Amendment_0003.pdf
PDF 81 KB Posted
- Attached to
- Upgrade Electrical Distribution System at Alpena Combat Readiness Training Center (CRTC)
- Solicitation number
- W912JB-15-R-8000
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGN_IN_SHEET.pdf | ||
| Site_Visit_MFR.pdf | ||
| SITE_VISIT_SLIDES.ppt | PPT presentation | |
| Amendment_0002.pdf | ||
| EXHIBIT_B.doc | DOC document | |
| EXHIBIT_A.doc | DOC document | |
| Exhibit_C.doc | DOC document | |
| Wage_Determination.pdf | ||
| DRAWINGS.pdf | ||
| SPECS.pdf | ||
| Solicitation.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER W912JB-15-R-8000
REPAIR BASE ELECTRICAL DISTRIBUTION SYSTEM
ALPENA COMBAT READINESS TRAINING CENTER, ALPENA, MI
AMENDMENT 0003
The purpose of this amendment is to provide answers to questions that have been asked, and to add further instructions for proposal submissions:
1. Incorporate the following questions/answers into the solicitation:
QUESTION 1: The drawing and specifications say existing conduits are to be abandoned in place, does this apply to conductors also? In particular, does this apply to direct burial conductors?
ANSWER 1: Conductors, including in conduit and direct buried cable, indicated to be demolished should all be removed. According to Demolition Note #2 on E-001:
"Removal shall consist of removing connecting equipment or device, conduit and
WIRE BACK TO THE POINT OF SERVICE."
QUESTION 2: Do all demo’d materials remain as Government property, and are they to be stockpiled for Government access after demolition?
ANSWER 2: The Government has right of first refusal for all demolished items. Per Demolition Note #1 on E-001: All electrical equipment and fixtures which are noted to be removed as part of the demolition shall be turned over to the Government unless directed otherwise by the Government. All equipment, fixtures, equipment, feeders, raceway, and wire not wanted by the Government shall be disposed of by the contractor."
2. Add the following instructions to Section 00100 of the solicitation:
5.1. A proposal repository box is provided for hand carried proposals and is located at the Alpena CRTC, Bldg 2 (Civil Engineering Bldg), Alpena, MI, 49707. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals. The point of contract for hand carried proposals is SSgt Raymond Kelley, 989-354-6542.
5.3 Proposals may also be mailed to the following address and must be received prior to the time established for the receipt of proposals:
110ATKW/MSC
Attn: SMSgt Jonathan Bodus 146 Sable Ave, Bldg 6900 Battle Creek MI 49037
3. Change the effective Davis Bacon wage determination to read: MI150105, dated
07/03/2015.
4. All other terms and conditions shall remain the same.
JONATHAN BODUS, SMSGT, MI ANG
Contracting Officer