SITE_VISIT_SLIDES.ppt
PPT presentation 827 KB Posted
- Attached to
- Upgrade Electrical Distribution System at Alpena Combat Readiness Training Center (CRTC)
- Solicitation number
- W912JB-15-R-8000
About this file
SITE VISIT SLIDE PRESENTATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGN_IN_SHEET.pdf | ||
| Site_Visit_MFR.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0003.pdf | ||
| EXHIBIT_B.doc | DOC document | |
| EXHIBIT_A.doc | DOC document | |
| Exhibit_C.doc | DOC document | |
| Wage_Determination.pdf | ||
| DRAWINGS.pdf | ||
| SPECS.pdf | ||
| Solicitation.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Meeting
SOLICITATION NUMBER W912JB-15-R-8000
Repair Base Electrical Distribution System
ALPEN CRTC, MI
PROJECT NO. TDVG112848
Created by NGB/CFS
Ready - Reliable - Relevant Agenda Introductions
Request for Proposal
Project Scope
Overview of Drawings
Questions/Comments
Site Visit
Request for Proposal
RFP # W912JB-15-R-8000
Project No. Repair Base Electrical Distribution System, Alpena CRTC, MI
Project No.: TDVG112848
Bonds: Performance and payment bonds are required
Davis Bacon Wages: General Decision Number: MI150105, dated 03/20/2015, MI42-Alpena County. ( http://www.wdol.gov/ )
Liquidated Damages: Do apply; see solicitation provision 52.211-12.
Proposal Acceptance Period: 90 Days but funding is available now
Proposal Due Date: 12 August 2015, 12:00 p.m.
Request for Proposal
RFP # W912JB-15-R-8000
Project Magnitude: $1,000,000 - $5,000,000
Performance Period: The performance period is 270 calendar days after the NTP is issued. This includes material reviews, approval, material lead times, and final cleanup of the premises. A winter exclusion period will be issued in November/December depending on the weather. Startup will occur again in the spring (March/April) pending weather.
Site Visit: Today following Pre-Proposal meeting.
Bid Documents were provided as a part of the Request for Proposal.
Set-Aside: 100% HUBzone Certified Small Business
Request for Proposal
RFP # W912JB-15-R-8000
Bidding Document – see Item No. 0001 of solicitation for full description.
Item No. Description Quantity Total Amount
| 0001 The Contractor shall provide all plant, | 1 LS | $ |
| labor, materials, transportation, tools, | ||
| equipment, appliances, permits, insurance, | ||
| and supervision necessary to accomplish | ||
| all work indicated in the contract documents, | ||
| drawings, statements of work and specifications | ||
| for TDVG112848 Repair Base Electrical Distribution | ||
| System at the Alpena Combat Readiness | ||
| Training Center (CRTC). |
Project Scope
RFP # W912JB-15-R-8000
See handouts
Project Scope
Project Scope Carefully review all the plan notes and specs prior to bidding Lump sum contract, not unit cost Review phasing and notes on plan E-002 Review evaluation factors for award Technical capability Past/Present performance Created by NGB/CFS
Questions / Comments All questions in writing due to KO NLT 5 August
File details come from the government source that posted it. Updated .