W912L6-21-R-0007 PWS Bird Deterrent Devices and Installation (4Jun2021).pdf
PDF 159 KB Posted
- Attached to
- Bird Deterrent Devices and Installation Federal contract opportunity
- Solicitation number
- W912L621R0007
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52.212-1 Instruct to Offerors(Addendum1) -Bird Deterrent Device & Install.pdf | ||
| LE200-ASBUILT DRAWINGS.pdf | ||
| LE300-ASBUILT DRAWINGS.pdf | ||
| WD 2015-5315 Rev 13 dtd 06-01-2021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. January 2021
PERFORMANCE WORK STATEMENT (PWS)
FOR
Airport Bird Control System Services
1.0 General:
1.1 Scope: The Contractor shall provide all personnel, equipment, bird deterrent devices, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as
Government Furnished, to perform Airport Bird Control System Services, as defined in this
PWS.
1.1.1 Objectives: Installation of Quad Blaster QB-4 Devices
1.2 Background: Complete installation of Quad Blaster QB-4 ultrasonic bird control systems with strobes for two separate aircraft hangars: Hangar LE 200 (approximately 870,688 cubic feet) and Hangar LE 300 (approximately 436,960 cubic feet).
1.3 Period of Performance (PoP): To be determined at time of award.
1.4 General Information:
1.4.1 Place and Performance of Services: The Contractor shall provide services between the hours of _7:00 a.m. - _5:00 p.m. Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
Performance shall be at the Muldrow Army Heliport in Lexington, OK Building LE 200 and LE
300. The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the
Contractor’s employee’s installation driving privileges.
1.4.1.3 The Contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation.
Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All Contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The Contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance.
The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance under the contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The
Contractor shall not perform services on these days:
1.4.3.1 New Year’s Day: January 1st
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Independence Day: July 4th
1.4.3.6 Labor Day
1.4.3.7 Columbus Day
1.4.3.8 Veteran’s Day: November 11th
1.4.3.9 Thanksgiving Day
1.4.3.10 Christmas Day: December 25th
1.4.3 Quality Control (QC): N/A
1.4.4 Quality Assurance (QA): N/A
1.4.5 Installation Access and Security Requirements. Current, U.S. issued identification.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or Contractor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infrastructure
AR Army Regulation
AT/OPSEC Antiterrorism/Operational Security
BI Background Investigation
CM Contract Manager
COR Contracting Officer Representative
DA Department of the Army
DD254 Department of Defense Contract Security Classification Specification
DFARS Defense Federal Acquisition Regulation Supplement
DOD Department of Defense
FAR Federal Acquisition Regulation
GFP/M/E/S Government Furnished Property/Material/Equipment/Services
HQDA Headquarters, Department of the Army
HSPD Homeland Security Presidential Directive
IA Information Assurance
IS Information System(s)
KO Contracting Officer
NGB National Guard Bureau
OCI Organizational Conflict of Interest
PII Personally Identifiable Information
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
SCR Service Contract Reporting
SSN Social Security Number
TE Technical Exhibit
USD (I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): None.
3.1 Utilities: All utilities in the facility will be available for the Contractor’s use in the performance of the contract. The Contractor shall instruct its employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): Contractor will furnish all labor, supervision, personnel, equipment, bird deterrent devices, supplies, permits/licenses, insurance, and incidentals required to complete the installation of the bird deterrent devices, in accordance with this PWS and the terms and conditions of the contract.
4.1 General: Except for those items specifically stated to be Government-Furnished in
Paragraph 3.0, the Contractor shall furnish everything required to perform the purchase and installation services as indicated in Paragraph 1.1.
5.0 Requirements: The Contractor shall:
5.1 Complete installation of Quad Blaster QB-2 ultrasonic bird control systems for two separate aircraft hangars as mentioned in Paragraph 1.2
5.1.1 On site evaluation is available.
5.1.2 Complete installation as per manufacture specification.
5.1.3 Contractors shall provide warranty information for installed devices and provide in writing the workmanship guarantee starting the date the work is accepted by the Contracting Officer’s
Representative.
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement
Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The
General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication
(Chapter/Page)
Date of
Publication
Mandator y or
Advisory
Website
Federal Acquisition
Regulation https://www.acquisition.gov
/?q=browsefar
Defense Federal
Acquisition http://www.acq.osd.mil/dpa p/dars/dfarspgi/current/inde x.html or https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://www.fsd.gov/ https://www.acquisition.gov/?q=browsefar https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
Regulation
Supplement https://www.acquisition.gov
/dfars
Joint Travel
Regulation (JTR) https://www.defensetravel.d od.mil/site/travelreg.cfm
DoDM 1000.13-M-V1
DoD Identification
(ID) Cards
(Enclosure 2, paragraph 3.b)
01/23/2014
(Change 1:
07/28/2020) http://www.esd.whs.mil/Dir ectives/issuances/dodm
Federal Information
Processing Standards
(FIPS) Publication
201-2
Personal Identity
Verification (PIV) of
Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistp ubs/FIPS/NIST.FIPS.201-
2.pdf
DoDM 5200.2
Procedures for the
DoD Personnel
Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Di rectives/issuances/dodm/
DoDI 5200.46
DoD Investigative and
Adjudicative
Guidance for Issuing the Common Access
Card (CAC)
09/09/14
(Change 1:
05/04/2018) https://www.esd.whs.mil/Di rectives/issuances/dodi/
Homeland Security
Presidential Directive
(HSPD)-12
Policy for a Common
Identification Standard for Federal Employees and Contractors
08/27/2004 https://www.dhs.gov/homel and-security-presidential-directive-12
DoDI 5400.11
Department of
Defense Privacy and
Civil Liberties
Programs
01/29/2019 rectives/issuances/dodi/
DoD 5400.11-R
Department of
Defense Privacy
Program
05/14/2007 https://www.esd.whs.mil/Di rectives/issuances/dodm/ https://www.acquisition.gov/dfars https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/
DoDD 8140.01
Cyberspace
Workforce
Management
10/05/2020 rectives/issuances/dodd/
DoD 8570.01-M
Information Assurance
Workforce
Improvement Program
12/19/2005
(Change 4:
11/10/2015)
DoD 5220.22-M
National Industrial
Security Program
Operating Manual
(NISPOM)
02/28/2006
(Change 2:
05/18/2016)
Army Directive 2014-
Policy and
Implementation
Procedures for
Common Access Card
Credentialing and
Installation Access for
Uncleared Contractors
03/07/2014 https://armypubs.army.mil/P roductMaps/PubForm/Army
Dir.aspx
AR 25-2
Information
Assurance
04/04/2019 http://armypubs.army.mil/Pr oductMaps/PubForm/AR.as px
AR 530-1
Operations Security
09/26/2014 http://armypubs.army.mil/Pr oductMaps/PubForm/AR.as px
AR 525-13
Antiterrorism
12/09/2019 http://armypubs.army.mil/Pr oductMaps/PubForm/AR.as px
AR 381-12
Threat Awareness and
Reporting Program
(TARP)
(Section II, ¶ 2-4.b)
06/01/2016 http://armypubs.army.mil/Pr oductMaps/PubForm/AR.as px
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
DD 1172-2
Application for
Identification
Card/DEERS
Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/for ms/index.htm
I-9
Employment
Eligibility
Verification
10/21/2019 https://www.uscis.gov/sites/default/file s/files/form/i-9.pdf
DD 441
Department of
Defense Security
Agreement
Feb 2020 http://www.dtic.mil/whs/directives/for ms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving Report
Aug 2000 https://www.esd.whs.mil/Directives/for ms/dd0001_0499/
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
Complete installation of Quad Blaster QB-4 with strobes ultrasonic bird control systems with strobes for two separate aircraft hangars: Hangar LE 200 approximately 870688 cubic feet and
Hangar LE 300 approximately 436960 cubic feet. No exposed conduit on any building as a result of installation. OKDE must review construction and/ or build documents prior to beginning of installation.
TECHNICAL EXHIBIT 1
Deliverables Schedule
PWS
Reference /
Deliverable
Title
Frequency Number of Copies
Medium/Format Submit To
4.0
Contractor
Furnished
Property, Materials, and
Equipment
(CFP/M/E):
installation
Two Electronic
Submission wiring and device diagrams, owner’s manual
Airfield
Management http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.esd.whs.mil/Directives/forms/dd0001_0499/
5.0 requirements, paragraph
5.1.3
One Two Electronic
Submission
Airfield
Management
File details come from the government source that posted it. Updated .