EXHIBIT G SBP.docx

DOCX document 18 KB Posted

Attached to
KNMD069215 TFI-F-22 Upgrade Munitions Complex Hawaii Air National Guard Joint Base Pearl Harbor Hickam Hawaii
Solicitation number
W912J6-12-R-0001
Issued by

About this file

EXHIBIT G

View the file

Other files

File Type Posted
W912J6-12-R-0001-0004 AMENDMENT 4.pdf PDF
Q A 01 MAR 2012 1430 hrs.pdf PDF
Q A 01 MAR 2012 1130 hrs.pdf PDF
Q A 01 MAR 2012 1000 hrs.pdf PDF
Q A 29 FEB 2012 1230 hrs.pdf PDF
W912J6-12-R-0001-0002 AMENDMENT 2.pdf PDF
Q A 29 FEB 2012 0430 hrs.pdf PDF
Non-disclosure certificate contractor - Copy.docx DOCX document
AFARS DD.docx DOCX document
Q A 28 FEB 2012 1100 hrs.pdf PDF
Q A 28 FEB 2012 0900 hrs.pdf PDF
W912J6-12-R-0001 AMENDMENT 1.pdf PDF
Q A 27 FEB 2012.pdf PDF
W912J6-12-R-0001-0001 CONFORMED COPY.pdf PDF
Q A 24 FEB 2012.pdf PDF
Q A 21 FEB 2012.pdf PDF
01 - 2012 0217 Addendum1.pdf PDF
READ FIRST-Addendum0001.pdf PDF
02 - 31 63 33 00 REV.pdf PDF
06 - Amended GEE -Revised Micropile Recommendations.pdf PDF
04 - Revised Structural Drawings.pdf PDF
05 - Revised Architectural Drawings.pdf PDF
03 - Revised Civil Drawings.pdf PDF
A-14_PREPROP_SLIDES_MUNITIONS.pdf PDF
PreProposal Sign In Sheet.pdf PDF
Q A 02Feb2012.pdf PDF
Exhibit C SSS Jun 2011.doc DOC document
Exhibit D and E Jan 11.doc DOC document
Exhibit B SSS Jul 10.doc DOC document
EXHIBIT A SSS Jan 11.doc DOC document
Exhibit H TEP Calculation.docx DOCX document
Exhibit J SSS Jul 10.doc DOC document
W912J6-12-R-0001.pdf PDF
Exhibit I TEP Sample.docx DOCX document
EXHIBIT F for forward Pricing.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KNMD069215 TFI-F-22 UPGRADE MUNITIONS COMPLEX W912J6-12-R-0001

EXHIBIT G- Small Business Participation Plan (Format)

The Small Business Participation Plan format is designed to streamline and bring uniformity to responses and evaluations for Small Business Participation (FAR 15.304). The format provides clarity in that it is distinctly different than the Small Business Subcontracting Plan required for large businesses only (FAR 52.219-9). Participation Plans are to be submitted in this format.

Small Business Participation Plan (Format)

All Offerors (both large and small businesses) are required to complete a Small Business Participation Plan. Offerors shall propose the level of participation of small businesses (as a small business prime and/or small business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area.

(a) Check the applicable size and categories for the PRIME offeror only -- Check all applicable boxes:

{ } Large Prime or

{ } Small Business Prime; also categorized as a { } 8(a) or Small Disadvantaged Business { } Woman-Owned Small Business (WOSB) { } Historically Underutilized Zone (HUB Zone) Small Business { } Veteran Owned Small Business (VOSB) { } Service Disabled Veteran Owned Small Business (SDVOSB)

(b) Submit the total combined percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors):

Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.

Total Percentage planned for Large Business(es) _______% = $ _______

Total Percentage planned for Small Business(es) _______% = $ _______ When combined, Large and Small Business totals must equal 100%.

) 100%

(c) Please indicate the total percentage of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:

Example: Victory Prop Mgt (WOSB and SDVOSB) performing 2%; and Williams Group (8(a), HubZ and WOSB) performing 3%. Results equate to: 8(a) 3%; HubZone 3%; WOSB 5%; SDVOSB 2%; VOSB 2%;). SDVOSBs are also VOSBs automatically; however VOSBs are not automatically SDVOSBs.

8(a)_________%
HUB Zone Small Business_________%
Woman Owned Small Business_________%
Service Disabled Veteran Owned SB_________%
Veteran Owned Small Business _________%

(d) List principle supplies/services to be performed by Small Businesses:

Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify.

Name of Company Identify Type of Service/Supply

Small:

8(a):

Women-Owned Small:

HUB Zone Small:

Veteran Owned Small:

Service Disabled Veteran Owned Small:

(e) Describe the extent of commitment to use small businesses (for example, what types of commitments if any are in place for this specific acquisition either – small business prime, written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.)

Additional Important Note for Large Businesses ONLY.

Small Business Sub-Contracting Plan is Required (FAR 52.219-9)

Separate from Small Business Participation Plan, large business offerors must also submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219-7004 if the offeror has a comprehensive subcontracting plan). Large businesses must submit acceptable subcontracting plans to be eligible for award. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan.

File details come from the government source that posted it. Updated .