MSA_ROAD_TYPE_B3_-_100__Submittal_Drawings.pdf

PDF 5 MB Posted

Attached to
Munitions Storage Area Road Replacement Federal contract opportunity
Solicitation number
W912J718B5000
Issued by
Department of the Army Idaho Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Munitions Storage Area Road Replacement, newest first.
File Type Posted
W912J7-18-B-5000-0001_FINAL.pdf PDF
BXRH092012_Repair_MSA_Road_SOW.pdf PDF
MSA_ROAD_TYPE_B3_-_100__Submittal_Specifications.pdf PDF
W912J718B5000_Solicitation_MSA_Road.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHARLES

Stamp ch uc k@ ma xe y-t oo ke y.c om

M ax ey To ok ey

A rch ite cts

L.

L.P

W

. Id ah o S

t. S uit e 2

PH

ON

E:

(2

) 3

-96 htt p:/

/w ww

.m ta@ ma xe y-t oo ke y.c om

Bo ise

, Id ah o 8

9 0 7 6

C-0

12/05/17

AutoCAD SHX Text

COMM

AutoCAD SHX Text

COMM

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text

POWER VAULT

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

TAXIWAY

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text

COMM

AutoCAD SHX Text

POWER VAULT

AutoCAD SHX Text

POWER VAULT

AutoCAD SHX Text

POWER VAULT

AutoCAD SHX Text

TRAFFIC LOOP

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text W

AutoCAD SHX Text

COMM

AutoCAD SHX Text

UNKNOWN UTILITY VAULT

AutoCAD SHX Text

OLD COMM

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text

36" TOP OF PIPE EL 2838.42

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

36" TOP OF PIPE EL 2837.79

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text BXRH No.

AutoCAD SHX Text Date:

AutoCAD SHX Text Job No.

AutoCAD SHX Text 1409E

AutoCAD SHX Text

DECEMBER 5, 2017

AutoCAD SHX Text

GOWEN FIELD, BOISE, IDAHO

AutoCAD SHX Text

FOR

AutoCAD SHX Text

MSA ROAD DESIGN

AutoCAD SHX Text

IDAHO AIR NATIONAL GUARD

AutoCAD SHX Text

TYPE "B-3" 100%%% SUBMITTAL

AutoCAD SHX Text 092021

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text DEMOLITION NOTES This project consists of replacing the existing MSA road. The existing road is a 2-lane, 20' wide asphalt road with loose gravel/dirt shoulders. Demolition includes the demolition of the existing asphalt roadway, various culverts, and the old communications vaults and pedestals along the south side of the road. Demolition shall be completed in two stages, south half and east end of the roadway first, remaining north half second. The remaining north half is to be constructed after construction of the south half and east end is complete. Sawcut along existing centerline to the east MSA parking lot approach. The east MSA parking lot approach is to be completed as part of phase 1. Sawcut existing asphalt approaches 12' from centerline or as noted on plans. Utilities, signs, etc, remain in place unless specifically called out to be removed. Demolition work shall be done so as to minimize exposed soil areas. The Taxiway is not included in the demolition. The Taxiway is not included in the demolition. The Taxiway is not included in the demolition.

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

0+17.00 BEGIN PROJECT N=689667.79 E=2500409.07

AutoCAD SHX Text

27+12.50 END PROJECT

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

EXISTING EDGE OF ROADWAY

AutoCAD SHX Text

MSA PARKING LOT

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE I DEMO

AutoCAD SHX Text

PHASE II DEMO

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

CONTRACTOR STAGING AREA

AutoCAD SHX Text

PAVED PARKING AREA

k@ ma xe y-t oo ke y.c om

M ax ey To ok ey

A rch ite cts

L.

L.P

W

. Id ah o S

t. S uit e 2

PH

ON

E:

(2

) 3

-96 htt p:/

/w ww

.m ta@ ma xe y-t oo ke y.c om

Bo ise

, Id ah o 8

9 0 7 6

C-1

12/05/17

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text W

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

DRAINAGE INLET (DI)

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

SEWER MANHOLE(SSMH)

AutoCAD SHX Text

COMMUNICATION MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

FOUND ALUMINUM CAP

AutoCAD SHX Text

FOUND PK NAIL

AutoCAD SHX Text

CABLE/COMMUNICATION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

COMM

AutoCAD SHX Text S

AutoCAD SHX Text

5' C0NTOUR LINE

AutoCAD SHX Text

1' CONTOUR LINE

AutoCAD SHX Text

EXISTING EDGE OF PAVEMENT

AutoCAD SHX Text

GAS

AutoCAD SHX Text

NEW EDGE OF PAVEMENT

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text BXRH No.

AutoCAD SHX Text Date:

AutoCAD SHX Text Job No.

AutoCAD SHX Text 1409E

AutoCAD SHX Text

DECEMBER 5, 2017

AutoCAD SHX Text

GOWEN FIELD, BOISE, IDAHO

AutoCAD SHX Text

FOR

AutoCAD SHX Text

MSA ROAD DESIGN

AutoCAD SHX Text

IDAHO AIR NATIONAL GUARD

AutoCAD SHX Text

TYPE "B-3" 100%%% SUBMITTAL

AutoCAD SHX Text 092021

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text PROJECT DESCRIPTION THIS PROJECT CONSISTS OF REPLACING THE EXISTING MSA ROAD. THE MSA ROAD IS RELATIVELY FLAT. THE EXISTING ROAD IS A 2-LANE, 20' WIDE ASPHALT ROAD WITH LOOSE GRAVEL/DIRT SHOULDERS. THE EXISTING ROAD WILL BE REPLACED WITH A 2-LANE, 24' WIDE ASPHALT ROAD DESIGNED TO ACCOMMODATE THE TYPE OF VEHICLES THAT WILL BE USING IT. THE 2' WIDENING OF BOTH LANES IS CONSIDERED MINOR CONSTRUCTION. THE MODIFICATIONS TO THE SITE INCLUDE DEMOLISHING THE EXISTING ASPHALT ROADWAY, REMOVING VARIOUS ABANDONED UTILITIES IAS SHOWN ON THE PLANS, CONSTRUCTING THE NEW ROADWAY AND ROADSIDE STORMDRAIN DITCHES, AND CONSTRUCTING ASPHALT APPROACHES TO EXISTING PARKING LOTS AND FACILITIES. THE EXISTING CONSTRUCTION SITE CONSISTS OF AN ASPHALT ROADWAY, SUBSURFACE UTILITIES, AND OCCASIONAL ROADSIDE DITCHES. THE SITE IMPROVEMENTS WILL INCLUDE ROADWAY BASE AND SUBBASE GRADING, PAVING, AND RESEEDING OF DISTURBED AREAS. 1 - ALL WORK AND MATERIALS SHALL MEET THE MINIMUM REQUIREMENTS OF THE CURRENT EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC). 2 - ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE - ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE - ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE OF CONSTRUCTION. IN CASE OF CONFLICT THE OF CONSTRUCTION. IN CASE OF CONFLICT THE CONSTRUCTION. IN CASE OF CONFLICT THE CONSTRUCTION. IN CASE OF CONFLICT THE IN CASE OF CONFLICT THE IN CASE OF CONFLICT THE IN CASE OF CONFLICT THE CASE OF CONFLICT THE CASE OF CONFLICT THE OF CONFLICT THE OF CONFLICT THE CONFLICT THE CONFLICT THE THE THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE PRIOR TO THE START OF THE WORK. 3 - GENERAL LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT - GENERAL LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT - GENERAL LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT GENERAL LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT GENERAL LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT LOCATION OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT ARE TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT TO BE USED FOR GENERAL INFORMATION ONLY AND DO NOT BE USED FOR GENERAL INFORMATION ONLY AND DO NOT BE USED FOR GENERAL INFORMATION ONLY AND DO NOT USED FOR GENERAL INFORMATION ONLY AND DO NOT USED FOR GENERAL INFORMATION ONLY AND DO NOT FOR GENERAL INFORMATION ONLY AND DO NOT FOR GENERAL INFORMATION ONLY AND DO NOT GENERAL INFORMATION ONLY AND DO NOT GENERAL INFORMATION ONLY AND DO NOT INFORMATION ONLY AND DO NOT INFORMATION ONLY AND DO NOT ONLY AND DO NOT ONLY AND DO NOT AND DO NOT AND DO NOT DO NOT DO NOT NOT NOT DESIGNATE EXACT UTILITY LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL EXACT UTILITY LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL EXACT UTILITY LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITY LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITY LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL LOCATION. UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITIES SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL SHOWN ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL ARE NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL NOT INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL INCLUSIVE OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL OF ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL ALL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL UTILITIES THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL THAT EXIST. SEE SITE SURVEY FOR ADDITIONAL EXIST. SEE SITE SURVEY FOR ADDITIONAL EXIST. SEE SITE SURVEY FOR ADDITIONAL SEE SITE SURVEY FOR ADDITIONAL SEE SITE SURVEY FOR ADDITIONAL SITE SURVEY FOR ADDITIONAL SITE SURVEY FOR ADDITIONAL SURVEY FOR ADDITIONAL SURVEY FOR ADDITIONAL FOR ADDITIONAL FOR ADDITIONAL ADDITIONAL ADDITIONAL INFORMATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT UTILITY COMPANIES WHEN CONSTRUCTION MIGHT UTILITY COMPANIES WHEN CONSTRUCTION MIGHT COMPANIES WHEN CONSTRUCTION MIGHT COMPANIES WHEN CONSTRUCTION MIGHT WHEN CONSTRUCTION MIGHT WHEN CONSTRUCTION MIGHT CONSTRUCTION MIGHT CONSTRUCTION MIGHT MIGHT MIGHT INTERFERE WITH NORMAL OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY WITH NORMAL OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY WITH NORMAL OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY NORMAL OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY NORMAL OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY OPERATION OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY OF ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY ANY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY UTILITIES. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY ALSO THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY TO HAVE THE APPROPRIATE UTILITY TO HAVE THE APPROPRIATE UTILITY HAVE THE APPROPRIATE UTILITY HAVE THE APPROPRIATE UTILITY THE APPROPRIATE UTILITY THE APPROPRIATE UTILITY APPROPRIATE UTILITY APPROPRIATE UTILITY UTILITY UTILITY COMPANY OR DIGLINE FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT OR DIGLINE FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT OR DIGLINE FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT DIGLINE FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT DIGLINE FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT FIELD LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT PRIOR TO BEGINNING WORK IN THAT PRIOR TO BEGINNING WORK IN THAT TO BEGINNING WORK IN THAT TO BEGINNING WORK IN THAT BEGINNING WORK IN THAT BEGINNING WORK IN THAT WORK IN THAT WORK IN THAT IN THAT IN THAT THAT THAT AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED AND FOR RESTORING ANY UTILITIES DAMAGED AND FOR RESTORING ANY UTILITIES DAMAGED FOR RESTORING ANY UTILITIES DAMAGED FOR RESTORING ANY UTILITIES DAMAGED RESTORING ANY UTILITIES DAMAGED RESTORING ANY UTILITIES DAMAGED ANY UTILITIES DAMAGED ANY UTILITIES DAMAGED UTILITIES DAMAGED UTILITIES DAMAGED DAMAGED DAMAGED DUE TO CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. THE DIGLINE PHONE NUMBER IS 1-800-342-1585. 4 - THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE - THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE - THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE IS RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE RESPONSIBLE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE FOR PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE PROVIDING A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE A CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE CONSTRUCTION TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE TRAFFIC CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE CONTROL PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE PLAN FOR THE PROJECT. CONSTRUCTION SHALL BE FOR THE PROJECT. CONSTRUCTION SHALL BE FOR THE PROJECT. CONSTRUCTION SHALL BE THE PROJECT. CONSTRUCTION SHALL BE THE PROJECT. CONSTRUCTION SHALL BE PROJECT. CONSTRUCTION SHALL BE PROJECT. CONSTRUCTION SHALL BE CONSTRUCTION SHALL BE CONSTRUCTION SHALL BE SHALL BE SHALL BE BE BE PHASED SO THAT ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. SO THAT ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. SO THAT ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. THAT ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. THAT ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. ONE LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. LANE IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. IS OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. OPEN AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. AT ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. ALL TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. TIMES AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. AND THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. THE MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. MSA PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. PARKING LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. LOT WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. WILL BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. BE ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. ACCESSIBLE VIA AT LEAST ONE ENTRANCE AT ALL TIMES. VIA AT LEAST ONE ENTRANCE AT ALL TIMES. VIA AT LEAST ONE ENTRANCE AT ALL TIMES. AT LEAST ONE ENTRANCE AT ALL TIMES. AT LEAST ONE ENTRANCE AT ALL TIMES. LEAST ONE ENTRANCE AT ALL TIMES. LEAST ONE ENTRANCE AT ALL TIMES. ONE ENTRANCE AT ALL TIMES. ONE ENTRANCE AT ALL TIMES. ENTRANCE AT ALL TIMES. ENTRANCE AT ALL TIMES. AT ALL TIMES. AT ALL TIMES. ALL TIMES. ALL TIMES. TIMES. TIMES. TRAFFIC CONTROL MUST BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL CONTROL MUST BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL CONTROL MUST BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL MUST BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL MUST BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL BE FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL FUNCTIONAL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL ON A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL A 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL 24 HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL HOUR BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL BASIS FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL FOR THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL THE DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL DURATION OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL OF THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL THE PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL PROJECT. THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL THE TRAFFIC CONTROL PLAN/SCHEDULE SHALL TRAFFIC CONTROL PLAN/SCHEDULE SHALL TRAFFIC CONTROL PLAN/SCHEDULE SHALL CONTROL PLAN/SCHEDULE SHALL CONTROL PLAN/SCHEDULE SHALL PLAN/SCHEDULE SHALL PLAN/SCHEDULE SHALL SHALL SHALL BE APPROVED PRIOR TO CONSTRUCTION.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text PAVEMENT SECTION 3" CLASS III ASPHALT CONCRETE 4" CRUSHED AGGREGATE BASE 8" STRUCTURAL SUBBASE

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

2%%%± SLOPE

AutoCAD SHX Text

2% SLOPE

AutoCAD SHX Text

1' SHOULDER (TYP)

AutoCAD SHX Text

MSA ROAD SECTION

AutoCAD SHX Text

10' RDWY REPLACEMENT SEE NOTES PLAN C-1

AutoCAD SHX Text

1' SHOULDER (TYP)

AutoCAD SHX Text

2' MINOR CONST

AutoCAD SHX Text 6' DRAIN DITCH (TYP). ADJUST SIZE AND CONFIGURATION AS REQUIRED TO SUITE EXISTING CONDITIONS

AutoCAD SHX Text

1' DEEP (TYP)

AutoCAD SHX Text

1' DEEP (TYP)

AutoCAD SHX Text 6' DRAIN DITCH (TYP). ADJUST SIZE AND CONFIGURATION AS REQUIRED TO SUITE EXISTING CONDITIONS

AutoCAD SHX Text

2' MINOR CONST

10' RDWY REPLACEMENT SEE NOTES PLAN C-1

k@ ma xe y-t oo ke y.c om

M ax ey To ok ey

A rch ite cts

L.

L.P

W

. Id ah o S

t. S uit e 2

PH

ON

E:

(2

) 3

-96 htt p:/

/w ww

.m ta@ ma xe y-t oo ke y.c om

Bo ise

, Id ah o 8

9 0 7 6

C-2

12/05/17

AutoCAD SHX Text

UNKNOWN UTILITY VAULT

AutoCAD SHX Text

OLD COMM

AutoCAD SHX Text

36" TOP OF PIPE EL 2838.42

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

36" TOP OF PIPE EL 2837.79

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text W

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

DRAINAGE INLET (DI)

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

SEWER MANHOLE(SSMH)

AutoCAD SHX Text

COMMUNICATION MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

FOUND ALUMINUM CAP

AutoCAD SHX Text

FOUND PK NAIL

AutoCAD SHX Text

CABLE/COMMUNICATION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

COMM

AutoCAD SHX Text S

AutoCAD SHX Text

5' C0NTOUR LINE

AutoCAD SHX Text

1' CONTOUR LINE

AutoCAD SHX Text

EXISTING EDGE OF PAVEMENT

AutoCAD SHX Text

GAS

AutoCAD SHX Text

NEW EDGE OF PAVEMENT

AutoCAD SHX Text

EXISTING ROADWAY CENTER LINE

AutoCAD SHX Text

PROPOSED ROADWAY CENTER LINE

AutoCAD SHX Text

EXISTING PIPE TO BE REMOVED

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text BXRH No.

AutoCAD SHX Text Date:

AutoCAD SHX Text Job No.

AutoCAD SHX Text 1409E

AutoCAD SHX Text

DECEMBER 5, 2017

AutoCAD SHX Text

GOWEN FIELD, BOISE, IDAHO

AutoCAD SHX Text

FOR

AutoCAD SHX Text

MSA ROAD DESIGN

AutoCAD SHX Text

IDAHO AIR NATIONAL GUARD

AutoCAD SHX Text

TYPE "B-3" 100%%% SUBMITTAL

AutoCAD SHX Text 092021

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text

ROADWAY STA. 0+00 - 5+00

AutoCAD SHX Text

SAW CUT INTO EXISTING ASPHALT PAVING. MATCH EXISTING GRADES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

0+17.00 BEGIN PROJECT N=689667.79 E=2500409.07

AutoCAD SHX Text

AutoCAD SHX Text

TRANSITION FROM FULL CURB SECTION TO ASPHALT. MATCH GRADES TO DRAIN.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 1" =

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETAIN AND PROTECT EXISTING CULVERT. MATCH DITCH INVERT WITH CULVERT INVERT.

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE EXISTING CULVERT.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETAIN AND PROTECT EXISTING CULVERT.

AutoCAD SHX Text

AutoCAD SHX Text RETAIN AND PROTECT ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO POWER, WATER, SEWER, COMMUNICATIONS, AND GAS, UNLESS SPECIFICALLY SHOWN OTHERWISE ON PLAN SHEETS. RETAIN AND PROTECT ALL SURVEY MONUMENTS.

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

AutoCAD SHX Text

GRADE AROUND EXISTING UTILITIES AND UTILITY LIDS IN DRAINAGE AREA.

k@ ma xe y-t oo ke y.c om

M ax ey To ok ey

A rch ite cts

L.

L.P

W

. Id ah o S

t. S uit e 2

PH

ON

E:

(2

) 3

-96 htt p:/

/w ww

.m ta@ ma xe y-t oo ke y.c om

Bo ise

, Id ah o 8

9 0 7 6

C-3

12/05/17

AutoCAD SHX Text W

AutoCAD SHX Text

COMM

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text 16'

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text W

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

DRAINAGE INLET (DI)

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

SEWER MANHOLE(SSMH)

AutoCAD SHX Text

COMMUNICATION MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

FOUND ALUMINUM CAP

AutoCAD SHX Text

FOUND PK NAIL

AutoCAD SHX Text

CABLE/COMMUNICATION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

COMM

AutoCAD SHX Text S

AutoCAD SHX Text

5' C0NTOUR LINE

AutoCAD SHX Text

1' CONTOUR LINE

AutoCAD SHX Text

EXISTING EDGE OF PAVEMENT

AutoCAD SHX Text

GAS

AutoCAD SHX Text

NEW EDGE OF PAVEMENT

AutoCAD SHX Text

EXISTING ROADWAY CENTER LINE

AutoCAD SHX Text

PROPOSED ROADWAY CENTER LINE

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text BXRH No.

AutoCAD SHX Text Date:

AutoCAD SHX Text Job No.

AutoCAD SHX Text 1409E

AutoCAD SHX Text

DECEMBER 5, 2017

AutoCAD SHX Text

GOWEN FIELD, BOISE, IDAHO

AutoCAD SHX Text

FOR

AutoCAD SHX Text

MSA ROAD DESIGN

AutoCAD SHX Text

IDAHO AIR NATIONAL GUARD

AutoCAD SHX Text

TYPE "B-3" 100%%% SUBMITTAL

AutoCAD SHX Text 092021

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text

ROADWAY STA. 5+00 - 10+00

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 1" =

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SAW CUT INTO EXISTING ASPHALT PAVING. MATCH EXISTING GRADES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETAIN AND PROTECT EXISTING CULVERT. MATCH DITCH INVERT WITH CULVERT INVERT.

AutoCAD SHX Text RETAIN AND PROTECT ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO POWER, WATER, SEWER, COMMUNICATIONS, AND GAS, UNLESS SPECIFICALLY SHOWN OTHERWISE ON PLAN SHEETS. RETAIN AND PROTECT ALL SURVEY MONUMENTS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SAWCUT AND REMOVE EXISTING ASPHALT TURNOUT. REPAVE MATCHING EXISTING GRADES.

AutoCAD SHX Text

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

GRADE AROUND EXISTING UTILITIES AND UTILITY LIDS IN DRAINAGE AREA.

k@ ma xe y-t oo ke y.c om

M ax ey To ok ey

A rch ite cts

L.

L.P

W

. Id ah o S

t. S uit e 2

PH

ON

E:

(2

) 3

-96 htt p:/

/w ww

.m ta@ ma xe y-t oo ke y.c om

Bo ise

, Id ah o 8

9 0 7 6

C-4

12/05/17

AutoCAD SHX Text

COMM

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

TAXIWAY

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text W

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

DRAINAGE INLET (DI)

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

SEWER MANHOLE(SSMH)

AutoCAD SHX Text

COMMUNICATION MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

FOUND ALUMINUM CAP

AutoCAD SHX Text

FOUND PK NAIL

AutoCAD SHX Text

CABLE/COMMUNICATION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

COMM

AutoCAD SHX Text S

AutoCAD SHX Text

5' C0NTOUR LINE

AutoCAD SHX Text

1' CONTOUR LINE

AutoCAD SHX Text

EXISTING EDGE OF PAVEMENT

AutoCAD SHX Text

GAS

AutoCAD SHX Text

NEW EDGE OF PAVEMENT

AutoCAD SHX Text

EXISTING ROADWAY CENTER LINE

AutoCAD SHX Text

PROPOSED ROADWAY CENTER LINE

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text BXRH No.

AutoCAD SHX Text Date:

AutoCAD SHX Text Job No.

AutoCAD SHX Text 1409E

AutoCAD SHX Text

DECEMBER 5, 2017

AutoCAD SHX Text

GOWEN FIELD, BOISE, IDAHO

AutoCAD SHX Text

FOR

AutoCAD SHX Text

MSA ROAD DESIGN

AutoCAD SHX Text

IDAHO AIR NATIONAL GUARD

AutoCAD SHX Text

TYPE "B-3" 100%%% SUBMITTAL

AutoCAD SHX Text 092021

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text

ROADWAY STA. 10+00 - 15+00

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 1" =

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SAW CUT INTO EXISTING ASPHALT PAVING. MATCH EXISTING GRADES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETAIN AND PROTECT EXISTING CULVERT. MATCH DITCH INVERT WITH CULVERT INVERT.

AutoCAD SHX Text RETAIN AND PROTECT ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO POWER, WATER, SEWER, COMMUNICATIONS, AND GAS, UNLESS SPECIFICALLY SHOWN OTHERWISE ON PLAN SHEETS. RETAIN AND PROTECT ALL SURVEY MONUMENTS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text RETAIN AND PROTECT CONCRETE TAXIWAY. MATCHING EXISTING EDGE OF PAVEMENT WITH NEW ASPHALT PAVING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETAIN AND PROTECT EXISTING SIGNS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCT 12 FT LONG, 12 INCH WHITE STRIPE.

AutoCAD SHX Text

AutoCAD SHX Text

STA 12+62

AutoCAD SHX Text

AutoCAD SHX Text

STA 14+32

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text GRADE AROUND EXISTING UTILITIES AND UTILITY LIDS IN DRAINAGE AREA. ADJUST LID HEIGHT AS NECESSARY TO MAINTAIN DRAINAGE.

AutoCAD SHX Text

NOT USED.

k@ ma xe y-t oo ke y.c om

M ax ey To ok ey

A rch ite cts

L.

L.P

W

. Id ah o S

t. S uit e 2

PH

ON

E:

(2

) 3

-96 htt p:/

/w ww

.m ta@ ma xe y-t oo ke y.c om

Bo ise

, Id ah o 8

9 0 7 6

C-5

12/05/17

AutoCAD SHX Text

POWER VAULT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

EXIST. EDGE OF ROAD

AutoCAD SHX Text

OLD CONCRETE COMM

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text W

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

DRAINAGE INLET (DI)

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

POWER

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

SEWER MANHOLE(SSMH)

AutoCAD SHX Text

COMMUNICATION MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

FOUND ALUMINUM CAP

AutoCAD SHX Text

FOUND PK NAIL

AutoCAD SHX Text

CABLE/COMMUNICATION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

COMM

AutoCAD SHX Text S

AutoCAD SHX Text

5' C0NTOUR LINE

AutoCAD SHX Text

1' CONTOUR LINE

AutoCAD SHX Text

EXISTING EDGE OF PAVEMENT

AutoCAD SHX Text

GAS

AutoCAD SHX Text

NEW EDGE OF PAVEMENT

AutoCAD SHX Text

EXISTING ROADWAY CENTER LINE

AutoCAD SHX Text

PROPOSED ROADWAY CENTER LINE

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text BXRH No.

AutoCAD SHX Text Date:

AutoCAD SHX Text Job No.

AutoCAD SHX Text 1409E

AutoCAD SHX Text

DECEMBER 5, 2017

AutoCAD SHX Text

GOWEN FIELD, BOISE, IDAHO

AutoCAD SHX Text

FOR

AutoCAD SHX Text

MSA ROAD DESIGN

AutoCAD SHX Text

IDAHO AIR NATIONAL GUARD

AutoCAD SHX Text

TYPE "B-3" 100%%% SUBMITTAL

AutoCAD SHX Text 092021

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text

ROADWAY STA. 15+00 - 20+00

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 1" =

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text RETAIN AND PROTECT ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO POWER, WATER, SEWER, COMMUNICATIONS, AND GAS, UNLESS SPECIFICALLY SHOWN OTHERWISE ON PLAN SHEETS. RETAIN AND PROTECT ALL SURVEY MONUMENTS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE OLD TRAFFIC RATED COMMUNICATION BOX. CAP AND MARK SOUTH CONDUIT.

AutoCAD SHX Text

NOT USED.

AutoCAD SHX Text GRADE AROUND EXISTING UTILITIES AND UTILITY LIDS IN DRAINAGE AREA. ADJUST LID HEIGHT AS NECESSARY TO MAINTAIN DRAINAGE.

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE OLD PHONE PEDESTAL.

k@ ma xe y-t oo ke y.c om

M ax ey To ok…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.