released MOD Copy.pdf | ||
| W912L8-20-B-00020001 Released.pdf | ||
| RFI 001 Answered.pdf | ||
| Request For Information FORM.pdf | ||
| SOW Kenova Fence AFRC.pdf | ||
| Drawings Kenova Fence .pdf | ||
| W912L8-20-B-0002 Released.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI
Date Question Answer
RFI #1 Q&A BELOW
1.
6/5/2020
Two types of fence arein the drawings, whichstyle should be used?
All fencing will have three strands of barbed wire on top of the fence either on out riggers or on top of or over all gates.
2. Two types of fence arein the drawings, whichstyle should be used?
The only other design of fence documented in the SOW/SPECS should only be used when constructing crash protection running to, around, and through the entry gate.
3.3.13 is construction plans for gate and an illustration of gate can be found on drawing three (3).
3.
RFI #2 Q&A BELOW
4.
6/15/2020 How will bedrock, rock, or obstructions be handled when drilling for the post footings?
Unclassified Excavation: Excavate to subgrade regardless of the character of the surface and subsurface conditions.
Excavated materials may include rock, soil materials and obstructions. No changes in the Contract Time or Contract Sum will be authorized for rock excavation and obstruction removal.
5.
6/15/2020
Has the location of the electrical hook-up been determined for the gate operator?
Locate in adjacent FMS shop. See attached site and electrical drawings 1 & 2.
6.
6/15/2020
Who is responsible for hooking up the operator to the existing access control system?
Please define "Operator". All control wiring to be ran to current access control system. WVARNG ESS Tech will make final connections.
7.
6/15/2020
Will the gov't. take care of the programming of the operator within their existing system?
WVARNG ESS Tech will program the ACS.
5/20/2020
SOLICITATION: W912L8-20-B-0002
JOB TITLE: Kenova Fence Installation Kenova, WV
Requests for Information - Questions and Answers
8.
9.
10.
11.
12.
RFI #2