addendum_1.docx
DOCX document 13 KB Posted
- Attached to
- Vehicle Barrier System Federal contract opportunity
- Solicitation number
- W912K6-15-R-0013
About this file
Addendum to the SOW. It clarifies 3 paragraphs within the original SOW.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912K6-15-R-0013-0001.pdf | ||
| RFI_Net_Barrier.docx | DOCX document | |
| W912K6-15-R-0013.pdf | ||
| SOW.docx | DOCX document | |
| 175th_WING_INSTALLATION_ACCESS_APPLICATION.pdf | ||
| DOD_Anti-Ram_Vehicle_Barriers_May_2015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Barrier Net System (Statement of Work) Addendum 1
6.14 System must have controlled heating elements inside the below pavement housing to melt snow or ice that may accumulate. The system is required to operate in all weather conditions with a redundant electrical backup system such as batteries. Thermostats must automatically turn the heating unit(s) on and off.
6.16 Contractor will provide and install all signs, warning lights, traffic lights, flashing lights, safe loops and alarms. All work is to be completed in compliance with all Department of Defense and Army Corp of Engineers Protective Design Center regulation and standards.
6.31 Contractor is to provide training of operation and maintenance of barrier net system. The training should be comprehensive enough for the end use to be able to provide daily, monthly, quarterly and yearly maintenance on net barrier system.
File details come from the government source that posted it. Updated .