Construction_Cost_Estimate_Worksheet.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- CRF Awning
- Solicitation number
- W912L119Q5002
About this file
Construction Cost Estimate Worksheet
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Worksheet
CONSTRUCTION COST ESTIMATE BREAKDOWN
| Project Name | Project No. | Solicitation No. | Contractor's Total Proposed Contract Price |
| CRF Awning | N/A | W912L119Q5002 |
Company Name Company Address
| No. | Item Description | U/I | Material Cost | Labor Cost | Other Direct Cost | Line Total | ||||
| Qty | Unit Cost | Total Cost | MH/MD | Av Rate | Total Cost | |||||
| 01 | $0 | $0 | $0 |
02 $0 $0 $0
03 $0 $0 $0
04 $0 $0 $0
05 $0 $0 $0
06 $0 $0 $0
07 $0 $0 $0
08 $0 $0 $0
09 $0 $0 $0
10 $0 $0 $0
11 $0 $0 $0
12 $0 $0 $0
13 $0 $0 $0
14 $0 $0 $0
15 $0 $0 $0
16 $0 $0 $0
17 $0 $0 $0
18 $0 $0 $0
19 $0 $0 $0
20 $0 $0 $0
| Total Material Costs | Total Labor Costs | Total Other Direct Costs | Total Direct Costs |
| $0 | $0 | $0 | $0 |
| Total Overhead | Subtotal | Total Profit | Total Price |
| $0 | $0 | $0 | $0 |
| Name and Title of Authorized Representative | Signature of Authorized Representative | Date | ||
| MANDATORY FORMAT - DO NOT MODIFY | PAGE 5 |
Instructions
| Contractors shall enter data ONLY in gray fields. All other fields are either prefilled by the government or have an automatic calculation that does not require manual input. | |
| Fields shall be completed as follows: | |
| Description: This is a description of materials required, work to be performed, etc. Breakdown should be in sufficient detail to permit itemizing of direct costs. | |
| Unit of Measure: This is the unit in which each item is to be estimated. Examples are as follows: square yards (SY), cubic yards (CY), square feet (SF), etc. | |
| Quantity: Contractor's estimate of quantity required in terms of unit of measure. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. | |
| Material Costs: Enter unit cost of material to be supplied. | |
| Manhours / Mandays: Enter the estimated number of manhours or mandays required to perform the work listed. | |
| Average Rate: Enter the average rate per manhour or manday. | |
| Other Direct Costs: Enter the estimated costs of special equipment and other items that are special to the contract and significant in dolalr value. | |
| Total Overhead: Enter the total overhead applicable to the work listed. This is NOT to be entered as a percentage. | |
| Total Profit: Enter the total profit applicable to the work listed. This is NOT to be entered as a percentage. | |
| The purpose of this form is to provide a standard format by which the offeror submits to the government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. |
File details come from the government source that posted it.