QUESTIONS_AND_ANSWERS.docx

DOCX document 29 KB Posted

Attached to
Command Post Console
Solicitation number
W912JB17T4016
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
QUESTIONS_AND_ANSWERS.docx DOCX document
TIA-607-B.pdf PDF
TIA-569-C.pdf PDF
17T4016_Attachment_1Base_Access.docx DOCX document
Command_Post_Raw_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO:

W912JB-17-T-4016

Command Post Console as of 22 Mar 2017 @ 10:02am

Dated: 13 March 2017

Q1. Item (V) in the Synopsis requires the product to be EMSEC Compliant. I was wondering what the requirements were to be EMSEC complaint? We can’t seem to find the answer online.

A1. The computers, monitors, cables, etc need their separation and nothing laying on metal.

Dated: 13 March 2017

Q2. What is the console vendors responsibility for EMSEC compliance?

A2. The computers, monitors, cables, etc need their separation and nothing laying on metal.

Q3. Will the console vendor be responsible for supplying strictly EMSEC enclosures for workstation/computer (CPU)?

A3. No

Q4. Or will the console vendor be responsible for supplying an all in one solution with the computer, monitor, equipment and cable management?

A3. No

Q5. Which of the following standards will we be required to meet with our scope of the project?

There are three shielding standards for TEMPEST/EMSEC systems NATO SDIP-27 Level A and USA NSTISSAM http://t.sidekickopen68.com/e1t/c/5/f18dQhb0S7lC8dDMPbW2n0x6l2B9nMJW7t5XYg8r4TMTW5vMzV-4Xq_GjW7fsFDW56dvWPf8B2kn402?t=https%3A%2F%2Fen.wikipedia.org%2Fwiki%2FNational_Security_Telecommunications_and_Information_Systems_Security_Advisory_Memoranda&si=6752696681103360&pi=5c7d160a-a330-40e5-bfad-b7fba4942f24 Level I NATO SDIP-27 Level B and USA NSTISSAM http://t.sidekickopen68.com/e1t/c/5/f18dQhb0S7lC8dDMPbW2n0x6l2B9nMJW7t5XYg8r4TMTW5vMzV-4Xq_GjW7fsFDW56dvWPf8B2kn402?t=https%3A%2F%2Fen.wikipedia.org%2Fwiki%2FNational_Security_Telecommunications_and_Information_Systems_Security_Advisory_Memoranda&si=6752696681103360&pi=5c7d160a-a330-40e5-bfad-b7fba4942f244 Level II NATO SDIP-27 Level C and USA NSTISSAM http://t.sidekickopen68.com/e1t/c/5/f18dQhb0S7lC8dDMPbW2n0x6l2B9nMJW7t5XYg8r4TMTW5vMzV-4Xq_GjW7fsFDW56dvWPf8B2kn402?t=https%3A%2F%2Fen.wikipedia.org%2Fwiki%2FNational_Security_Telecommunications_and_Information_Systems_Security_Advisory_Memoranda&si=6752696681103360&pi=5c7d160a-a330-40e5-bfad-b7fba4942f24 Level III

A5. None, there is no NATO on DoD US for TEMPEST/EMSEC.

Dated: 15 March 2017

Q6. Will you consider electronic screw drive lift systems?

A6. Just looking for consoles that raise easily.

Q7. What is the desired size of the work surface for each console configuration?

A7. The outter two positions 4' x 3' and the inside position 6' x 3' Console One: 4x3', 6x3', and 4x3' and Console Two: 4x3'.

Q8. Do you require power/data outlets on the work surface?

A8. Please make sure that all furniture/ Consoles are provisioned for Communication Cabling and comply with ANSI/TIA-569-C Standard (Attachment 4). Need to have Separate Trays/Raceways (provisioned) for Power and Data.

Refer to this Section:

9.3.1 Separation between telecommunications and power cables

9.3.1.1 General

Co-installation of telecommunications cable and power cable is governed by applicable electrical code for safety. For minimum separation requirements of electrically conductive telecommunications cable from typical branch circuits (120/240 Vac, 20 A), the requirements of NFPA 70 shall be applied, for example:

a) separation from power conductors;

b) separation and barriers within raceways; and

c) separation within outlet boxes or compartments.

Zero pathway separation distance is permitted when the electrically conductive telecommunications cables, the power cables or both are enclosed in metallic pathways that meet the following conditions:

a) the metallic pathway(s) completely enclose the cables and are continuous;

b) the metallic pathway(s) are properly bonded and grounded per ANSI/TIA- 607-B (Attachment 5); and

c) the walls of the pathway(s) have a minimum thickness 1 mm (0.04 in) nominal if made of steel or

1.5 mm (0.06 in) nominal if made of aluminum.

No separation is required between power and telecommunications cables crossing at right angles.

Q9. How many monitors will be mounted to each console?

A9. 5-6 on each outside position and 3 on inside

Q10. How many computer towers per console?

A10. Two on outside position and 2-3 on inside position.

Q11. Are the storage shelves for notebooks or something else?

A11. Yes, need storage for the two outside positions

Q12. Where does the electrical power emanate from.. computer flooring? The wall?

A12. From the floor.

Q13. Do you require doors on the storage shelves?

A13. No open storage works.

Q14. Do you require sound absorption panels?

A14. No

Q15. Can you clarify what is meant by “ base reduced depth console”?

A15. This is just referring to the distance between the sit/stand position.

Q16. Can you clarify “patch bay on middle of console”. Typically there is a rear mounting rail whereby monitors can be arranged anywhere on the console with articulation monitor mounts.

A16. Rear mounting rail works so we can arrange the monitors.

Q17. What is your desired delivery/install target date?

A17. As soon as possible

Q18. Is there a loading dock for delivery?

A18. 303 does not have a loading dock

Q19. Is a lift gate truck required?

A19. No, since there is no loading dock

Dated: 19 March 2017

Q20. "We have for many years has specialized in retrofitting Command Post. We notice that there is no mention of radios. Every Command Post project that we have completed has used Siemens radios which require accommodations for the Siemen’s CPU, touch screen and radio speaker panel. Can you tell us if this is something that has to be accommodated in the console configuration in this solicitation? If so, how many positions will have them?"

A20. We are planning for phone systems. Not too sure how big the CPU's will be, but my plan was to run as much electronics through the basement. We are planning on three phone positions on console one and one on the smaller console. Have the phones on the same rack as the computer screens.

Dated: 21 March 2017

Q21. How many monitors will be mounted to each console?

A21. 5-6 on each outside position and 4-5 on inside 3 for smaller console.

Q22. Is seating required?

A22. No

Q23. Include Electrical and Comms provisions in Bid? (ie extend capacity/quantity of receptacles/Power Poles

A23. See A8.

Q24. Are chairs to be included?

A24. No

Q25. How many anticipated personnel will be utilizing this station at fully functional compacity.

A25. 2

Q26. Would the Government like to include options for a wall mounted Rack System for future expansion, or larger monitors?

A26. No

Q27. Maximum Number of Monitors and Monitor size that is desired at each viewing station.

A27. Outside Consoles-6, Inside-5, and console in back-3

Q28. Exclude Systems Furniture Partitions shown in example?

A28. Yes

Q29. Basic Shop Drawing and Floor Plan required with bid submission?

A29. Yes

Q30. All work surfaces to have elevation ability?

A30. Yes

Q31. Is Black the desired finish color?

A31. No, like to see options

Dated: 22 March 2017

Q32. I was told by one of the other vendors the design has changed from the RAW DRAWINGS shown on the web site (FedBizOpps.com) to three consoles that are along the wall:

*4’ by 3’deep
*6’ by 3’ deep
*4’ by 3’ deep

Also the supervisor Console is now a straight:

* 4’ by 3’ deep

Is this correct? Do you have a revised “Raw Drawing”?

A32. Those measurments are correct. All sections can be strait, the raw drawing was a sample for reference only not the exact requirement.There will be no additional drawing.

Q33. I was also told that the additional information is listed on the web site, the site I listed above still is only showing the original two documents:

*Command Post Raw Drawings
*SELFRIDGE AIR NATIONAL GUARD BASE ACCESS FORM

Can you confirm any of this information I received?

A33. All questions that have been received will be posted to FBO.gov, along with a few additional attachments.