PreBidSlides_22_Apr_14.ppt
PPT presentation 2 MB Posted
- Attached to
- Add / Alter Distributed Common Ground (DCGS) Federal contract opportunity
- Solicitation number
- W912JA-14-R-0005
About this file
Pred-Bid Slides
View the file
Other files for this federal contract opportunity
Show all 50
Add / Alter Distributed Common Ground (DCGS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
117th AIR REFUELING WING
PRE-BID CONFERENCE
Add / Alter Distributed Common Ground Station Facilities (DCGS)
ANG Project # BRKR999147
SOLICIATION # W912JA-14-R-0005
INTRODUCTIONS
Contracting Personnel CMSgt Kelly H. Waldrop, Contracting Officer MSgt Wade R. Edwards, Contracting Specialist
Civil Engineering Maj. Scot Vandenberghe, Base Civil Engineer Lt. Jeff Farmer, Deputy Base Civil Engineer
Site Visit CMSgt Finlay Johnson SMSgt Mark Farley SMSgt Miguel Harrison
REMINDER THAT ALL QUESTIONS MUST BE SUBMITTED THROUGH THE APPROPRIATE PROCESS. DO NOT CONTACT THE INDIVIDUALS LISTED DIRECTLY.
DISCLAIMER
The following is a brief overview of the bid requirements.
Bidders are cautioned to carefully read the requirements of the solicitation and comply Accordingly Plans & Specs are RESTRICTED ACCESS Export Controlled !
Firms must be registered and have password on FBO.gov
SYNOPSIS
Add / Alter Distributed Common Ground Station Facilities (DCGS) Magnitude is $5,000,000 to $10,000,000 Funds are currently available A Firm-Fixed Price Contract will be awarded Project is being solicited 100% Small Business Set-aside The contract will be awarded using Source Selection Tradeoff Procedures Evaluation Factors Technical Past Performance Price
SYNOPSIS CONT.
Bid Schedule: Bid Form page 3 Complete Representations and Certifications – Online: https://www.sam.gov/portal/public/SAM/ Davis Bacon Wage Rates applicable: AL140050, AL50, dated 01/03/2014 Bid Guarantee’s are NOT required.
Liquidated Damages: $953.01 a day Performance Period: 630 Days
REVISED PERFORMANCE PERIOD:
705 DAYS!
SOLICITATION, PLANS & SPECS
On the web – https://www.fbo.gov Solicitation Base + 5 options
| Option 1 – Add Parking on South-side of B Street | |
| Option 2 - Hydro-stop Roofing. | |
| Option 3 - Rainwater Harvesting System & Water Efficient | Landscaping |
Option 4 – Upgrade Air Barrier / Under slab Vapor Option 5 – New Turn In on Northeast Corner of Site Exhibits A - E Questions & Answers document Amendments
PROPOSAL DUE DATE
DATE: 21 May 2014 TIME: 2:00 pm CST Documents must be received prior to or on this date LOCATION: 117th Air Refueling Wing, Base Contracting, Building 175 5401 East Lake Blvd, Birmingham, AL 35217-3545 All documents should have proper signatures NO Facsimile or Electronic Bids will be accepted.
SUBMISSION REQUIREMENTS
Section 00110 Of The RFP Details The Required Information And Format For The Proposal
2 Volumes Are Required Volume 1 Price/Cost Proposal Volume 2 Two Parts Part 1 Technical Capability Proposal Part 2 Past/Present Performance Information
Volume 1-Cost/Price Info & Pro Forma Documents
| Offeror portion of SF 1442 |
| Section 00010-Pricing Info-All Line Items |
| Section 00600-Reps & Certs |
Complete Reps & Certs on the web at https://www.sam.gov/portal/public/SAM/ Complete & return Reps & Certs in Section 00600 Include Introductory Page-Section 00100 lists required information Exhibit D completed Sealed Envelope (FAR 9.105-1)
Volume 2 Part I-TECHNICAL CAPABILITY
Part I-Technical Capability Comprised of two (2) sub factors:
Experience & Capability LEED® Experience with building to US Green Building Council (USGBC) LEED® Standards
Volume 2 Part I-TECHNICAL CAPABILITY Part I-Technical Capability ACCEPTABLE: Proposal meets the minimum requirements.
UNACCEPTABLE: Proposal does NOT clearly meet the minimum requirements.
Sub factor 1 - Limited to ten (10) pages Demonstrate experience with building to perform a project of this magnitude & complexity AND consideration to ICD 705 compliant work space etc.
If no such experience indicate in detail how offeror plans to overcome this lack of experience Sub factor 2 - – (USGBC) LEED® Experience building to (USGBC) LEED® standards
Volume 2 Part II- Past/Present Performance Information Exhibit A- Part 1- Performance Relevancy Questionnaires – Use Exhibit Format!
Complete not more than 3 forms for Relevant Contracts Completed Or Substantially Completed (70%) In The Last Five Years Send Questionnaires for the Exhibit A Projects to your references “Do This Early” – must be rec’d by the Contracting Office by the closing date.
Volume 2 Part II- Past/Present Performance Information . Continued If You Do Not Have Relevant Past Performance And Are Using Experience Of Key Personnel, Predecessor Companies Or Subcontractors To Obtain This Ensure You Clearly State This In The Proposal
To Be Considered Subcontractor Must Complete A Consent Form - Exhibit B
References
Reference Questionnaires C Are Also Due By 2:00 Central Time on Wednesday 21 May 14
Send Reference Questionnaires Out EARLY!
Return to KO Via E-mail at:
117arw.contracting@ang.af.mil or fax to 205 714-2472
Exhibits
| EXHIBIT A- Performance Relevancy | Questionnaire | |
| EXHIBIT B- Subcontractor Information and | Consent Form | |
| EXHIBIT C- Information and Forms | ||
| EXHIBIT D-Option Execution Schedule | ||
| EXHIBIT E- Inquiry Question Form |
Proposal Evaluation
| Process Is Detailed In RFP Section 00120 |
| Carefully Review Section 00120 When Preparing Proposal |
| Comply With Section 00100 And 00110 Requirements |
| Failure To Furnish A Complete Proposal May Result In Elimination From Consideration |
BEST VALUE
Best Value Is Defined As An Award Based On The Greatest Overall Benefit In Response To The Requirement. Award Is Based On Price And Other Non-cost Related Factors.
Award
Technical and Past/Present Performance are approximately equal to each other and when combined are approximately equal to the Price Factor.
1. Technical will be evaluated first, Price Factor second and Past Performance last.
2. If an offeror is deemed unacceptable, no further competition will take place.
3. If Price is determined to be reasonable & realistic, the offer will continue in the competition for a PP evaluation.
Important Reminders Award is contemplated to be made without discussions- Do Not anticipate a chance to make corrections or changes
Your first proposal will probably be your only proposal!!
Read the solicitation requirements carefully!!
Consider using Section 00120 to “rate” yourself before submitting the proposal-is it complete??
When Using A Subcontractor To Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, Or it Will Not Be Considered
Important Reminders Award In This Process Does Not Necessarily Mean The Lowest Price Wins
All amendments will be posted on the FBO web site Check site regularly for changes & refresh the page
After closing no information will be available until award, which will be posted to the web. Results should be announced in approximately 60 days
HOW QUESTIONS WILL BE HANDLED
Questions must be submitted via electronic mail to: 117arw.contracting@ang.af.mil (Section 00100 - 3.1) Submit no later than COB 16 May 2014 Hours of operation: Tues – Friday 0700-5:30 Questions received after 16 May 2014 may be held and addressed after RFP closing with those offerors determined to be in the competitive range if discussions are deemed necessary Please try and consolidate your Request for Information Do NOT call technical personnel or AE-this will delay getting an answer
ANSWERS TO QUESTIONS
All questions, on a non-attribution basis, and the answers will be posted to the website https://www.fbo.gov
If necessary Addendums, issued by an Amendment will also be posted
Check website regularly and don’t forget to REFRESH the web page.
SITE VISIT SECURITY AND SAFETY BRIEFING
Important information to know before we begin our site visit on DCGS.
No Cell Phones inside the Building No PHOTOs Official Government Photographer
DON’T FORGET TO HAVE REFERENCES SENT IN BY THIS TIME & DATE
PROPOSALS ARE DUE
NOT
LATER THAN
2:00 p.m. Central Time 21 May 2014
Thank You
We appreciate your interest in this project Office Open Tues-Fri
Questions
File details come from the government source that posted it. Updated .