Construct_Sidewalk_RFI_Log.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Construct Sidewalks
Solicitation number
W912L6-17-B-0013
Issued by

About this file

Updated RFI Answers

View the file

Other files

File Type Posted
AFSOC.pdf PDF
Construct_Pedestrian_Sidewalk_AirGuard_57th_RFI_Log.xlsx XLSX spreadsheet
ANG_logo.pdf PDF
SOCOM.pdf PDF
Amendment_2.pdf PDF
Construct_Pedestrian_Sidewalk_AirGuard_57th_RFI_Log.xlsx XLSX spreadsheet
Construct_Sidewalk_RFI_Log.xlsx XLSX spreadsheet
W912L6-17-B-0013_Construct_Sidewalks__Mod_I.pdf PDF
Solicitation.pdf PDF
Drawings_-_1523_ANG_-_SIDEWALK_MEMORIAL_-_160628.pdf PDF
152003_WRANGB_COMBINED_specs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Pre-Bid RFI Log for Construct Sidewalk, YZEU152003

Date:RFI No.RFP Reference (Sect/Para/Page)QUESTIONGOVERNMENT RESPONSE
8/16/171Is this a lump sum bid or unit price?Lump Sum
8/16/172Sheet A-001 detail 02 shows a Blue Granite Tile that sets in 2" reveal as a option #1 there is no information on this IE. dimensions and thickness can you please Clarify?Blue Polished Granite, Construction Joints as shown are not required. Contractor to provide size and pattern as part of his submittal. Install as per MFG instructions
8/16/173If option #1 is not taken, what will be used to fill the reveal?Option #1 will be awarded. Option is to tracking funding streams.
8/16/174"fundraiser item shown in drawings ( including in base bid)" #1 Brick /5,000 sf. Are the pavers being supplied, contractor installed, and the engravings being done later by others. Or is this the contractor supply the brick paver, installing them and the engraving only will be done at a later date by others?Awaiting anwer from Rosie
8/16/175Option #1 calls for 12" Bronze Lettering and a 36" Diameter Bronze Plaque. Is There a specific supplier that the ANG generally uses for these items?Typically ARK Ramos is specified.
8/16/176Will water be supplied by the base for use?No, Water can be obtained from OKC Water from water hydrants with an OKC water meter
8/16/177Where will construction equipment be stored?Laydown Option is the SE corner of the parking lot near the memorial
8/16/178Will there be an area to waste spoils or will they need to be removed from the base?Spoils to be become property of the contractor. Concrete and Asphalt to be recyled if possible.
8/17/179There isnt a spec on the masonry. Can you provide?Full Specs have been upoladed on FBO.
8/17/1710Can you provide a detail and plan sheet on the Cable Barrier Fence as well as the swing gates that are in the specs?See detail 3 in referenced drawing
8/17/1711Are there Automated Barrier Arms on Air Guard drive, if so can you provide the specsThere are none on Air Guard Drive