RFI 002 Answered.pdf

PDF 129 KB Posted

Attached to
Kenova Fence Installation Federal contract opportunity
Solicitation number
W912L8-20-B-0002
Issued by
Department of the Army West Virginia Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Kenova Fence Installation, newest first.
File Type Posted
RFI 3 Drawing-3.pdf PDF
RFI 003 Answered.pdf PDF
W912L8-20-B-00020001 Released MOD Copy.pdf PDF
W912L8-20-B-00020001 Released.pdf PDF
RFI 001 Answered.pdf PDF
Request For Information FORM.pdf PDF
SOW Kenova Fence AFRC.pdf PDF
Drawings Kenova Fence .pdf PDF
W912L8-20-B-0002 Released.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI

Date Question Answer

RFI #1 Q&A BELOW

1.

6/5/2020

Two types of fence arein the drawings, whichstyle should be used?

All fencing will have three strands of barbed wire on top of the fence either on out riggers or on top of or over all gates.

2. Two types of fence arein the drawings, whichstyle should be used?

The only other design of fence documented in the SOW/SPECS should only be used when constructing crash protection running to, around, and through the entry gate.

3.3.13 is construction plans for gate and an illustration of gate can be found on drawing three (3).

3.

RFI #2 Q&A BELOW

4.

6/15/2020 How will bedrock, rock, or obstructions be handled when drilling for the post footings?

Unclassified Excavation: Excavate to subgrade regardless of the character of the surface and subsurface conditions.

Excavated materials may include rock, soil materials and obstructions. No changes in the Contract Time or Contract Sum will be authorized for rock excavation and obstruction removal.

5.

6/15/2020

Has the location of the electrical hook-up been determined for the gate operator?

Locate in adjacent FMS shop. See attached site and electrical drawings 1 & 2.

6.

6/15/2020

Who is responsible for hooking up the operator to the existing access control system?

Please define "Operator". All control wiring to be ran to current access control system. WVARNG ESS Tech will make final connections.

7.

6/15/2020

Will the gov't. take care of the programming of the operator within their existing system?

WVARNG ESS Tech will program the ACS.

5/20/2020

SOLICITATION: W912L8-20-B-0002

JOB TITLE: Kenova Fence Installation Kenova, WV

Requests for Information - Questions and Answers

8.

9.

10.

11.

12.

RFI #2