Construct_Sidewalk_RFI_Log.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Construct Sidewalks
- Solicitation number
- W912L6-17-B-0013
About this file
Construct Sidewalk RFI Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AFSOC.pdf | ||
| Construct_Pedestrian_Sidewalk_AirGuard_57th_RFI_Log.xlsx | XLSX spreadsheet | |
| ANG_logo.pdf | ||
| SOCOM.pdf | ||
| Amendment_2.pdf | ||
| Construct_Pedestrian_Sidewalk_AirGuard_57th_RFI_Log.xlsx | XLSX spreadsheet | |
| Construct_Sidewalk_RFI_Log.xlsx | XLSX spreadsheet | |
| W912L6-17-B-0013_Construct_Sidewalks__Mod_I.pdf | ||
| Solicitation.pdf | ||
| Drawings_-_1523_ANG_-_SIDEWALK_MEMORIAL_-_160628.pdf | ||
| 152003_WRANGB_COMBINED_specs.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Pre-Bid RFI Log for Construct Sidewalk, YZEU152003
| Date: | RFI No. | RFP Reference (Sect/Para/Page) | QUESTION | GOVERNMENT RESPONSE |
| 8/16/17 | 1 | Is this a lump sum bid or unit price? | Lump Sum | |
| 8/16/17 | 2 | Sheet A-001 detail 02 shows a Blue Granite Tile that sets in 2" reveal as a option #1 there is no information on this IE. dimensions and thickness can you please Clarify? | Blue Polished Granite, Construction Joints as shown are not required. Contractor to provide size and pattern as part of his submittal. Install as per MFG instructions | |
| 8/16/17 | 3 | If option #1 is not taken, what will be used to fill the reveal? | Option #1 will be awarded. Option is to tracking funding streams. | |
| 8/16/17 | 4 | "fundraiser item shown in drawings ( including in base bid)" #1 Brick /5,000 sf. Are the pavers being supplied, contractor installed, and the engravings being done later by others. Or is this the contractor supply the brick paver, installing them and the engraving only will be done at a later date by others? | Awaiting anwer from Rosie | |
| 8/16/17 | 5 | Option #1 calls for 12" Bronze Lettering and a 36" Diameter Bronze Plaque. Is There a specific supplier that the ANG generally uses for these items? | Typically ARK Ramos is specified. | |
| 8/16/17 | 6 | Will water be supplied by the base for use? | No, Water can be obtained from OKC Water from water hydrants with an OKC water meter | |
| 8/16/17 | 7 | Where will construction equipment be stored? | Laydown Option is the SE corner of the parking lot near the memorial | |
| 8/16/17 | 8 | Will there be an area to waste spoils or will they need to be removed from the base? | Spoils to be become property of the contractor. Concrete and Asphalt to be recyled if possible. | |
| 8/17/17 | 9 | There isnt a spec on the masonry. Can you provide? | ||
| 8/17/17 | 10 | Can you provide a detail and plan sheet on the Cable Barrier Fence as well as the swing gates that are in the specs? | ||
| 8/17/17 | 11 | Are there Automated Barrier Arms on Air Guard drive, if so can you provide the specs |
Sheet2
Sheet3