10324 Inside unit.jpg

JPG image 94 KB Posted

Attached to
Interior Painting Bldg 2 Clay National Guard
Solicitation number
W912JM25RGH01
Issued by

About this file

This image shows an HVAC (heating, ventilation, and air conditioning) system installation in what appears to be a basement or mechanical room. The system consists of two side-by-side furnace or boiler units housed in metal cabinets with glass front panels, revealing internal components including fans, heat exchangers, and control wiring. The units are connected to an extensive network of metallic ductwork that extends upward and across the ceiling area.

The installation features insulated ductwork wrapped in reflective material, copper gas lines, and appears to be a dual-zone or high-capacity heating system suitable for a large residential or small commercial building. The mechanical room has concrete block walls and wooden ceiling joists, with what appears to be a red electrical panel visible on the right side of the image.

View the file

Other files

File Type Posted
Clay Bldg 2 Second Floor Plan 2021.pdf PDF
10324 Inside.jpg JPG image
10324 Fire Alarm Control Panel.pptx PPTX presentation
9310 wall to install new HVAC system.jpg JPG image
Clay Bldg 2 First Floor Plan 2021.pdf PDF
Questions from industry.docx DOCX document
10324 Outside unit.jpg JPG image
Solicitation - W912JM25RA001.pdf PDF
SOW Bldg 122D RTI 2 Paint Interior Walls.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .