136th Mission Support Contracting Request for Information Worksheet

Page 1 of 1RFIW, v1.0

Requirement Information

Requirement Description Solicitation/Contract Number Contracting Officer

CRF Awning W912L119Q5002 CMSgt Micah Kruse

Questions and Answers

Number Question

01 What distance should the structure be offset from the existing fence?

Answer 3 FT

02 What are the specs for the personnel gate?

Answer REF 3.1.8.

03 The back wall will have a walk through passage way to the Chainlink personnel gate, what width & height shall the opening be?

Answer REF 3.1.8.

04 The sheeting should be a minimum 2” off the asphalt surface and maintain a level run around the entire building perimeter, correct?

Answer CORRECT, MAINTAIN LEVEL

05 Do you want an air gap at the top of the enclosed wall? If so, how much?

Answer 2"

06 Is a factory finish required on metal panels?

Answer Yes

Typically on a weld up structure like this we do not submit an engineered stamped set of drawings, rather a set of drawing with the design.

Do you want an engineer stamp on these? If so, would your engineers be willing to work with the contracted vendor to provide the stamp on the provided drawings?

Answer No

08 Can the metal siding be more that 2" on the bottom edge, if the ground slopes down?

Answer Yes Ref Question 4.

09 Is the underground utility location /safety marking, the responsibility of the contractor?

Answer Contractor to coordinate with COR / GOV to Provide

10 Are there any environmental issues/ procedures to be taken into consideration when removing the dirt off base, from the pier drilling?

Answer N/A

11 Can parts of the wire fence be removed and replaced, if required, during the construction, for ease of access purposes, for any reason?

Answer Area needs to be secured at end of each day.