RFI_26_Aug_DOMOPS.docx

DOCX document 22 KB Posted

Attached to
Renovate Office Facility Federal contract opportunity
Solicitation number
W912K6-14-R-0005
Issued by
Department of the Army Maryland Army National Guard

About this file

RFI Response

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Office Facility, newest first.
File Type Posted
RFI_DOMOPS.docx DOCX document
MDANG_RFI_2_(1).pdf PDF
RFI_DOMOPS.docx DOCX document
Building_1110_Option_5_Replace_9_Windows_Pictures.docx DOCX document
Non_-_Structural_Metal_Framing.pdf PDF
RFI_26_Aug_DOMOPS.docx DOCX document
Preproposal_Slides.pdf PDF
W912K6-14-R-0005-0001.pdf PDF
W912K6-14-R-0005.pdf PDF
DOMOPS_Exhibit_F_Proposal_Inquiry_Format.docx DOCX document
DOMOPS_Exhibit_G_Environmental_Protection_Plan_for_Contractors.pdf PDF
175th_WING_INSTALLATION_ACCESS_APPLICATION-1w.docx DOCX document
DOMOPS_EXHIBIT_A_SSS_SA_and_UR_Mar_13.doc DOC document
DOMOPS_EXHIBIT_E_Proposal_Form_Supporting_Document.docx DOCX document
Example_of_Replacement_Window_Picture.pdf PDF
SOW_Renovate_DOMOPS_Facility_1110_31_Jul_14.pdf PDF
DOMOPS_EXHIBIT_D_SSS_SA_and_UR.doc DOC document
DOMOPS_EXHIBIT_B_SSS_SA_and_UR_May_13_NEW.doc DOC document
DOMOPS_Exhibit_C_SSS__SA_and_UR_Mar_2013.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT F

PROPOSAL INQUIRY FORMAT

SOLICITATION W912K6-14-R-0005

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL IN THIS FORMAT!!

EMAIL: 175WG.MSC@ang.af.mil

Date of Proposal Inquiry: _____08/26/14__________

RFI Response

1. Reference Drawing E-101- Lighting: Could you provide a Fixture Schedule that describes type of lamps, diffuser type and any preferred manufacturers?

· The suggested manufacture or equivalent to be Mobern Lighting, part number RG22-2-U32X-MV. See Cut sheet attached with highlighted part number with description.

2. Reference Drawing E-101- Switching: The Switching for the corridor between the Break Room and Offices shows a 3-Way Manual Switch on one end and a 3-Way Sensor on the other end. Is this correct?

· Yes this is correct, the switching for the corridor between the between the break room and the offices shall be a 3-way manual switch on one end and 3-way sensor on the other end.

3. Reference Drawing E-100 Riser Diagram & Panel SDP-1: While attending the site visit on 6/11/14 it was said that the feed between the Main 800A Panel and Panel SDP-1, shown in grey on the riser, is the only feeder to be included in this Scope of Work. Everything shown in Red is existing or being furnished by others. Is this correct?

· Yes this is correct, the riser diagram shown in gray on E-100 drawing from proposed panel SDP1 to existing main panel located in mechanical room at the West end of the building is the only electrical feed cable to be placed from the main 800A panel. Everything shown in red on E-100 riser diagrams is existing.

4. Reference Drawing E-100, E-101 Riser Diagram & Panel SDP-1: Can you provide a plan drawing that shows the location of the Main 800A Panel. Per our site visit we were told there are restrictions for the pathway for the feeder between the Main 800A Panel and Panel SPD-1. Can you provide a preferred pathway with this plan or highlight the restricted areas that feeders cannot pass through?

Reference Drawing E-100 Riser Diagram & Panel Main 800A: Will a new breaker need to be provide in the Main 800A Panel to serve new Panel SDP-1?

There will be a revision on the E-100 drawing riser diagram and Electrical Section of SOW to be provided before construction begins, for bidding purposes the revision will reflect;

· The pathway for the electrical feed which is to be installed along south exterior wall under soffit which will have to be removed and replaced at contractors cost from the mechanical room main panel 800A to location of proposed electrical panel SDP-1, which was the suggested route discussed during the site visit.

· The contractor shall include in bid to furnish and install approximately 300’ of schedule 80-3” PVC sunlight resistance conduit to include all J- BOXES and associated hardware/fasteners also two 3” cores through the CMU walls.

· Contractor shall include in bid to furnish and install approximately 320’ of a copper cable, TW # 2 /0,140 degree, 600 VAC 225 A for SDP-1.

· Contractor shall include in bid to furnish and install new Breaker in main panel 800A to serve new panel SDP-1

· Contractor shall include in bid to furnish and install new 100A sub panel fed from proposed panel SDP-1 to be placed next to or within 5’ of main panel SDP-1 final location to be approved by MDANG COR.

· Contractor shall include in bid to furnish and install American 50gal commercial water heater to be installed under stairwell to mezzanine next to new shoppette product number STCE3 50 60 or equivalent, see attached cut sheet with specifications.

· Contractor shall furnish and install single phase 30A double pull breaker in proposed sub panel and electrical wire serving new water heater to be installed under stairwell to mezzanine next to new shoppette.

· Contractor shall include in bid to furnish and install all plumbing associated in serving the sink located in the existing bathroom, two sinks in the break room, sink in the janitor’s closet and sink and shower in the proposed bath room also sink in the new shoppette.

5. What is the intent for the fire suppression system? Is this system to be provided only in the area of the new work or is the intent to bring the entire building up to code. It does not appear that the 2” sprinkler line existing is adequate to supply the new offices.

There is no work to be performed on the fire suppression system; the existing system is to stay in place and no work is to be performed by the contractor.

6. Is it possible to substitute MDSHA standard asphalts used for both State and county highway (Baltimore) paving uses ‘over the counter’ 64.22 and on occasion 70.22 binders.

It has been noticed on plans sheet C-101 that the new asphalt for the DOMOPS Facility 1110 grind & surface and full depth paving’ detail uses an asphalt binder liquid 76.22. This binder liquid, for the most part, is used in asphalt paving of the interstate highways and beltways. It is not an ‘over the counter’ asphalt. It is weather/temperature sensitive and for the most part not a- hand workable asphalt. As this liquid has to be kept warm/hot, local asphalt plants do not keep this binder in stock. This liquid would be stocked for large ‘special’ asphalt orders. In order to pave with the ‘special’ asphalt, the asphalt paving might have to be put on hold until the plant would have enough asphalt orders to justify stocking the 76.22 binder; and in some instances this ‘special’ paving is completed at night.

It is acceptable to substitute Binder 64-22 which is a Maryland State Highway Administration paving standard for the 76-22 binder specified in the C-101 Drawing on the PJMS 142021 Renovate DOMOPS Facility 1110 project.