Attachment 7-KELL162006_66.xls

XLS spreadsheet 166 KB Posted

Attached to
Modify building 917 Simulator Area and Vault to ICD 705 Standards
Solicitation number
W912L1-20-B-6002
Issued by

About this file

This document contains a submittal schedule for a federal construction contract to modify a simulator area and vault to meet intelligence community standards. The schedule lists over 200 submittal items required from the contractor organized by construction discipline. Key submittals include construction schedules, sustainability plans, shop drawings, product data and samples for various building systems and components. The contract duration is 300 days from notice to proceed and is set aside 100% for small businesses with a NAICS code of 238290 and size standard of $16.5 million. The contractor must provide all labor, equipment and materials to complete the renovation project to a LEED Silver certification level in accordance with the specifications, drawings and basis of design documents.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal 1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
KELL162006MODIFY SIMULATOR AREA AND VAULT
TO BE COMPLETED BY PROJECT ENGINEER
SUBMITTAL NUMBERPRECONSTRUCTIONSHOP DRAWINGSPRODUCT DATASAMPLESDESIGN DATATEST REPORTSCERTIFICATESMANUFACTURER'S INSTRUCTIONSMANUFACTURER'S FIELD REPORTSOPERATION AND MAINTENANCE DATACLOSEOUTAPPROVING AUTORITYSUSTAINABILITY ENOTEBOOKREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVAL
GENERALGENERAL
1SALVAGE PLANXXPRECONSTRUCTION
2EARNED VALUE REPORTXAEXPRECONSTRUCTION
3VIEW LOCATION MAPXPRECONSTRUCTION
4PROGRESS AND COMPLETION PICTURESXPRECONSTRUCTION
5COLOR BOARDSXAE90 DAYS AFTER AWARD
6CONSTRUCTION SCHEDULEXAEPRECONSTRUCTION
7PRELIMINARY HIGH PERFORMANCE AND SUSTAINABLEXPRECONSTRUCTION
8SUSTAINABILITY ACTION PLANXPRECONSTRUCTION
9PRELIMINARY SUSTAINABILITY ENOTEBOOKXPRECONSTRUCTION
10FINAL HIGH PERFORMANCE AND SUSTAINABLEX
11FINAL SUSTAINABILITY ENOTEBOOKX
12AMMENDED FINAL HIGH PERFORMANCE AND SUSTAINABLEX
13AMMENDED FINAL SUSTAINABILITY ENOTEBOOKX
14QUALITY CONTROL PLANXWITHIN 15 DAYS AFTER AWARD
15WASTE MANAGEMENT PLANXPRECONSTRUCTION
16OPERATION AND MAINTENANCE MANUALSX
17AS-BUILT DRAWINGSX30 DAYS PRIOR TO BOD
18FINAL DD 1354X60 DAYS PRIOR TO ACCEPTANCE OF WORK
19CHECKLIST FOR DD FORM 1354X
DEMODEMOLITION
20DEMOLITION PLANXPRECONSTRUCTION
21NOTIFICATIONX
CONCRETEMISCELLANEOUS CAST-IN-PLACE CONCRETE
22INSTALLATION DRAWINGSX
23MIX DESIGNX
24CONCRETE MIXTURE PROPORTIONSX
25COMPRESSIVE STRENGTH TESTINGX
26SLUMPX
MASONRYUNIT MASONRY
27REINFORCEMENT DETAIL DRAWINGX
28CLAY OR SHALE BRICKXX
29CEMENTX
30CEMENTIOUS MATERIALSX
31CONCRETE MASONRY UNITS (CMU)X
32ADMIXTURES FOR MASONRY MORTARX
33ANCHORS, TIES, AND BAR POSITIONERSX
34JOINT REINFORCEMENTX
35CLAY MASONRY EXPANSION-JOINT MATERIALSX
CARPENTRYROUGH CARPENTRY
36CERTIFIED SUSTAINABILITY HARVESTED WOODX
37CERTIFIED SUSTAINABILITY PLYWOODX
38INDOOR AIR QUALITY FOR FIBERBOARD WALL SHEATHINGX
39INDOOR AIR QUALITY FOR AEROSOL ADHESIVESX
JOINTSJOINT SEALANTS
40SEALANTSX
41PRIMERSX
42BOND BREAKERSX
43BACKSTOPSX
44INDOOR AIR QUALITYX
45INDOOR AIR QUALITY FOR INTERIOR SEALANTSX
DOORSSTEEL DOORS AND FRAMES
46DOORSXX
47FRAMESXX
48ACCESSORIESXX
49WEATHERSTRIPPINGXX
50SCHEDULE OF DOORSX
51SCHEDULE OF FRAMESX
DOORSWOOD DOORS
52DOORSXX
53SOUND TRANSMISSION RATINGX
54DOOR FINISH COLORSX
55CERTIFIED SUSTAINABILITY HARVESTED FLUSH WOOD DOORSX
DOORSDOOR HARDWARE
56MANUFACTURER'S DETAIL DRAWINGX
57VERIFICATION OF EXISTING CONDITIONSX
58HARDWARE SCHEDULEX
59KEYING SYSTEMX
60HARDWARE ITEMSXX
GYPSUMGYPSUM BOARD
61METAL SUPPORT SYSTEMSXX
62ASBESTOS FREE MATERIALSX
FLOORINGRESILIENT FLOORING
63RESILIENT FLOORING AND ACCESSORIESXXX
64RESILIENT FLOORING AND ACCESSORIES ADHESIVESX
65MOISTURE, ALKALINITY AND BOND TESTSX
66SURFACE PREPERATIONX
67INSTALLATIONX
FLOORINGCARPETING
68MOLDINGSX
69RECYCLED CONTENT FOR CARPETINGX
70INDOOR AIR QUALITY FOR AEROSOL ADHESIVESX
71INDOOR AIR QUALITY FOR NON-AEROSOL ADHESIVESX
72INDOOR AIR QUALITY FOR CONCRETE PRIMERX
PAINTPAINTS AND COATINGS
73COATINGXX
74COLORX
75QUALIFICATION TESTING LABORATORY FOR COATINGSX
VISUALVISUAL DISPLAY UNITS
76VISUAL DISPLAY BOARDXX
77ALUMINUMX
78PORCELAIN ENAMELX
79MATERIALSX
LIFTVERTICAL WHEELCHAIR LIFT
80TYPICAL DETAILS OF ASSEMBLY, ERECTION AND ANCHORAGEX
81MANUFACTURER'S INSTALLATION INSTRUCTIONSX
FIREWET PIPE SPRINKLER SYSTEM
82FIRE PROTECTION SPECIALISTXPRECONSTRUCTION
83SPRINKLER SYSTEM INSTALLERXPRECONSTRUCTION
84SHOP DRAWINGSX
85AS-BUILT DRAWINGSX
86MATERIALS AND EQUIPMENTX
87HYDRAULIC CALCULATIONSX
88PRELIMINARY TEST PROCEDURESX
89PRELIMINARY TEST REPORTX
90FINAL ACCEPTANCE TEST PROCEDURES
91FINAL ACCEPTANCE TEST REPORT
92CERTIFICATION BY FIRE PROTECTION SPECIALISTX
93OPERATION AND MAINTENANCE MANUALSX
HVACHVAC
94DETAIL DRAWINGSX
95DUCT ACCESS DOORSX
96MANUAL BALANCING DAMPERSXX
97AIR HANDLING UNITSXX
98VARIABLE VOLUME, SINGLE DUCT TERMINAL UNITSXX
99REHEAT UNITSXX
100PERFORMANCE TESTSX
101DAMPER ACCEPTANCE TESTX
102OPERATION AND MAINTENANCE MANUALSX
103CENTRIFUGAL FANSX
104ENERGY EFFICIENT EQUIPMENTX
105REDUCE VOLATILE ORGANIC COMPOUNDSX
106INDOOR AIR QUALITY DURING CONSTRUCTIONX
107OZONE DEPLETING SUBSTANCES FOR REFRIGERANTSX
HVACTESTTING AND BALANCING
108TAB SCHEMATIC DRAWINGS AND REPORT FORMSXAE
109EQUIPMENT AND PERFORMANCE DATAXX
110COMPLETED PRE-FINAL DALT REPORTX
111CERTIFIED FINAL DALT REPORTX
112INDEPENDENT TAB AGENCY AND PERSONNEL QUALIFICATIONSX
HVACTHERMAL INSULATION
113MICA PLATESX
114PIPE INSULATION SYSTEMSXX
115DUCT INSULATION SYSTEMSXX
116EQUIPMENT INSULATION SYSTEMSXX
117THERMAL INSULATIONX
118DISPLAY SAMPLESX
119REDUCE VOC FOR CAULKING, SEALANTS AND ADHESIVEX
120RECYCLED CONTENT FOR PIPE AND DUCTWORK INSULATIONX
HVACGAS PIPING
121GAS PIPING SYSTEMXX
122PIPE AND FITTINGSX
123GAS EQUIPMENT CONNECTORSX
124PIPE COATING MATERIALSXX
125PRESSURE REGULATORSX
126TRANSITION FITTINGSX
127VALVESX
128WARNING AND IDENTIFICATION TAPEX
129TESTINGX
130PRESSURE TESTSX
131TEST WITH GASX
132WELDERS PROCEDURES AND QUALIFICATIONSX
133ASSIGNED NUMBER, LETTER, OR SYMBOLX
134PE PIPES AND FITTINGSX
135GAS FACILITY SYSTEM AND EQUIPMENT OPERATIONX
136GAS FACILITY SYSTEM MAINTENANCEX
137GAS FACILITY EQUIPMENT MAINTENANCEX
HVACREFRIGERANT PIPING
138REFRIGERANT PIPING SYSTEMX
139MAINTENANCEX
140OPERATION AND MAINTENANCE MANUALSX
141DEMONSTRATIONSX
HVACHEATING BOILERS
142OPERATION AND MAINTENANCE INSTRUCTIONSX
143WATER TREATMENT SYSTEMX
144ENERGY EFFICIENT EQUIPMENT FOR BOILERSX
145INDOOR AIR QUALITY DURING CONSTRUCTIONXX
HVACUNITARY HEATING AND COOLING EQUIPMENT
146DEMONSTRATIONSX
147REFRIGERANT TESTS, CHARGING, AND START-UPX
148SYSTEM PERFORMANCE TESTS
149OPERATION AND MAINTENANCE MANUALSX
ELECTRICALELECTRICAL
150CONDUITS AND RACEWAYX
151WIRE AND CABLEX
152SPLICES AND CONNECTORSX
153SWITCHESX
154RECEPTACLESX
155OUTLET BOXES, PULL BOXES AND JUNCTION BOXESX
156CIRCUIT BREAKERSX
157PANELBOARDSXX
158DIRECTORY CARD AND HOLDERX
159LAMPS AND LIGHTING FIXTURESX
160DRY-TYPE DISTRIBUTION TRANSFORMERSX
161CONTINUITY TESTX
162PHASE-ROTATION TESTSX
163INSULATION RESISTANCE TESTSX
ELECTRICALINSULATED WIRE AND CABLE
164WIRE AND CABLEX
165CONDUCTORSX
ELECTRICALINSPECTION AND TESTING
166ACCEPTANCE TESTS AND INSPECTIONSXX
167QUALIFICATIONS OF ORGANIZATIONX
ELECTRICALLIGHTING CONTROL DEVICES
168INSTALLATION DRAWINGSX
169TIME SWITCHX
170OCCUPANCY SENSORSX
171MOTION SENSORSX
ELECTRICALINTERIOR DISTRIBUTION SYSTEM
172PANELBOARDSX
173TRANSFORMERSXX
174CABLE TRAYSX
175WIREWAYSX
176LOAD CENTERS FOR HOUSING UNITSXX
177MARKING STRIPS DRAWINGSX
178RECEPTACLESX
179CIRCUIT BREAKERSX
180SWITCHESX
181ENCLOSED CIRCUIT BREAKERSX
182MANUAL MOTOR STARTERSX
183RESIDINTIAL LOAD CENTERSX
184CATV OUTLETSX
185SURGE PROTECTIVE DEVICESX
186600-VOLT WIRE TESTINGX
187GROUNDING SYSTEM TESTX
188TRANSFORMER TESTSX
189GROUND-FAULT RECEPTACLE TESTX
190FUSESX
ELECTRICALPANELBOARDS
191DETAIL DRAWINGSX
192PANELBOARDSX
193DIRECTORY CARD AND HOLDERX
194CONTINUITY TESTSX
195INSULATION TESTSX
196CERTIFICATIONX
197MANUFACTURER'S INSTRUCTIONSX
ELECTRICALAUTOMATIC TRANSFER SWITCH
198TESTINGX
199SWITCHING EQUIPMENTX
200INSTRUCTIONSX
ELECTRICALINTERIOR LIGHTING
201LUMINAIRE DRAWINGSXX
202OCCUPANCY /VACANCY SENSOR COVERAGE LAYOUTXX
203LIGHT SOURCESXX
204DRIVERS, BALLASTS AND GENERATORSX
205LED LUMINAIRE WARRANTYX
206VACANCY SENSORSX
207DIMMING CONTROLLERSX
208TIME SWITCHX
209POWER HOOK LUMINAIRE HANGARSX
210EXIT SIGNSX
211EMERGENCY LIGHTING UNITX
212LED EMERGENCY DRIVERSX
213OCCUPANCY SENSORSX
214AMBIENT LIGHT LEVEL SENSORX
215LED LUMINAIREX
216ENERGY EFFICIENCYX
217LUMINAIRE USEFUL LIFE CERTIFICATEX
218LED DRIVER AND DIMMING SWITCH COMPATIBILITYX
ELECTRICALEXTERIOR LIGHTING
219PHOTOMETRIC PLANXPRECONSTRUCTION
220LED LUMINAIRE WARRANTYXPRECONSTRUCTION
221LUMINAIRE DRAWINGSX
222LED LUMINAIRESXX
223LUMINAIRE LIGHT SOURCESXX
224TIME SWITCHX
225MOTION SENSORSX
226DESIGN DATA FOR LUMINAIRESX
227LUMINAIRE USEFUL LIFE CERTIFICATEX
COMMBUILDING TELECOMMUNICATIONS CABLING
228TELECOMMUNICATION DRAWINGSX
229TELECOMMUNICATION SPACE DRAWINGSX
230TELECOMMUNICATION CABLINGX
231PATCH PANELSX
232TELECOMMUNICATIONS OUTLETX
233EQUIPMENT SUPPORT FRAMEX
234CONNECTOR BLOCKSX
235SPARE PARTSX
236TELECOMMUNICATION CABLING TESTINGX
237TELECOMMUNICATION CONTRACTOR QUALIFICATIONSX
238KEY PERSONNEL QUALIFICATIONSX
239MANUFACTURER QUALIFICATIONSX
240TEST PLANX
241FACTORY REEL TESTSX
242TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEMX
243RECORD DOCUMENTATIONX
SECURITYGROUNDING AND BONDING FOR ELECTRONIC SAFETY
244GROUNDING SYSTEMSX
245GROUND RODSX
246GROUND WIRESX
247CONNECTORS AND FASTNERSX
248BONDING MATERIALSX
249BOND RESISTANCE TESTX
250GROUND RESISTANCE TESTX
251GROUND ISOLATION TESTX
252CONTINUITY ISOLATION TESTX
UTILITIESUNDERGROUND ELECTRICAL DISTRIBUTION
253PRECAST UNDERGROUND STRUCTURESX
254FIELD ACCEPTANCE CHECKS AND TESTSX
255CABLE INSTALLER QUALIFICATIONSX

&L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used