This document is a revised architectural and engineering drawing set for a federal construction project at Georgia Garrison Training Center. The project involves replacing HVAC systems and performing miscellaneous repairs in 19 enlisted men barracks buildings and 2 latrine buildings located in the 13300 block of the facility.
The scope of work includes complete replacement of existing 5-ton HVAC systems comprising condensing units, furnaces, air handlers, and associated line sets, refrigerant piping, and electrical disconnects in each barracks building. New natural gas piping with cut-off valves, condensate drain piping, and flexible connectors must be installed from above-ground connection points to new furnace units. The project requires construction of new aluminum-insulated plenum boxes to replace existing wooden boxes, installation of new drywall and wood framing in mechanical rooms, replacement of thermostats with new in-building temperature sensors compatible with new equipment, and interface of new units with fire alarm control panel systems including return air duct detectors. In the latrine buildings (13306 and 13308), work includes replacement of condenser units, air handlers, furnaces, equipment stands, and metal-lined return plenums and transition boxes. All ductwork insulation must be repaired and coated with mastic, and suspended ceiling systems must be installed at 8 feet 2 inches above finished floor. Additional work includes installation of new GFIC outlets, electrical disconnects with new conductors and liquid flex connections, and relocation of surface-mounted items to new drywall surfaces. The drawings reflect revisions dated 03/29/26 and 03/30/26, indicating ongoing design refinement for this comprehensive mechanical and construction replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGN IN SHEET.pdf | ||
| Questions and Answers.pdf | ||
| SOWv1.pdf | ||
| LDC Replace HVAC Systems 21 BLD 13300 Block 19 Brks and 2 Latrines Drawings.pdf | ||
| Solicitation - W912JM26QA006 issued.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER 13260011
REPLACE HVAC SYSTEMS/MISCELLANEOUS REPAIRS
19 EM BARRACKS & 2 LATRINES, 13300 BLOCK
GEORGIA GARRISON TRAINING CENTER
(REVISED)
SHEET 1 OF 11
SITE PLAN
NOT TO SCALE
GFIGFI GFIGFI
TTTT
INDICATES BUILDINGS TO RECEIVE WORK
“D” DESIGNATION INDICATES BARRACKS
“C” DESIGNATION INDICATES LATRINES
43 17
E
C
C
AB
D
D
D
D
D
D
D D
D
D
D
D
DD D
D
D
D
I
B
A
A
A
A
M
EA
ST
TH
S
T R
EE
T
EA
ST
TH
S
T R
EE
T
MURRAY AVENUE
RICKER AVENUE
REFLECTS REVISION DATED 03/30/26
TT
TYPICAL BARRACKS BUILDING INTERIOR
PS
CA
SD
FA
C
P
O/A
FV
RA
SAD SAD DISCONNECT
CONDENSER ON CONC. PAD
NG PIPING
INTERIOR TEMPERATURE SENSOR
CA
FU1 FU2
AHU1 AHU2
CU1 CU2
ABBREVIATIONS:
PS – FIRE ALARM PULL STATION
CA – COMBUSTIBLE AIR DUCT
O/A – OUTSIDE AIR DUCT
RA – RETURN AIR DUCT
SAD – SUPPLY AIR DUCT
SD – SMOKE DETECTOR
AHU – AIR HANDLING UNIT
FU – FURNACE UNIT
FV – FURNACE VENT
CU – CONDENSER UNIT
LIQUID FLEX
REPLACE HVAC SYSTEMS
TYPICAL MECHANICAL ROOM PLAN
TYPICAL FOR BUILDINGS 13317, 13318, 13319, 13320, 13321, 13322, 13323, 13324, 13325, 13326, 13327, 13328, 13329, 13330, 13331, 13343, 13344, 13346 & 13347
EXISTING CONDITIONS
SCALE: ¾” = 1'-0"
SHEET 2 OF 11
A
2 3
GFIGFI
GFIGFI
RETURN AIR DUCT
SUPPLY TRANSITION
DUCT
FURNACEFURNACE
AH-2
AH-1
PLENUM BOX
NG LINE
CONDENSATE DRAIN
DISCONNECT DISCONNECT
1" FLEX
1/2" FLEX
REFRIG PIPING
THERMOSTAT FROM
INTERIOR SENSOR
DRYER
CMU MECHANICAL ROOM
WALL
1/2" FLEX
x
O
.C x
O
.C
RAFTERS @ 16" O.C.
FU
R
N A
C E
V
EN
T
TOP PLATE OF EXTERIOR
BARRACKS WALL
3" THRU WALL
SLEEVE
LINE SETS
O/A DUCT
SECTION
SCALE: ¾” = 1'-0"
A 2 3
EXISTING CONDITIONS SECTION
SHEET 3 OF 11
TYPICAL BARRACK BUILDING INTERIOR
PS
FA
C
P
NG PIPING
INTERIOR TEMPERATURE SENSOR
REPLACE HVAC SYSTEMS/MISCELLANEOUS REPAIRS,
TYPICAL BARRACK BUILDING
DEMOLITION PLAN
SCALE: ¾” = 1'-0"
SHEET 4 OF 11
1 1
NOTES:
NOTE 1 - REMOVE AND REPLACE OUTSIDE CONDENSER UNITS, FURNACES, AIR HANDLERS, LINE SETS, INSULATION AND RELATED WIRING (FROM DISCONNECTS TO UNITS). TYPICAL TWO SETS OF
SYSTEMS CONTROLLED BY ONE THERMOSTAT.
NOTE 2 - REMOVE AND REPLACE NATURAL GAS FURNACES AND AIR HANDLERS FROM PLENUM BOX TO
TRANSITION DUCTWORK, TO ACHIEVE REMOVAL OF UNITS. EXISTING NATURAL GAS PIPING
AND CONDENSATE DRAIN PIPING TO BE REPLACED WITH NEW FROM ABOVE-GROUND PIPING ELBOW
TO NEW FURNACE UNITS, TO INCLUDE NEW CUT-OFF GAS VALVES
NOTE 5 - REMOVE AND REPLACE SUPPLY AND RETURN AIR DUCTWORK AND INSULATION AS NEEDED TO
ACHIEVE UNIT REPLACEMENT AND FOR ACCESS TO REAR WALL OF MECHANICAL ROOM (FOR
ACCESS TO FRAMING AND INSTALLATION OF NEW DRYWALL AND CONSTRUCTION OF VERTICAL
WALL.
NOTE 6 - RESECURE NATURAL GAS SUPPORTS TO CONCRETE SLAB AND GAS LINE.
NOTE 7 - REUSE EXISTING GALVANIZED FURNACE VENT AND TIE NEW EQUIPMENT TO EXISTING VENT.
NOTE 8 - RELOCATE ALL SURFACE MOUNTED ITEMS TO NEW DRYWALL SURFACE FOLLOWING
INSTALLATION OF DRYWALL TO WOOD WALLS & CEILINGS.
MECH. ROOM
NOTE 3 - REMOVE AND REPLACE THE EXISTING WOOD PLENUM BOX WITH A NEW ALUMINUM INSULATED
PLENUM BOX (HAVING SIMILAR DIMENSIONS – SEE NEW WORK PLAN).
NOTE 4 - REMOVE EXISTING ELECTRICAL DISCONNECTS SERVING UNITS AND REPLACE WITH NEW OF LIKE
MATERIALS/TYPE/CONSTRUCTION. REPLACE CONDUCTORS AND LIQUID FLEX FROM
DISCONNECTS TO OUTSIDE UNITS (ALONG WITH SERVICE TO AIR-HANDLERS) AS WELL AS
THERMOSTAT WIRING (LIQUID FLEX).
GFIGFI
GFIGFI
REPLACE EXISTING NG PIPING FROM
ELBOW INSIDE OF MECH ROOM AND TO
NEW FURNACE UNITS
REFLECTS REVISION DATED 03/29/261
TYPICAL BARRACK BUILDING INTERIOR
PS
FA
C
P
NG PIPING
INTERIOR TEMPERATURE SENSOR. REPLACE WITH
NEW SENSOR AND METAL BOX. NEW SENSOR MUST
BE COMPATIBLE WITH NEW THERMOSTAT
SHEET 5 OF 11
MECH. ROOM
GFIGFI
NOTES:
1. PROVIDE AND INSTALL NEW INSULATED ALUMINUM PLENUM BOX. SEE DETAILS/DRAWINGS.
2. PROVIDE AND INSTALL 5/8" TYPE “X” DRYWALL TO CEILING, UPPER WOOD FRAMED WALL AREAS
AND VERTICAL REAR WALL OF MECHANICAL ROOM. CONSTRUCT AND/OR FRAME NEW VERTICAL
WALL FROM WOOD TOP PLATE TO BOTTOM OF RAFTERS. DRYWALL TO BE UNFINISHED WITH
JOINTS TAPED AND MUDDED. ITEMS INSTALLED ON EXISTING CEILING AND/OR WALL FRAMING
SHALL BE RELOCATED TO THE NEW DRYWALL SURFACE. PENETRATIONS SHALL BE SEALED.
3. PROVIDE AND INSTALL HVAC CONDENSERS, AIR HANDLERS AND NATURAL GAS FURNACES, TO REPLACE EXISTING 5 TON UNITS. INSTALLATION SHALL INCORPORATE NEW LINE SETS, DRYERS, SIGHT GLASSES, INSULATION, CONDENSATE DRAINS, NEW NATURAL GAS PIPING & SUPPORTS, FLEXIBLE CONNECTOR, ETC., FOR A COMPLETE INSTALLATION.
4. REMOVE DUCTWORK AS NECESSARY TO ACCESS REAR WALL AREA OF MECHANICAL ROOM TO
ACCOMPLISH FRAMING AND DRYWALL. REUSE EXISTING DUCTWORK AND PROVIDE NEW 3"
DUCTWRAP INSULATION OVER EXISTING DUCTWORK, AFTER RE-INSTALLATION. PROVIDE NEW
FLEXIBLE CONNECTION AT TOP OF UNITS AND SUPPLY DUCTWORK.
5. PROVIDE AND INSTALL NEW GFIC OUTLETS IN LOCATION SHOWN ON DRAWING.
6. PROVIDE AND INSTALL NEW ELECTRICAL DISCONNECTS, CONDUCTORS AND LIQUID FLEX FROM NEW UNITS
TO DISCONNECTS.
7. PROVIDE SUPPORTS AS NEEDED FOR REFRIGERANT LINE PIPING AND INSULATION. SUPPORTS SHALL INCORPORATE OVERSIZED PVC SLEEVES TO ELIMINATE COMPRESSION OF INSULATION. EXPOSED INSULATION SHALL BE COVERED WITH TYPE II COATING FOR UV PROTECTION OF THE INSULATION. THRU-
WALL SLEEVES SHALL BE RESEALED AFTER INSTALLATION OF THE NEW UNITS.
8. INFERFACE NEW UNITS WITH FIRE ALARM CONTROL PANEL FOR SHUT-OFF OF SYSTEMS IN THE EVENT OF AN ALARM. PROVIDE DUCT DETECTOR WITHIN RETURN AIR DUCT AND CONNECT/INTERFACE TO FIRE
ALARM CONTROL PANEL.
9. PROVIDE AND INSTALL NEW IN-BUILDING TEMPERATURE SENSOR WITHIN ENCLOSED METAL LOCKABLE
WALL-MOUNTED BOX. NEW SENSOR MUST BE COMPATIBLE WITH NEW THERMOSTAT.
REPLACE NG PIPING FROM ABOVE-GRADE PIPING ELBOW INTO
AND INSIDE MECHANICAL ROOM TO NEW UNITS TO INCLUDE
NEW GAS VALVES AND FLEX TO FURNACE. REPLACE EXISTING
NG SUPPORTS WITH NEW
NEW HVAC CONDENSERS, AIR HANDLERS
AND FURNACES. TYPICAL 2 EACH. SEE
SPECS.
CONSTRUCT NEW VERTICAL WALL (TOP OF WOOD
PLATE TO BOTTOM OF RAFTER AND INSTALL
DRYWALL
SD
B
5 6A
5 7
REPLACE HVAC SYSTEMS/MISCELLANEOUS REPAIRS,
TYPICAL BARRACK BUILDING
NEW WORK PLAN
SCALE: ¾” = 1'-0"
GFIGFI
PROVIDE AND INSTALL NEW 2" DIA. SCHEDULE 40
PVC SLEEVE TO ACCOMMODATE NEW NG GAS LINE
RETURN AIR DUCT
SUPPLY
TRANSITION
DUCT
NEW
FURNACE
NEW
FURNACE
NEW
AH-2
NEW
AH-1
NEW INSULATED
ALUMINUM PLENUM BOX
NEW NG LINE
NEW CONDENSATE DRAIN
NEW DISCONNECT NEW DISCONNECT (TYP. BOTH UNITS)
NEW 1" FLEX (TYP. BOTH UNITS)
NEW 1/2" FLEX
NEW REFRIG PIPING W/INSULATION
AND TYPE II COATING ON EXTERIOR
NEW THERMOSTAT FROM
INTERIOR SENSOR
NEW DRYER (TYP. BOTH UNITS)
EXISTING CMU
MECHANICAL ROOM WALL
NEW 1/2" FLEX (TYP. BOTH UNITS)
x
O
.C x
O
.C
RAFTERS @ 16" O.C.
TOP PLATE OF EXTERIOR
BARRACKS WALL
3" THRU WALL SLEEVE (EXTG)
LINE SETS
O/A DUCT
PROVIDE AND INSTALL 5/8" TYPE “X” DRYWALL OVER CEILING
AND VERTICAL WALLS OF MECHANICAL ROOM FRAMING.
CONSTRUCT, FRAME AND INSTALL DRYWALL AROUND
DUCTWORK ON BACK WALL (BARRACKS WALL) FROM CEILING TO
WOOD TOP PLATE. REMOVE, REPLACE AND RE-INSULATE
DUCTWORK TO ACCOMPLISH WALL AND DRYWALL
CONSTRUCTIONL
PROVIDE NEW FLEXIBLE
CONNECTOR
NEW LINE SETS/INSULATION TO NEW
OUTSIDE UNITS
RELOCATE ANY DEVICES AND/OR SUPPORTS ATTACHED
TO WOOD FRAMING TO THE NEW DRYWALL SURFACE.
SEAL ALL-THRU WALL PENETRATIONS.
NEW FIRESTAT
RE-SECURE/REPLACE NG
LINE SUPPORT HERE
RESEAL PENETRATION UPON COMPLETION
OF INSTALLATION (TYP. BOTH SIDES)
SECTION
SCALE: ¾” = 1'-0"
B
5 6
RE-USE AND RE-INSULATE
RETURN AIR DUCT
NEW WORK SECTION
SHEET 6 OF 11
FU
R
N A
C E
V
EN
T
NEW 2" SLEEVE W/
NEW NG LINE
3'-0"
1'-6"
6"
6'-8"
2'-0 ½” 2'-2 ½”2'-5”
1'-4” O.C. 1'-4” O.C. 1'-4” O.C.1'-4” O.C.1'-4” O.C.
3'-4" 3'-4"
.080" ALUMINUM TOP AND FRONT OF PLENUM
BOX. ATTACH WITH SELF TAPPING SCREWS
CENTER SUPPORT ALUMINUM ANGLE (BOLTED OR
WELDED CONNECTION WITH BASE TAPCONED
INTO CONCRETE). TYPICAL TWO EACH
REAR SUPPORT ALUMINUM ANGLE. TAPCON TO REAR CMU
WALL IN CENTER OF PLENUM BOX. TYPICAL ONE EACH
END ALUMINUM SUPPORT ANGLE. TAPCON
TO EXISTING CMU WALL ON TOP AND SIDES
EXISTING REAR CMU WALL
EXISTING CONCRETE SLAB
2" X 2" X 1/8"
X
X
/8
X
X
/8
X
X
/8
EXISTING SIDE CMU WALL
TAPCON FASTENERS
EXISTING CONCRETE SLAB
EXISTING SIDE CMU WALL
OF MECH ROOM
2" X 2" X 1/8"
X
X
/8
X
X
/8
X
X
/8
X
/8
FL
A
T
X
X
/8
X
X
/8
2" X 2" X 1/8"2" X 2" X 1/8"
X
/8
FL
A
T
X
/8
FL
A
T
X
/8
FL
A
T
.080" ALUMINUM TOP AND FRONT
OF PLENUM BOX. ATTACH WITH
SELF TAPPING SCREWS
END ALUMINUM SUPPORT
ANGLE. TAPCON TO EXISTING
CMU WALL ON TOP AND SIDES
ANGLE PLACEMENT MAY
VARY SLIGHTLY WITH
ACTUAL UNIT SIZES
2" X 1/8" FLAT ALUMINUM STOCK – FIELD WELD
TO ALUMINUM ANGLE – TYP AT 16" O.C.
TAPCON FASTENERS
2" X 2" X 1/8" ALUMINUM ANGLE ATTACHED
TO CONCRETE SLAB – FULL WIDTH OF ROOM
SHEET 7 OF 11
SECTION
SCALE: ¾” = 1'-0"
7 7
ELEVATION
A
5 7
NEW PLENUM BOX ELEVATION
TYPICAL BARRACKS MECHANICAL ROOM
FRAMING DETAIL
FURNACE
CUT OUT
FURNACE
CUT OUT
RETURN
CUT OUT
L Lc c 2'-2 ½”2'-0 ½”2'-5”
Lc 3'-4” 3'-4”
6'-8” cL 3 cL L LL ccc
1'-4” 1'-4”1'-4”1'-4” 1'-4”
X
X
/8
X
X
/8
X
X
/8
X
X
/8
2" X 2" X 1/8"
2" X 2" X 1/8"
EXISTING CMU WALL
TAPCON FASTENERS
2" X 1/8" FLAT ALUMINUM STOCK – FIELD WELD
TO ALUMINUM ANGLE – TYP AT 16" O.C.
REAR SUPPORT ALUMINUM ANGLE.
TAPCON TO REAR CMU WALL IN CENTER OF
PLENUM BOX. TYPICAL ONE EACH
CENTER SUPPORT ALUMINUM ANGLE (BOLTED OR
WELDED CONNECTION WITH BASE TAPCONED
INTO CONCRETE). TYPICAL TWO EACH
TOP ALUMINUM CONTINUOUS SUPPORT FRAME.
ALL CONNECTIONS FIELD WELDED AND FRAME
TAPCONED TO CMU AND CONCRETE SLAB
.080" ALUMINUM TOP AND FRONT OF PLENUM
BOX. ATTACH WITH SELF TAPPING SCREWS
NOTES:
(1) APPLY 1" THICK DUCTLINER WITH ADHESIVE TO INTERIOR OF
NEW ALUMINUM (TOP AND FRONT) OF PLENUM BOX.
(2) APPLY FULL BEAD OF SILICONE SEALANT TO ANGLE ALUMINUM
WHERE ATTACHED TO CMU WALLS AND FLOOR. APPLY FULL
BEAD OF SILICONE SEALANT BETWEEN ANGLE ALUMINUM AND
FLAT ALUMINUM STOCK AND .080" ALUMINUM, PRIOR TO
ATTACHING ALUMINUM WITH SCREWS (TO CREATE AIR TIGHT
CHAMBER).
(3) SEAL NEW UNITS AND RETURN AIR DUCTWORK TO NEW
ALUMINUM METAL BOX PLENUM.
(4) FIELD VERIFY FURNACE CUT-OUT AREAS AND RETURN CUT-OUT
WITH NEW MATERIAL/EQUIPMENT PRIOR TO TOP FABRICATION.
MITER AND/OR FIELD
WELD ALUMINUM ANGLE
FRAME. THEN PRE-DRILL
AND BOLT
SHEET 8 OF 11
NEW PLENUM BOX PLAN VIEW
TYPICAL BARRACKS MECHANICAL ROOM
FRAMING DETAIL
NOTES:
NOTE 1 - REPLACE EXISTING CONDENSER UNIT WITH NEW. REPLACE LINE SETS, INSTALL FILTER DRYER, SIGHT GLASS, AND UNICELLUAR INSULATION. PROVIDE TYPE II COATING ON INSULATION EXPOSED TO EXTERIOR AND UV DETERIORATION. REUSE EXISTING REFRIGERANT TUBING SUPPORTS WITH OVERSIZED PVC SUPPORTS (TO ELIMINATE INSULATION COMPRESSION). FOLLOW EXISTING TUBING PATH FOR NEW EQUIPMENT AND LINE SETS. REUSE EXISTING EQUIPMENT PAD.
NOTE 2 - REPLACE EXISTING ELECTRICAL DISCONNECT, LIQUID FLEX AND CONDUCTOR (FROM DISCONNECT TO UNIT) WITH NEW. DISCONNECT SHALL BE NEMA 3R, BREAKER-TYPE AND OF THE SAME AMPACITY AS THE EXISTING DISCONNECT.
NOTE 3 - PROVIDE AND INSTALL NEW GFIC OUTLET IN CASE ALUMINUM BOX WITH PLASTIC PROTECTIVE COVER (FOR FUTURE UNIT SERVICING) NOTE 4 - RESEAL EXISTING THRU-WALL SLEEVE WITH EXPANSION FOAM, AFTER INSTALLATION OF REFRIGERANT LINES, ELECTRICAL AND/OR CONDENSATION PIPING.
NOTE 5 - REPLACE EXISTING THREMOSTAT WITH NEW. REPLACE THERMOSTAT WIRING TO NEW IN-BUILDING SENSOR AND NEW EQUIPMENT.
NOTE 6 - REPLACE AIR-HANDLER, FURNACE, EQUIPMENT STAND, METAL LINED RETURN AIR PLENUM AND DIFFUSER (ON MAIN DUCTWORK) WITH NEW. AFTER REPLACEMENT OF UNIT AND TIEING DUCTWORK BACK TO UNIT, APPLY A COAT OF MASTIC OVER THE EXISTING DUCTWORK INSULATION FROM THE TOP OF THE UNIT TO THE EXISTING OR NEW SUSPENDED CEILING. REPLACE THE EXISTING SUPPLY AIR DIFFUSER ABOVE THE AIR HANDLER WITH NEW OF THE SAME SIZE. LINED RETURN BOX SHALL MATCH THE SIZE OF THE EXISTING BOX AND BE SUPPORTED OFF OF THE EXISTING CONCRETE FLOOR. RECONNECT RETURN AND OUTSIDE AIR DUCTWORK TO NEW BOX. REUSE EXISTING FURNACE VENTS.
NOTE 7 - APPLY MASTIC OVER THE EXISTING DUCTWORK INSULATION FROM THE RETURN BOX UP TO THE NEW CEILING HEIGHT.
NOTE 8 - INSTALL 2' X 2' SUSPENDED CEILING GRID AND CEILING TILE AT A HEIGHT OF 8'-2" (+ OR -) AFF. INSTALL THREE RUNS OF UNISTRUIT TO TOP TRUSS CHORD (EQUALLY SPACED) TO SUPPORT THE NEW GRID AND CEILING SYSTEM. PROVIDE UNFACED INSULATION
AROUND PIPES AND NEW CEILING TO SEAL GAPS IN CEILING SYSTEM.
NOTE 9 – REPLACE THE EXISTING RETURN AIR FILTERS WITHIN SUBJECT BUILDING WITH NEW PLEATED FILTERS OF THE SAME SIZE.
NOTE 10 -PROVIDE AND INSTALL NEW GAS VALVE AND NATURAL GAS FLEX TO EACH NEW FURNACE UNIT(S). THE EXISTING BLACK IRON NG LINE (IN LATRINES) MAY BE RE-USED.
SHEET 9 OF 11
TT
TT
O U
TS
ID
E A
IR
O
U
TS
ID
E
A
IRIN
ST
A
-H O
T R
A C
K
225A
TT
TT
O U
TS
ID
E A
IR
O
U
TS
ID
E
A
IRIN
ST
A
-H O
T R
A C
K
225A
5 67
7 6
GFIGFI
GFIGFI
9'-9" 9'-9"
PARTIAL PLAN – DOUBLE LATRINE MECHANICAL ROOM
NEW WORK PLAN - TYPICAL FOR BUILDINGS 13306 & 13308
SCALE: ¼” = 1'-0"
PARTIAL PLAN – DOUBLE LATRINE MECHANICAL ROOM
EXISTING CONDITIONS - TYPICAL FOR BUILDINGS 13306 & 13308
SCALE: ¼” = 1'-0"
1 ft. 11 in.
SUCTION LINE
LIQUID LINE
FURNACE
AIR HANDLER
FU
R
N A
C E
V
EN
T
O U
TS
ID
E A
IR
D
U C
T
CONDENSATE DRAIN
LINE
RETURN AIR
DUCT
UNIT STAND WITH INSULATED GALVANIZED
PLENUM BOX UNDERNEATH AND RETURN
TRANSITION BOX (TO BE REPLACED) –
TYPICAL FOR UNITS WITHIN BUILDINGS
13306 & 13308
RETURN TRANSITION
BOX
THERMOSTAT TO BE
REPLACED – TYPICAL FOR
ALL UNITS
EXISTING
CONCRETE SLAB
SUPPLY GRILLE – REPLACE ON UNITS 13306 “B” & 13308 “A”
TYPICAL LATRINE INTERIOR UNIT ELEVATION
SCALE: 1"= 1'-0"
EXISTING SUSPENDED CEILING SYSTEM – TYPICAL FOR MECH
ROOMS IN BUILDINGS 13306 & 13308
O
R
NOTE: SOME CONFIGURATIONS
MAY VARY SLIGHTLY FROM THAT
SHOWN ON DRAWINGS
PATCH AND REPAIR EXISTING DUCT
INSULATION ON RETURN AIR AND SUPPLY
DUCTWORK AND PROVIDE COAT OF MASTIC
OVER EXISTING INSULATION UP TO
SUSPENDED CEILING HEIGHT
RETURN LINED
PLENUM BOX
(UNDER EQUIP.
STAND)
SHEET 10 OF 11
LINED RETURN
TRANSITION BOX
(24 ½” X 17 ½” X 14"H)
RETURN LINED
PLENUM BOX
(25 ½” X 20" X
17")
2" x 2" x 3/32" ANGLE
ALUMINUM FRAME LEGS (TYP. 4
PER UNIT)
2" x 2" x .0375 ANGLE
GALVALUME FOR TOP OF
FRAME
22 ½”
EQUIP. STAND
EQ
U
IP
. S
TA
N D
NEW LINED RETURN
TRANSITION BOX
(24 ½” X 17 ½” X
14"H)
NEW RETURN
LINED PLENUM
BOX (25 ½” X 20"
X 17")
EX
IS
TI
N
G O
U
TS
ID
E
A
IR
D U
C T
EXISTING RETURN
AIR DUCT – REPAIR
CUTS/TEARS IN
INSULATION AND
COAT WITH MASTIC
NEW UPFLOW
FURNACE
NEW EQUIPMENT
STAND
EXISTING CONCRETE FLOOR
NEW ANGLE SUPPORT AT
CORNERS
PROVIDE NEW EQUIPMENT
STANDS, PRE-FABRICATED
RETURN LINED PLENUM BOX
AND LINED RETURN TRANSITION
BOX FOR EACH UNIT
NEW METAL LINED RETURN PLENUM AND
TRANSITION BOX
NEW WORK PLAN VIEW
TYPICAL FOR BUILDINGS 13306 & 13308
SCALE: ¾” = 1'-0"
RETURN DUCT – TAPE TEARS/RIPS IN
INSULATION AND COAT WITH MASTIC TO NEW
CEILING HEIGHT
NEW METAL LINED RETURN PLENUM AND TRANSITION BOX
PARTIAL ELEVATION
NEW WORK PLAN VIEW
TYPICAL FOR BUILDINGS 13306 & 13308
SCALE: ¾” = 1'-0"
NOTE:
CONTRACTOR TO VERIFY PHYSICAL SIZE OF STAND, LINED PLENUM BOX
AND RETURN TRANSITION BOX PRIOR TO FABRICATION AND SHALL
MATCH THE SIZE OF THE EXISTING PRIOR TO REPLACMENT WITH NEW,
TO MIDIGATE ALTERING EXISTING CONNECTING DUCTWORK.
SHEET 11 OF 11
| Replace HVAC Systems & Miscellanous Repairs, 13300 Block (19 Brks & 2 Latrines) - Revised.vsdx |
| Cover - 1 |
| Exist Cond -2 |
| EC SECT A - 3 |
| Demo Plan -4 |
| NW Plan-5 |
| NW Sect -6 |
| PB Det - 7 |
| PB Plan -8 |
| Page-9 |
| Page-10 |
| Page-11 |
File details come from the government source that posted it. Updated .