RFI_26_Aug_DOMOPS.docx

DOCX document 21 KB Posted

Attached to
Renovate Office Facility Federal contract opportunity
Solicitation number
W912K6-14-R-0005
Issued by
Department of the Army Maryland Army National Guard

About this file

Please disregard any previous RFI for this solicition. Use only RFI's label with a number.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Office Facility, newest first.
File Type Posted
RFI_DOMOPS.docx DOCX document
MDANG_RFI_2_(1).pdf PDF
RFI_DOMOPS.docx DOCX document
Building_1110_Option_5_Replace_9_Windows_Pictures.docx DOCX document
Non_-_Structural_Metal_Framing.pdf PDF
RFI_26_Aug_DOMOPS.docx DOCX document
Preproposal_Slides.pdf PDF
W912K6-14-R-0005-0001.pdf PDF
DOMOPS_Exhibit_G_Environmental_Protection_Plan_for_Contractors.pdf PDF
175th_WING_INSTALLATION_ACCESS_APPLICATION-1w.docx DOCX document
DOMOPS_EXHIBIT_A_SSS_SA_and_UR_Mar_13.doc DOC document
W912K6-14-R-0005.pdf PDF
DOMOPS_Exhibit_F_Proposal_Inquiry_Format.docx DOCX document
DOMOPS_EXHIBIT_E_Proposal_Form_Supporting_Document.docx DOCX document
Example_of_Replacement_Window_Picture.pdf PDF
SOW_Renovate_DOMOPS_Facility_1110_31_Jul_14.pdf PDF
DOMOPS_EXHIBIT_D_SSS_SA_and_UR.doc DOC document
DOMOPS_EXHIBIT_B_SSS_SA_and_UR_May_13_NEW.doc DOC document
DOMOPS_Exhibit_C_SSS__SA_and_UR_Mar_2013.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT F

PROPOSAL INQUIRY FORMAT

SOLICITATION W912K6-14-R-0005

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL IN THIS FORMAT!!

EMAIL: 175WG.MSC@ang.af.mil

Date of Proposal Inquiry: _____08/26/14__________

RFI Response

1. Do the windows need to meet a certain standoff requirement for blast resistance? There will be no standoff requirement for blast resistance for the new windows to be installed.

2. Are they any dimensions provided or drawings of the 9 windows for the option? The dimensions are provided in the option 5 Replace 9 Windows photos.

3. The Statement of work 4.2.2 says install 2 new 4ft x 10ft window systems. The picture provided, “Example of Replacement Windows” shows a system that is 10ft x 10ft wide. Please clarify. An amendment to the statement of work 4.2.2 shall read "Install 2 new 66" H X 124" L window systems from extruded aluminum alloy frame. These window systems must match the décor and color of the adjacent existing windows."

4: Should the 9 option replacement windows match the existing windows? Meaning, should the doubles have a fixed bottom/operable middle/fixed top? Or do you want to replace with fixed only? Should they have muntins? Please provide a detailed window schedule to price accurately. The option 5 Replace 9 Windows shall match the Example Replacement Window and will be replaced as fixed only with Mullion bars as necessary. The window schedule shall be as follows: Product, EFCO Thermal Aluminum SF EFCO 2700 1" Insulated Panels, Ratting Heavy Commercial P-HCSO AAMA RATED, Finnish Dark bronze anodized, Warranty one year total product ten year glass. All product information and materials shall follow the submittal process as stated in Addendum to statement of work Paragraph 16.

5. How high are planned-for suspended ceilings?

The ceiling height from finished floor to the ceiling is 8' and the height from the tile ceiling to the deck for suspension support is 6' 6"

6. Please verify if the existing interior door frames are to be replace. The drawing A101 refer to the doors but is not clear on the door frames. Six existing door frames have side lights not are not addressed if the frames are being replaced. The bathroom door frame shall be replaced following the door schedule on drawing A-101 and the SOW 4.2.4 Frame Fabrications. NO OTHER EXISTING INTERIOR DOOR FRAMES ARE TO REPLACED,

7. There is an existing door with side light that is not shown on the drawings. This door is between rm 109 and the steps. Will this stay or be removed? This door shall be replaced as indicated on drawing A-101 D-2.

8. Drawing A101 – Insulation Note under Wall Reference There is a reference that the wall insulation will abut the ceiling insulation. Is the ceiling being insulated? NO insulation in the ceiling will be required.

9. S OW 3.1.1

What is the size of the concrete pad requested for the fire hydrant? 16’x14’

10. Drawing A101 Storage Room The drawing refers to the wall as a 4” stud wall. SOW 5.1.1 refers to a aluminum wall system. Please verify this and include example or product information of specified aluminum wall. The 3 5/8” aluminum wall system shall be Clark Dietrich Building Systems Product or equivalent as indicated in attached cut sheet.

11. Past Performance Can CPARS.gov (Contractor Performance Assessment Reporting System) be used for references? Information from PIPPRs, which pulls information from CPARS, can be used as past performance information.