PRQE172428_Addendum_2.pdf

PDF 406 KB Posted

Attached to
Replace EPDM Roofs Bldg. 48 Federal contract opportunity
Solicitation number
W912JC-18-B-5003
Issued by
Department of the Army

About this file

PRQE 172428 Addendum 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace EPDM Roofs Bldg. 48, newest first.
File Type Posted
W912JC-18-C-5004.pdf PDF
B48_Roof_Abstract_of_Offers.pdf PDF
AMENDMENT_2_VUVB_109002_Range_Training_Support_Facilities.pdf PDF
RFI_W912JC-18-B-5003_–_Bldg._48_Roof.pdf PDF
PRQE172428_Addendum_1.pdf PDF
TPO_Spec_075400L.pdf PDF
AMENDMENT_1_PRQE172428_Replace_Building_48_EPDM_Roofs.pdf PDF
Sheet_S-2_Add1.pdf PDF
SITE_VISIT_Sign_in_Sheet_B48_EPDM_Roofs.pdf PDF
Pre-Proposal_Minutes_B48_Roof_Project.pdf PDF
W912JC-18-B-5003.pdf PDF
SITE_VISIT_INFORMATION_B48_EPDM_Roofs.pdf PDF
184_KANG_CES_Specifications.pdf PDF
Wage_Determination.pdf PDF
PRQE172478_Drawings.pdf PDF
PRQE_172478_Replace_B48_EPDM_Roof_Submittal_Listing.xlsx XLSX spreadsheet
PRQE172428_B48_EPDM_Roofs_SOW.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 2

REPLACE BLDG 48 EPDM ROOFS

KANSAS AIR NATIONAL GUARD, McCONNELL AFB

PRQE172478

29 June 2018

This Addendum consists of 2 Letter size Details of existing roof conditions at bldg. 48 and clarifications to new roof installation.

ADDITIONAL DETAILS

ADD 2-1 EXISTING ROOF CONDITIONS – Two letter size drawings of original details of the roof at Area 2. Leave existing sloped light weight concrete in place. Remove all roofing materials down to concrete. There are two patches in the roof from removed mechanical hoods. The filler in this area is unknown. Replace or modify the filler material at these openings to bring opening flush with concrete to create a uniform base for 5/8" DensDeck. Remove and replace the existing roof drain with a new 2” commercial grade cast iron dome roof drain and connect to existing 2” pipe drain.

Replace pitch pans with boots.