15R4006_Attachment_6_Past_Perf_Complete.doc

DOC document 114 KB Posted

Attached to
Airfield Management Services Federal contract opportunity
Solicitation number
W912JB15R4006
Issued by
Department of the Army Michigan Army National Guard

About this file

Past Performance

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Management Services, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS.docx DOCX document
Pre-proposal_Sign_in_Sheet.pdf PDF
Site_Visit_-_Pre-Proposal_Minutes.pdf PDF
15R4006_Slides_for_pre-proposal_conference_--13_Oct_15.pptx PPTX presentation
QUESTIONS_AND_ANSWERS.docx DOCX document
QUESTIONS_AND_ANSWERS.docx DOCX document
15R4006_Attachment_6_Past_Perf_Solicitation.docx DOCX document
DD_254_fillable_Ops.pdf PDF
QUESTIONS_AND_ANSWERS.docx DOCX document
QUESTIONS_AND_ANSWERS.docx DOCX document
15R4006_Airfield_Management_Services.pdf PDF
15R4006_Attachment_7_Teaming_Complete.doc DOC document
15R4006_Attachment_1Base_Access_Complete.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6

PAST PERFORMANCE INDIVIDUAL EVALUATION FORM

Contractor:
Offeror #
Evaluator:
Eval
Pg #
Contract Description
$
YR/MO
RW
Relevancy comments

Ref

Q1

Q2

Q3

Q4

Q5

Q6

Q7

O1

O2

Overall Relevancy (consider all projects to scope):

O=Other and may include PPMIS

Currency

Jan-00
Jan-00
Jan-00
Jan-00
Jan-00
Jan-00

Overall Trend

Relevancy

SSEB COMMENTS ON TRENDS ETC.

Questionnaire #
Q1
Q2
Q3
Q4
Q5
Q6
Q7
O1
O2
O3
O4

Ratings: N/NA= Neutral/NA E= Exceeded Req' M= Met Req' X= Did Not Met Req'

QUALITY OF PRODUCT OR SERVICE

#1 The Contractor provided a product or service that conformed to contract requirements, specifications, and standards of good workmanship.

#2 The Contractor submitted accurate reports

#3 The Contractor utilized personnel that were appropriate to the effort performed.

COST CONTROL

#1 The Contractor performed the effort within the estimated cost/price.

#2 The Contractor submitted accurate invoices on a timely basis

#3 The Contractor demonstrated cost efficiencies in performing the required effort.

#4 The actual costs/rates realized closely reflected the negotiated costs/rates.

SCHEDULE

#1 The tasks required under this effort were performed in a timely manner and in accordance with the period of performance of the contract.

#2 The Contractor was responsive to technical and/or contractual direction.

BUSINESS RELATIONSHIPS

#1 The Contractor demonstrated effective management over the effort performed.

#2 The Contractor maintained an open line of communication so that the Contracting Officer’s Representative (COR) and/or Technical Point of Contact (TPOC) were apprised of technical, cost, and schedule issues.

#3. The Contractor presented information and correspondence in a clear, concise, and businesslike manner.

#4 The Contractor promptly notified the COR, TPOC, and/or Contracting Officer in a timely manner regarding urgent issues.

#5 The Contractor cooperated with the Government in providing flexible, proactive, and effective recommended solutions to critical program issues.

#6 The Contractor made timely award to, and demonstrated effective management of, its subcontractors.

#7 The Contractor demonstrated an effective small/small disadvantaged business subcontracting program.

CUSTOMER SATISFACTION

#1 The products/services provided adequately met the needs of the program.

#2 The Contractor was able to perform with minimal or no direction from the COR or the TPOC.

#3 I am satisfied with the performance of the Contractor under this effort.

KEY PERSONNEL

#1 The labor turnover in key personnel labor categories was minimal and did not adversely affect Contractor performance.

#2 The Contractor proposed qualified personnel to fulfill the requirements of the contract.

OTHER:

#1 Would you award this firm another contract? ( ) Yes ( ) No If “No,” please provide an explanation.

#2 Was the contract terminated for default? ( ) Yes ( ) No. If “Yes,” please provide an explanation

COMMENTS:

Q1:

Q2:

Q3:

Q4:

Q5:

c. Sub-factor Management Effectiveness was rated LOW RISK based on Respondent Identification and Rating Questionnaires received from project owners with an overall rating trend of very good for the elements listed under Management Effectiveness. Past project evaluations included one very relevant project with exceptional rating and another very relevant and relevant projects with a mix a ratings; some very good and others only satisfactory. These ratings reflected an overall trend in Management Effectiveness that was between low risk and moderate risk. The board decided the trend leaned greater towards the low risk. (Section 00120, para 2.2.7.3)

c. Sub-factor Management Effectiveness was rated LOW RISK based on Respondent Identification and Rating Questionnaires received from project owners with an overall rating trend of very good for the elements listed under Management Effectiveness. Past project evaluations included one very relevant project with exceptional rating and another very relevant and relevant projects with a mix a ratings; some very good and others only satisfactory. These ratings reflected an overall trend in Management Effectiveness that was between low risk and moderate risk. The board decided the trend leaned greater towards the low risk. (Section 00120, para 2.2.7.3)

Insert RW from above

File details come from the government source that posted it. Updated .