W912K6-15-B-0001-0001.pdf
PDF 38 KB Posted
- Attached to
- Asbestos Abatement Federal contract opportunity
- Solicitation number
- W912K6-15-B-0001
About this file
Amendment to the Statement of Work attached to the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Request_for_information-APR_6_2015.docx | DOCX document | |
| BLDG_1080_Alterations_To_Building_1080_Floor_Plans_Reflected_Ceiling_Plans__Interior_Elevations_01-14-94_AA-2.pdf | ||
| BLDG_1080_Group_Operation_ _Training_Building_Roof_Plan_ _Details_05-01-68_PLT7.pdf | ||
| Request_for_Information_-_Asbestos_BLDG_1080.docx | DOCX document | |
| Request_for_Information_-_Asbestos_BLDG_1080.docx | DOCX document | |
| Asbestos_Flooring.pdf | ||
| Bulk_Analysis_.pdf | ||
| Exhibit_G_Environmental_Protection_Plan_for_Contractors.pdf | ||
| W912K6-15-B-0001.pdf | ||
| EXHIBIT_F.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F7U3MB5076A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the quantities in the SOW and other administrative details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912K6-15-B-0001
X 9B. DATED (SEE ITEM 11)
24-Mar-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Mar-2015
CODE
MD ANG BASE CONTRACTING OFFICE
MD AIR NATIONAL GUARD
MARTIN STATE AIRPORT
2701 EASTERN BOULEVARD
MIDDLE RIVER MD 21220-2801
W912K6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912K6-15-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
1. General Project Information:
1.1 Project Location and Background: Asbestos abatement of the Operation and Training Facility (BLDG 1080), Martin State Airport, Maryland Air National Guard, Baltimore, MD 21202. It was recently discover during the staging of the demolition of BLDG 1080 that there is asbestos mastic under the flooring, asbestos in the caulk of the windows and the rain leaders are wrapped in asbestos.
1.2 N/A
1.3 Use of Premises:
1.3.2 All Contractor employees, including subcontractors, must sign a background check release form for Base access. Once a background check has been completed with no negative findings, employees will be granted access to the installation.
1.3.4. Contractor shall assume full responsibility for protection and security of materials and equipment stored on site.
1.3.5. Contractor shall move any stored products, under their control, which interfere with operations of the Government.
1.4. Government Equipment: Contractor use of Government owned or leased equipment such as: hoists, forklifts, compressors, welding machines, cutting rigs, etc. shall not be permitted on either a reimbursable or non-reimbursable basis. Cost for all equipment required to accomplish the work shall be included in the Contractor’s final bid price.
1.5. Permits and Inspections:
1.5.1. Normally no permits or inspections by local building officials are required. All inspections will be performed by COR unless modified by the Statement of Work. All testing will be performed by the Contractor unless modified by the Statement of Work.
1.6. Contractor Passes: Post-Award, contractor passes are only issued to personnel who have properly submitted a locally generated 175th Wing Installation Access Application and have been cleared through an approved background investigation by the 175th Security Forces Squadron. Contractor Passes are only issued to contractors who will be required to work more than 14-days on the installation in the performance of their contract. For contractors requiring less than 14 days of access, an AF FM 75, Visitors Pass, will be issued upon a favorable background investigation.
In order to receive a Contractors pass for this installation, the contractor must complete the locally generated 175th Wing Installation Access Application. This application contains required information necessary to conduct a National Criminal Information Center (NCIC) background or a Defense Biometric Identification System (DBIDS) check.
The Defense Forces Commander (DFC) maintains the right to deny contractors access to the installation based on unfavorable information obtained through NCIC or DBIDS.
1.7. Daily Report and Sign-In Register: Each day the Contractor is on site to perform any work, the Superintendent/Foreman shall sign in at the Base Engineering Building (Facility 2100), indicating specific Facility/Location and the number of persons who shall be performing work that day.
1.8. Hours of Operations: The hours of operations at Martin State Airport for the Air National Guard are 10 hours per day (0630 – 1700) Tuesday – Friday. Coordinate access to premises with COR, for execution of work. Emergency situations, military operations, or other contingencies, may cause suspension of work or restrictions on access to the construction site.
1.9. Off-Hours Work: Except as otherwise specified, all work shall be performed during regular work hours (indicated above). If the Contractor desires or is required to work on Mondays, Saturdays, Sundays, Holidays or other hours outside normal work schedule, the Contractor shall be required to seek written approval from the Contracting Officer. The Contractor is not entitled to premium time if the request is approved.
1.10. Clean-up: The work site is an active civilian and military airport. Site cleanliness and Foreign Object Debris (FOD) control is essential. The Contractor will clean up all construction debris and refuse and will remove it from the work site and the Base daily at their own expense.
1.11. Safety: The Contractor is responsible for performing all work In Accordance With (IAW) State and Federal OSHA requirements as well as compliance with the most current USACE EM 385-1-1. This is available at:
http://140.194.76.129/publications/eng-manuals/em385-1-1/2008_English/toc.html.
1.12. Environmental Protection and Waste Disposal: The Contractor shall, at their own expense, remove all sludge, dust and debris from the property of the Martin State Airport Air National Guard Base which have resulted from specific work described in Paragraph 2 of these specifications. The disposal of all such materials, which may include hazardous or toxic liquids that are used to perform the work, shall conform to all Federal, State, and Local environmental regulations with regards to both transportation and ultimate disposal. This project must comply with all Federal, State, and Local environmental regulations. All dumpster service and waste management shall be provided at no additional cost to the Government. All recyclable metal shall be placed into Martin State Airport scrap metal recycling containers.
Please contact the Base Environmental Engineer, Lt Col Peter Loebach, at (410) 918- 6486 for detailed information.
1.13. Drawings: Drawings furnished by the government to the Contractor may be used for general information only and shall not be relied upon in determining utility locates and documentation without complete on-site verification by the Contractor.
2. Specific Project Information:
2.1. References and Standards: All materials, installation and workmanship shall comply with applicable construction guidelines and standards.
2.2. Cost Proposal: Provide a detailed lump sum cost proposal (as well as hourly rates) indicating costs and breakdown for :
A. Labor cost
B. Mobilization cost
C. Material cost
D. Equipment cost
E. Dumpster cost
F. All other costs
You may attached a local produced form that matches the above request. All items (A- F) must equal the total lump sum cost.
2.2.1. Contractor is to be a licensed in the State of Maryland to abate asbestos. Contractor is to follow all federal and state laws in regards to asbestos abatement and perform all work to industry standards and practices.
2.2.2. Contractor is to submit a detailed schedule and means/method plan for review prior to start of the asbestos abatement. Include the schedule duration, control of dust, hazards associated with this type of abatement and a safety plan.
2.2.3. Contractor is to prepare and submit all required Maryland Department of Environmental (MDE) paper work to Maryland Department of Environmental (MDE) asbestos licensing/enforcement division. Provide copies to Base Environmental Officer and Base Engineering Project Manager.
2.2.4. Contractor is ensuring that included in bid is all materials, tools and equipment to accomplish this Statement of Work (SOW) for the abatement of all asbestos within Bldg. 1080.
2.2.5. Contractor is responsible for removal of all furniture on the 1st, 2nd floors and furniture staged outside and around the building of building 1080 and dispose of it off site. Contractor is to factor in all cost associated with the removal of all furniture to an offsite disposal area.
2.2.6. Contractor is responsible to do all pre-abatement demolition and selective demolition needed to be done to accomplish the asbestos abatement. Contractor is to factor in all cost associated with all pre-abatement and selective demolition in the overall bid.
2.2.7. Contractor is to abate 18000 square feet of asbestos mastic, in total, on the 1st and 2nd floor of Bldg. 1080. Contractor is to be aware that asbestos mastic is underneath a layer of encapsulating vinyl composition tile (VCT), rubber overlay and carpet throughout the building or any combination of the thereof. The contractor needs to ensure that this is taken into consideration when bidding this portion of the project.
2.2.8. Contractor is to remove and abate up to 90 windows and asbestos caulk from Bldg.
1080. Contractor is to do all associated work (pre-abatement demolition and selective demolition) corresponding to the proper removal and abatement of all windows and asbestos caulk asbestos in building 1080. Contractor is to factor in all cost associated with the removal of all windows and asbestos caulk in the overall bid.
2.2.9. Contractor is to abate up to 12 asbestos wrapped rain leaders throughout building
1080. Contractor is to do all associated work (pre-abatement demolition and selective demolition) corresponding to the proper removal and abatement of all asbestos wrapped rain leaders. Contractor is to factor in all cost associated with the removal of all asbestos wrapped rain leaders in overall cost of the bid.
2.3. Description of Work: The Contractor shall describe in his or her proposal how they will manage the project.
2.4. Construction Performance Period: The Contractor shall identify what s/he considers the performance period to be. The proposed performance period will be included in the Cost Proposal.
2.5. Meetings: A “Preconstruction” Meeting will be required post-award and prior to initiation of the Scope of Services.
2.6. Sundry Elements: Any material, devices or services not specifically mentioned or indicated in this specification that are reasonably required for a complete, finished and first class operating installation, shall be provided by the Contractor at no additional cost to the owner. The work shall be installed in accordance with this specification and best industry practices.
2.7 The Contractor shall be fully aware of, and include in the work plan, safety measures to assure that its workers are not put at risk at any time while completing the work.
2.8 The Contractor shall post any and all required safety or caution flags/signs to protect workers and Base personnel.
2.9. The Contractor shall be aware of and protect its workers from noise, dust, and fumes/vapors normally encountered while working on or near an active runway and aircraft.
2.9.1 Administrative Tasks as part of the Detailed Requirements:
2.9.2 The Contractor shall submit a schedule of events to be completed for tasks to the COR for review and approval prior to beginning work.
2.9.3 The Contractor shall use best practice standards when performing work required by this “Statement of Work”.
2.9.4 The Contractor shall prepare and furnish all required engineering and/or shop drawings prior to the completion of the project.
2.9.5 Meetings – The Contractor is required to attend the following meetings:
a. The prospective Contractor(s) may be required to attend a Pre-proposal Meeting/Site Visit prior to submitting a proposal. The meeting is intended to last ½-hour and will convene in the Civil Engineering Conference Room, Building 2100, followed by a visit to the job site.
b. The Contractor shall attend a Pre-construction Meeting post-award and prior to initiation of the Scope of Services.
c. Prior to acceptance of Deliverables the Contractor shall attend a meeting to discuss submitted engineering/shop drawings and final report.
2.9.6 Qualifications: Minimum five (5) years documented experience providing comprehensive, professional asbestos abatement and licensed in the State of Maryland.
2.10. Quality Control: The Contractor shall establish and maintain quality control to assure compliance with contract requirements and shall maintain records of his quality control.
A copy of these records, as well as the records of corrective action taken, shall be furnished to the Government.
3. Submittals:
3.1. Product/Equipment Information: All submittals must utilize AF/IMT 3000. Submit 4 sets of all AF IMT 3000 with attachments; 1 set for BCE, 1 set for Contracting, and 2 sets will be returned to the Contractor. Provide the following product/equipment information for approval by the COR prior to start-of-work.
3.1.1. Contractor is to provide submittals, for COR approval, describing the equipment and ancillary devices to be used on site in the context of the Contractor’s business operations.
3.1.2. Provide manufacturer’s literature (including capabilities of equipment, specifications, shop drawings if appropriate, etc.) for all equipment and ancillary devices to be used on site.
4. Prescriptions/Clauses:
4.1. Wage Determination: Currently, Wage Determination No: 1996-0223, Revision No: 34, Date Of Revision: 12/22/2014 is applicable to this task order. However, as required, the current prevailing Wage Determination will be incorporated at time of award. The labor category is 23470 – Laborer South Region.
4.2. Performance and Payment Bonds: N/A
4.3. Construction: () YES or (X) NO, reference Contract Clause 52.246-21, Warranty of Construction Clause is applicable to this task order.
4.4. Proposal Due Date: All offers are due at the Base Civil Engineering Office (Facility 2100) as of the date set within the Solicitation provided by the Contracting Officer.
Mailing address: Maryland Air National Guard 2701 Eastern Boulevard, Baltimore, MD 21220 Attn: Base Contracting Office/MSgt Dombkiewicz
(410) 918-6218
(End of Summary of Changes)