QA_12-14.pdf

PDF 343 KB Posted

Attached to
Auditorium technology upgrade Federal contract opportunity
Solicitation number
W912L7-18-Q-5017
Issued by
Department of the Army Tennessee Army National Guard

About this file

Question and Answers 12-14

View the file

Other files for this federal contract opportunity

Other files attached to Auditorium technology upgrade, newest first.
File Type Posted
QA_15-16.pdf PDF
Drawings_As-Built.pdf PDF
QA_1-11.pdf PDF
PWS-118ISRG-Group_Auditorium_.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912L7-18-Q-5017 Auditorium Upgrade Question and Answers 12-14

12. In the SOW it gives the aspect ratio of the wall as 19:9; should this be 16:9.

16:9 is the correct ratio

13. Is the height of 8’ an absolute maximum or could it be 9’ to match this aspect ratio?

9’ would be ok, prefer 8’ because we’re getting close to the ceiling and floor. However, video wall does not need to cover the entire space as defined by maximum area. The provided measurements were a frame of reference to work within. Depending on the size of screen, sight lines will need to be reviewed within the auditorium from existing seating.

14. Are drawings available of the auditorium?

Yes they are available for review on site. As-Builts will be posted on FBO.

File details come from the government source that posted it.