SOW Bldg 122D RTI 2 Paint Interior Walls.docx

DOCX document 32 KB Posted

Attached to
Interior Painting Bldg 2 Clay National Guard
Solicitation number
W912JM25RGH01
Issued by

About this file

This Statement of Work (SOW) details an interior painting project for Building 2 at the Clay National Guard Center in Marietta, Georgia. The project requires comprehensive interior wall painting across the first and second floors, including hallways, administration offices, stair walls, day rooms, and latrines. Key requirements include conducting a lead paint survey, coordinating furniture relocation, performing surface preparation (scraping, caulking, patching, and priming), and submitting paint color samples for approval.

The contract is a Firm Fixed Price type with a performance period not exceeding 120 calendar days from the notice to proceed. The contractor must comply with environmental regulations, handle potential lead paint and asbestos materials, develop a Quality Control Plan, and submit various documentation including a construction project schedule, material samples, and environmental protection plans. Work must be performed between 0800-1630 hours Monday through Friday, excluding federal holidays, with strict safety, security, and access requirements for contractor personnel.

View the file

Other files

File Type Posted
Clay Bldg 2 Second Floor Plan 2021.pdf PDF
10324 Inside.jpg JPG image
10324 Fire Alarm Control Panel.pptx PPTX presentation
10324 Inside unit.jpg JPG image
9310 wall to install new HVAC system.jpg JPG image
Clay Bldg 2 First Floor Plan 2021.pdf PDF
Questions from industry.docx DOCX document
10324 Outside unit.jpg JPG image
Solicitation - W912JM25RA001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. General:

a. Work to be Done: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to complete all work on painting of all interior walls, and to coordinate of furniture removal, as described below scope of work. The contractor shall perform to the standards in this contract and all works shall comply to the current editions of all applicable codes and standards.

b. Background: Building 2 is currently used as a military classroom facility and administration offices of the RTI. The building’s existing interior hallways and interior classrooms are stained, and dirty.

c. Objectives: The purpose of the requirements is to provide new paint in the interior walls and hallways.

2. Scope of Work:

Preparation and Construction are not limited of the following:

Contractor shall perform to the best construction management practice industry standards to paint the interior walls to include but not limited of the following:

a. Contractor shall conduct Interior Paint on building 2.

b. Contractor shall coordinate furniture relocation to the other rooms on the first floor of the administration rooms, and for the second floor.. Provide at least one week notice for preparation with the Users U.S. Army personnel of building 2.

c. Building 2 will be occupied by the User during interior walls painting work.

d. Contractor shall conduct interior walls painting to include the hallways, administration offices, stair walls, day rooms, latrines, and other interior walls on the 1st floor, and 2nd floor. Prior to painting to commence, Contractor shall include scraping, caulking, patching, and priming of the walls. Provide paint color samples for approval with CFMO.

e. Contractor shall conduct lead paint survey test and analysis reports for interior walls.

f. Non – Historic building painting shall coordinate with DPW Master Planning Division to ensure consistency with the Installation Design Guide.

g. Contractor shall provide workmanship warranty of all interior wall paintings.

h. The contractor shall leave the work site clean and free of debris when the workday end s. The contractor shall dispose of all debris and rubbish in an off-post site at no additional cost to the government. The government dumpster shall not be used for construction materials disposal.

i. Contractor shall coordinate furniture relocation and provide at least one week notice with users. The contractor shall divide the work at least into three phases. Upon completion of each phase, COR will receive it from the contractor and hand it over to the unit occupying the building before proceeding to the next phase.

3. Submittal: The contractor shall provide at a minimum the following submittals for review by the Government. The government has ten days to review and return submittals once they approved. Submittals shall be coordinated with COR/Contracting officer to their emails.

a. Construction project schedule in phases.

b. Materials sample and or cut sheets of paint color design and manufacture’s product.

4. Environmental Considerations:

a. General: Project must operate in full compliance with the most recent Federal, State, and local environmental laws, regulations, and programs.

ii. Lead paint and asbestos containing materials shall be handled according to applicable laws and regulations with a lead paint certified contractor.

iii. Prior to commencement of the project, copies of survey results, abatement plans, and contractor certifications shall be submitted to CFMO.

iv. At the completion of the project, copies of air monitoring results and completion reports shall be submitted to the CFMO.

v. All ACM related submittals must be sent to CFMO.

5. Contractor requirements after award:

a. Provide contract progress schedule.

b. Submit for review all paint colors.

b. Hold regular progress meetings with Government POC.

6. Contractor requirements after construction completion:

a. Provide warranties that shall cover all material and labor for repair and replacement.

7. Period of Performance: The period of performance shall not exceed 120 calendar days starting the date of issuance of the notice to proceed – includes lead time for material procurement and deliveries.

8. General Information:

a. Federal Observed Holidays: The Contractor shall not be required to perform repairs or enhancement work on Federal Holidays. Below is the observed holiday’s schedule:

New Year’s Day1st day of January
Martin Luther King, Jr. Day3rd Monday of January
President’s Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth Day19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veteran’s Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

b. Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0800 – 1630 Monday thru Friday except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

c. Place of Performance: The work to be performed under this contract is at building 2, CNGC Marietta, Georgia.

d. Quality Control Plan (QCP): The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with this SOW. The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to their QC system.

e. Type of Contract: The Government will award a Firm Fixed Price contract.

f. Security Requirements: The Contractor shall submit a list of employees to the Contracting Officer Representative (COR) for security access processing and approval. The list shall contain the employee’s full name, state driver’s license number, social security number, and date of birth. Contractor personnel shall be prepared to be searched by the installation security guard force.

g. Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment and materials shall be secured.

h. Inspection and Acceptance: The contractor shall coordinate with the COR for completion inspection on each phase of construction and final close-out inspection and acceptance at each of the project.

i. Safety Requirements: No person shall be subjected to work in an unsafe or dangerous environment. Contractor safety will be governed by AR 385-10, paragraphs 3-5, 3-8, and Chapter 4. AR 385-10 may be made available through the COR upon request.

j. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially about changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

k. The Contractor shall develop and provide an Environmental Protection Plan (EPP): The EPP shall clearly demonstrate how the contractor will adhere to environmental compliance requirements, including (but not limited to): air quality; biological resources (special status species, migratory birds, invasive species, etc.); cultural resources (historic buildings, archaeological sites, Native American sacred sites); hazardous materials and waste (including hazardous materials mitigation plan); noise, non-hazardous solid waste (including solid waste minimization and diversion plan); spill response; storm water management; traffic; and water resources.

l. Access and General Protection/Security Policy and Procedure: Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshall, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

m. Contractors that do not require CAC but require access to a DoD Facility or Installation: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Data Base (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or at OCONUS locations, in accordance with status of forces agreement and other regulations.

n. Personal Identity Verification of Contractor Personnel (Jan 2011) - Clause:

a. The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 ( HSPD-12 ), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

b. The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government.

i. When no longer needed for contract performance.

ii. Upon completion of the Contractor employee’s employment.

iii. Upon contract completion or termination.

v. The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

vi. The Contractor shall insert the substance of clause, including this paragraph, in all subcontracts when the subcontractor’s employees are required to have routine physical access to a Federally controlled facility and/or routine access to a Federally controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.