Latest RFI Dated 3 Apr 2015. Important read for quantity change from SOW. There are only 4 rain leaders instead of 12 rain leaders.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information – Solicitation W912K6-15-B-0001 Asbestos Abatement BLDG 1080 3 Apr 2015 1- Quantity and type of furniture to remove from the 1st and 2nd floor and outside building 1080? It is office furniture and it is scattered throughout the building. Government does not have a quantity to give the contractor the best guess is use the square footage of the building, as if there was furniture in every square inch of the building.

2- The square footage of the rubber overlay and carpet, Is it 18000?

For estimate purposes use 18000 square feet

3-The number of windows and size that needed to be removed from the 1st and 2nd floor?

Windows are approximately 44"x 66" and there is approximately 90 windows per the SOW.

4- Quantity and linear feet of wrapped rain leaders to remove throughout the building 1080?

There are four (4) rain leader with approximately 250 linear feet of total rain leader pipe. This is a change from the SOW.

See pictures below

Request for Information – Solicitation W912K6-15-B-0001 Asbestos Abatement BLDG 1080 27 Mar 2015

1) Could you please let me know how I can obtain the Asbestos Survey?

During the beginning stages of the demolition of building 1080 the contractor raised concerns of potential asbestos mastic underneath the VCT tile. The government gave the contractor permission to test any and all material that was suspect of asbestos. The contractor tested the mastic, brick, brick mortar, drywall and window caulk. Out of the material tested the caulk around the windows and the mastic under the floor tile came back positive for asbestos. Government also believes that the rain leaders that run from the roof down are wrapped with asbestos as well. In 2010 there was an environmental survey done suggesting that there was non-friable asbestos under the floor tiles in the building. There has not been a full asbestos survey ever done. The information that we have is based on the testing done by the contractor that was undertaking the demolition project. Attached is a copy of the asbestos finding.

2) When will there be a pre-bid site visit for us to review the work location?

At this time, there is not a schedule site visit for this project.