Construction_Cost_Estimate_Worksheet.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
CRF Awning
Solicitation number
W912L119Q5002
Issued by

About this file

Construction Cost Estimate Worksheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Worksheet

CONSTRUCTION COST ESTIMATE BREAKDOWN

Project NameProject No.Solicitation No.Contractor's Total Proposed Contract Price
CRF AwningN/AW912L119Q5002

Company Name Company Address

No.Item DescriptionU/IMaterial CostLabor CostOther Direct CostLine Total
QtyUnit CostTotal CostMH/MDAv RateTotal Cost
01$0$0$0

02 $0 $0 $0

03 $0 $0 $0

04 $0 $0 $0

05 $0 $0 $0

06 $0 $0 $0

07 $0 $0 $0

08 $0 $0 $0

09 $0 $0 $0

10 $0 $0 $0

11 $0 $0 $0

12 $0 $0 $0

13 $0 $0 $0

14 $0 $0 $0

15 $0 $0 $0

16 $0 $0 $0

17 $0 $0 $0

18 $0 $0 $0

19 $0 $0 $0

20 $0 $0 $0

Total Material CostsTotal Labor CostsTotal Other Direct CostsTotal Direct Costs
$0$0$0$0
Total OverheadSubtotalTotal ProfitTotal Price
$0$0$0$0
Name and Title of Authorized RepresentativeSignature of Authorized RepresentativeDate
MANDATORY FORMAT - DO NOT MODIFYPAGE 5

Instructions

Contractors shall enter data ONLY in gray fields. All other fields are either prefilled by the government or have an automatic calculation that does not require manual input.
Fields shall be completed as follows:
Description: This is a description of materials required, work to be performed, etc. Breakdown should be in sufficient detail to permit itemizing of direct costs.
Unit of Measure: This is the unit in which each item is to be estimated. Examples are as follows: square yards (SY), cubic yards (CY), square feet (SF), etc.
Quantity: Contractor's estimate of quantity required in terms of unit of measure. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed.
Material Costs: Enter unit cost of material to be supplied.
Manhours / Mandays: Enter the estimated number of manhours or mandays required to perform the work listed.
Average Rate: Enter the average rate per manhour or manday.
Other Direct Costs: Enter the estimated costs of special equipment and other items that are special to the contract and significant in dolalr value.
Total Overhead: Enter the total overhead applicable to the work listed. This is NOT to be entered as a percentage.
Total Profit: Enter the total profit applicable to the work listed. This is NOT to be entered as a percentage.
The purpose of this form is to provide a standard format by which the offeror submits to the government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis.