This technical drawing set details the HVAC replacement project for Building 10324 at the Georgia Garrison Training Center. The comprehensive 8-sheet plan includes detailed specifications for removing and replacing existing HVAC systems, including condensers, air handlers, natural gas furnaces, and the plenum box. Key technical elements include replacing the existing wooden plenum box with a new .080" aluminum insulated plenum box, installing 5/8" Type X drywall on ceiling and wall surfaces, and implementing new electrical connections, refrigerant lines, and ductwork.
The project scope involves precise mechanical room modifications, including new support framing, electrical disconnects, and interface with the existing fire alarm control panel. Specific technical requirements include installing new line sets with UV-protected insulation, resealing wall penetrations, relocating surface-mounted devices, and ensuring compatibility with existing infrastructure. The drawings provide granular details on mounting methods, material specifications, and installation techniques, with particular attention to supporting aluminum framing, fastening methods, and creating an airtight mechanical system integration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10324 Inside unit.jpg | JPG image | |
| 9310 wall to install new HVAC system.jpg | JPG image | |
| 10324 Inside.jpg | JPG image | |
| 10324 Fire Alarm Control Panel.pptx | PPTX presentation | |
| 10324 Outside unit.jpg | JPG image | |
| Building 9310.pdf | ||
| SCOPE OF WORK REPLACE HVAC LDC.docx | DOCX document | |
| Solicitation - W912JM25QA020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE HVAC SYSTEMS
BUILDING NO. 10324
GEORGIA GARRISON TRAINING CENTER
SHEET 1 OF 8
TT
BARRACKS
BUILDING 10324
PS
CA
SD
FA
C
P
O/A
FV
RA
SAD SAD DISCONNECT
CONDENSER ON CONC.
PAD
NG PIPING
INTERIOR TEMPERATURE
SENSOR
CA
FU1 FU2
AHU1 AHU2
CU1 CU2
ABBREVIATIONS:
PS – FIRE ALARM PULL STATION
CA – COMBUSTIBLE AIR DUCT
O/A – OUTSIDE AIR DUCT
RA – RETURN AIR DUCT
SAD – SUPPLY AIR DUCT
SD – SMOKE DETECTOR
AHU – AIR HANDLING UNIT
FU – FURNACE UNIT
FV – FURNACE VENT
CU – CONDENSER UNIT
LIQUID FLEX
REPLACE PLENIUM BOX AND HVAC UNITS,
BUILDING 10324
EXISTING CONDITIONS
SCALE: ¾” = 1'-0"
SHEET 2 OF 8
A
2 3
RETURN AIR DUCT
SUPPLY TRANSITION
DUCT
FURNACEFURNACE
AH-2
AH-1
PLENUM BOX
NG LINE
CONDENSATE DRAIN
DISCONNECT DISCONNECT
1" FLEX
1/2" FLEX
REFRIG PIPING
THERMOSTAT FROM
INTERIOR SENSOR
DRYER
CMU MECHANICAL ROOM
WALL
1/2" FLEX
x
O
.C x
O
.C
RAFTERS @ 16" O.C.
FU
R
N A
C E
V
EN
T
TOP PLATE OF EXTERIOR
BARRACKS WALL
3" THRU WALL
SLEEVE
LINE SETS
O/A DUCT
SECTION
SCALE: ¾” = 1'-0"
A
2 3EXISTING CONDITIONS SECTION
SHEET 3 OF 8
BARRACKS BUILDING 10324
PS
FA
C
P
NG PIPING
INTERIOR TEMPERATURE
SENSOR
REPLACE PLENIUM BOX AND HVAC UNITS, BUILDING 10324
DEMOLITION
SCALE: ¾” = 1'-0"
SHEET 4 OF 8
1 1
NOTES:
NOTE 1 - REMOVE AND REPLACE OUTSIDE CONDENSER UNITS, FURNACES, AIR HANDLERS, LINE SETS, INSULATION AND RELATED WIRING (FROM DISCONNECTS TO UNITS). TYPICAL TWO SETS OF
SYSTEMS CONTROLLED BY ONE THERMOSTAT.
NOTE 2 - REMOVE AND REPLACE NATURAL GAS FURNACES AND AIR HANDLERS FROM PLENUM BOX TO
TRANSITION DUCTWORK, TO ACHIEVE REMOVAL OF UNITS. EXISTING NATURAL GAS PIPING
AND CONDENSATE DRAIN PIPING MAY REMAIN AND BE REUSED.
NOTE 5 - REMOVE AND REPLACE SUPPLY AND RETURN AIR DUCTWORK AND INSULATION AS NEEDED TO
ACHIEVE UNIT REPLACEMENT AND FOR ACCESS TO REAR WALL OF MECHANICAL ROOM (FOR
ACCESS TO FRAMING AND INSTALLATION OF NEW DRYWALL AND CONSTRUCTION OF VERTICAL
WALL.
NOTE 6 - RESECURE NATURAL GAS SUPPORTS TO CONCRETE SLAB AND GAS LINE.
NOTE 7 - REUSE EXISTING GALVANIZED FURNACE VENT AND TIE NEW EQUIPMENT TO EXISTING VENT.
NOTE 8 - RELOCATE ALL SURFACE MOUNTED ITEMS TO NEW DRYWALL SURFACE FOLLOWING
INSTALLATION OF DRYWALL TO WOOD WALLS & CEILINGS.
NOTE 9 - REMOVE EXISTING INCANDESCENT LIGHT FIXTURE AND REPLACE WITH NEW LED 4'
WEATHERPROOF FIXTURE. RECONNECT EXISTING WIRING/SWITCHING.
MECH. ROOM
NOTE 3 - REMOVE AND REPLACE THE EXISTING WOOD PLENUM BOX WITH A NEW ALUMINUM INSULATED
PLENUM BOX (HAVING SIMILAR DIMENSIONS – SEE NEW WORK PLAN).
NOTE 4 - REMOVE EXISTING ELECTRICAL DISCONNECTS SERVING UNITS AND REPLACE WITH NEW OF LIKE
MATERIALS/TYPE/CONSTRUCTION. REPLACE CONDUCTORS AND LIQUID FLEX FROM
DISCONNECTS TO OUTSIDE UNITS (ALONG WITH SERVICE TO AIR-HANDLERS) AS WELL AS
THERMOSTAT WIRING (LIQUID FLEX).
BARRACKS BUILDING 10324
PS
FA
C
P
NG PIPING
INTERIOR TEMPERATURE SENSOR
REPLACE PLENIUM BOX AND HVAC UNITS, BUILDING 10324
NEW WORK PLAN
SCALE: ¾” = 1'-0"
SHEET 5 OF 8
MECH. ROOM
GFIGFI
GFIGFI
NOTES:
1. PROVIDE AND INSTALL NEW INSULATED ALUMINUM PLENUM BOX. SEE DETAILS/DRAWINGS.
2. PROVIDE AND INSTALL 5/8" TYPE “X” DRYWALL TO CEILING, UPPER WOOD FRAMED WALL AREAS
AND VERTICAL REAR WALL OF MECHANICAL ROOM. CONSTRUCT AND/OR FRAME NEW VERTICAL
WALL FROM WOOD TOP PLATE TO BOTTOM OF RAFTERS. DRYWALL TO BE UNFINISHED WITH
JOINTS TAPED AND MUDDED. ITEMS INSTALLED ON EXISTING CEILING AND/OR WALL FRAMING
SHALL BE RELOCATED TO THE NEW DRYWALL SURFACE. PENETRATIONS SHALL BE SEALED.
3. PROVIDE AND INSTALL HVAC CONDENSERS, AIR HANDLERS AND NATURAL GAS FURNACES, TO REPLACE EXISTING 5 TON UNITS. INSTALLATION SHALL INCORPORATE NEW LINE SETS, DRYERS, SIGHT GLASSES, INSULATION, CONDENSATE DRAINS, FLEXIBLE CONNECTOR, ETC., FOR A
COMPLETE INSTALLATION.
4. REMOVE DUCTWORK AS NECESSARY TO ACCESS REAR WALL AREA OF MECHANICAL ROOM TO
ACCOMPLISH FRAMING AND DRYWALL. REUSE EXISTING DUCTWORK AND PROVIDE NEW 3"
DUCTWRAP INSULATION OVER EXISTING DUCTWORK, AFTER RE-INSTALLATION. PROVIDE NEW
FLEXIBLE CONNECTION AT TOP OF UNITS AND SUPPLY DUCTWORK.
5. PROVIDE NEW 4' WEATHERPROOF LIGHT FIXTURE TO REPLACE EXISTING INCANDESCENT FIXTURE.
EXTEND ELECTRICAL AND SWITCHING FROM EXISTING SWITCH.
6. PROVIDE AND INSTALL NEW GFIC OUTLETS IN LOCATION SHOWN ON DRAWING.
7. PROVIDE AND INSTALL NEW ELECTRICAL DISCONNECTS, CONDUCTORS AND LIQUID FLEX FROM NEW UNITS
TO DISCONNECTS.
8. PROVIDE SUPPORTS AS NEEDED FOR REFRIGERANT LINE PIPING AND INSULATION. SUPPORTS SHALL INCORPORATE OVERSIZED PVC SLEEVES TO ELIMINATE COMPRESSION OF INSULATION. EXPOSED INSULATION SHALL BE COVERED WITH TYPE II COATING FOR UV PROTECTION OF THE INSULATION. THRU-
WALL SLEEVES SHALL BE RESEALED AFTER INSTALLATION OF THE NEW UNITS.
9. INFERFACE NEW UNITS WITH FIRE ALARM CONTROL PANEL FOR SHUT-OFF OF SYSTEMS IN THE EVENT OF AN ALARM. PROVIDE DUCT DETECTOR WITHIN RETURN AIR DUCT AND CONNECT/INTERFACE TO FIRE
ALARM CONTROL PANEL.
NG PIPING CAN BE REUSED. CONTRACTOR TO VERIFY
REGULATOR SIZE FOR EQUIPMENT. PROVIDE NEW FLEX
DOWNSTREAM FOR GAS VALVES AT UNITS.
NEW HVAC CONDENSERS, AIR HANDLERS AND
FURNACES. TYPICAL 2 EACH. SEE SPECS.
CONSTRUCT NEW VERTICAL WALL (TOP OF WOOD PLATE TO
BOTTOM OF RAFTER AND INSTALL DRYWALL
SD
B
5 6A
5 7
NEW 4' LED
WEATHERPROOF FIXTURE
RETURN AIR DUCT
SUPPLY
TRANSITION
DUCT
NEW
FURNACE
NEW
FURNACE
NEW
AH-2
NEW
AH-1
NEW INSULATED
ALUMINUM PLENUM BOX
NG LINE
NEW CONDENSATE DRAIN
NEW DISCONNECT NEW DISCONNECT (TYP. BOTH UNITS)
NEW 1" FLEX (TYP. BOTH UNITS)
NEW 1/2" FLEX
NEW REFRIG PIPING W/INSULATION
AND TYPE II COATING ON EXTERIOR
NEW THERMOSTAT FROM
INTERIOR SENSOR
NEW DRYER (TYP. BOTH UNITS)
EXISTING CMU
MECHANICAL ROOM WALL
NEW 1/2" FLEX (TYP. BOTH UNITS)
x
O
.C x
O
.C
RAFTERS @ 16" O.C.
TOP PLATE OF EXTERIOR
BARRACKS WALL
3" THRU WALL SLEEVE (EXTG)
LINE SETS
O/A DUCT
PROVIDE AND INSTALL 5/8" TYPE “X” DRYWALL OVER CEILING
AND VERTICAL WALLS OF MECHANICAL ROOM FRAMING.
CONSTRUCT, FRAME AND INSTALL DRYWALL AROUND
DUCTWORK ON BACK WALL (BARRACKS WALL) FROM CEILING TO
WOOD TOP PLATE. REMOVE, REPLACE AND RE-INSULATE
DUCTWORK TO ACCOMPLISH WALL AND DRYWALL
CONSTRUCTIONL
PROVIDE NEW FLEXIBLE
CONNECTOR
NEW LINE SETS/INSULATION TO NEW
OUTSIDE UNITS
RELOCATE ANY DEVICES AND/OR SUPPORTS ATTACHED
TO WOOD FRAMING TO THE NEW DRYWALL SURFACE.
SEAL ALL-THRU WALL PENETRATIONS.
NEW FIRESTAT
RE-SECURE/REPLACE NG
LINE SUPPORT HERE
RESEAL PENETRATION UPON COMPLETION
OF INSTALLATION (TYP. BOTH SIDES)
SECTION
SCALE: ¾” = 1'-0"
B
5 6
RE-USE AND RE-INSULATE
RETURN AIR DUCT
NEW WORK SECTION
SHEET 6 OF 8
FU
R
N A
C E
V
EN
T
3'-0"
1'-6"
6"
6'-8"
2'-0 ½” 2'-2 ½”2'-5”
1'-4” O.C. 1'-4” O.C. 1'-4” O.C.1'-4” O.C.1'-4” O.C.
3'-4" 3'-4"
.080" ALUMINUM TOP AND FRONT OF PLENUM
BOX. ATTACH WITH SELF TAPPING SCREWS
CENTER SUPPORT ALUMINUM ANGLE (BOLTED OR
WELDED CONNECTION WITH BASE TAPCONED
INTO CONCRETE). TYPICAL TWO EACH
REAR SUPPORT ALUMINUM ANGLE. TAPCON TO REAR CMU
WALL IN CENTER OF PLENUM BOX. TYPICAL ONE EACH
END ALUMINUM SUPPORT ANGLE. TAPCON
TO EXISTING CMU WALL ON TOP AND SIDES
EXISTING REAR CMU WALL
EXISTING CONCRETE SLAB
2" X 2" X 1/8"
X
X
/8
X
X
/8
X
X
/8
EXISTING SIDE CMU WALL
TAPCON FASTENERS
EXISTING CONCRETE SLAB
EXISTING SIDE CMU WALL
OF MECH ROOM
2" X 2" X 1/8"
X
X
/8
X
X
/8
X
X
/8
X
/8
FL
A
T
X
X
/8
X
X
/8
2" X 2" X 1/8"2" X 2" X 1/8"
X
/8
FL
A
T
X
/8
FL
A
T
X
/8
FL
A
T
.080" ALUMINUM TOP AND FRONT
OF PLENUM BOX. ATTACH WITH
SELF TAPPING SCREWS
END ALUMINUM SUPPORT
ANGLE. TAPCON TO EXISTING
CMU WALL ON TOP AND SIDES
ANGLE PLACEMENT MAY
VARY SLIGHTLY WITH
ACTUAL UNIT SIZES
2" X 1/8" FLAT ALUMINUM STOCK – FIELD WELD
TO ALUMINUM ANGLE – TYP AT 16" O.C.
TAPCON FASTENERS
2" X 2" X 1/8" ALUMINUM ANGLE ATTACHED
TO CONCRETE SLAB – FULL WIDTH OF ROOM
SHEET 7 OF 8
SECTION
SCALE: ¾” = 1'-0"
7 7
ELEVATION
SCALE: ¾” = 1'-0"
A
5 7
NEW PLENUM BOX ELEVATION
FRAMING DETAIL
FURNACE
CUT OUT
FURNACE
CUT OUT
RETURN
CUT OUT
L Lc c 2'-2 ½”2'-0 ½”2'-5”
Lc 3'-4” 3'-4”
6'-8” cL 3 cL L LL ccc
1'-4” 1'-4”1'-4”1'-4” 1'-4”
X
X
/8
X
X
/8
X
X
/8
X
X
/8
2" X 2" X 1/8"
2" X 2" X 1/8"
EXISTING CMU WALL
TAPCON FASTENERS
2" X 1/8" FLAT ALUMINUM STOCK – FIELD WELD
TO ALUMINUM ANGLE – TYP AT 16" O.C.
REAR SUPPORT ALUMINUM ANGLE.
TAPCON TO REAR CMU WALL IN CENTER OF
PLENUM BOX. TYPICAL ONE EACH
CENTER SUPPORT ALUMINUM ANGLE (BOLTED OR
WELDED CONNECTION WITH BASE TAPCONED
INTO CONCRETE). TYPICAL TWO EACH
TOP ALUMINUM CONTINUOUS SUPPORT FRAME.
ALL CONNECTIONS FIELD WELDED AND FRAME
TAPCONED TO CMU AND CONCRETE SLAB
.080" ALUMINUM TOP AND FRONT OF PLENUM
BOX. ATTACH WITH SELF TAPPING SCREWS
NOTES:
(1) APPLY 1" THICK DUCTLINER WITH ADHESIVE TO INTERIOR OF
NEW ALUMINUM (TOP AND FRONT) OF PLENUM BOX.
(2) APPLY FULL BEAD OF SILICONE SEALANT TO ANGLE ALUMINUM
WHERE ATTACHED TO CMU WALLS AND FLOOR. APPLY FULL
BEAD OF SILICONE SEALANT BETWEEN ANGLE ALUMINUM AND
FLAT ALUMINUM STOCK AND .080" ALUMINUM, PRIOR TO
ATTACHING ALUMINUM WITH SCREWS (TO CREATE AIR TIGHT
CHAMBER).
(3) SEAL NEW UNITS AND RETURN AIR DUCTWORK TO NEW
ALUMINUM METAL BOX PLENUM.
(4) FIELD VERIFY FURNACE CUT-OUT AREAS AND RETURN CUT-OUT
WITH NEW MATERIAL/EQUIPMENT PRIOR TO TOP FABRICATION.
MITER AND/OR FIELD
WELD ALUMINUM ANGLE
FRAME. THEN PRE-DRILL
AND BOLT
SHEET 8 OF 8
NEW PLENUM BOX PLAN VIEW
FRAMING DETAIL
SCALE: ¾” = 1'-0"
| Replace HVAC Units & Plenum Box, Bldg 10324 - Revised.vsdx |
| Cover - 1 |
| Exist Cond -2 |
| EC SECT A - 3 |
| Demo Plan -4 |
| NW Plan-5 |
| NW Sect -6 |
| PB Det - 7 |
| PB Plan -8 |
File details come from the government source that posted it. Updated .