W912J3-19-B-5001 Replace Boiler B1077
PRE-BID CONFERENCE
DATE: January 24, 2019
Location of Project: Kirtland Air Force Base New Mexico
(NMANG Complex)
INTRODUCTION
• Contracting Officer (KO) – MSgt Edwin Widgeon
• Contracting Officer Representative (COR) – Mr.
Thomas Benton
• Inspector – Mr. Jacoby Duran
SYNOPSIS
• Replace Boiler Building 1077
• Removal and replacement boiler in building 1077 IAW
SOW
• Refer to paragraph 7 of Principal Features in
Attachment 1 – Statement of Work
• Magnitude-$100,000 TO $250,000
• A Firm-fixed Price Contract Will Be Awarded.
• 100% Small Business Set-aside NACIS CODE 238220
• Size Standard $15.0 Million
• Sealed Bid
• Public Bid Opening – 9:00 AM (MST) February 7, 2019.
Classroom of Building 1064 (Same room as pre-bid conference)
SOLICITATION, PLANS
& SPECIFICATIONS
•On The Web - https://www.fbo.gov •Solicitation – W912J3-19-B-5001
•Questions & Answers Document 1 & 2 posted in FBO on January 8 & 11, 2019
•Amendments - No Amendments as of January 24, 2019.
•Check Regularly & Refresh Web Page
•4 Attachments – SOW, Wage Determination, Schedule of Submittals, and Q&A.
Period of Performance
45 Calendar days after the notice to proceed is issued
Receiving The Notice To Proceed
Buy American Act
FAR Clause 52.225-10 – Notice of Buy American Requirement – Construction Material does apply to this IFB
Receiving The Notice To Proceed
DISCLAIMER
The following is a brief overview of the proposal requirements
Offerors Are Strongly Encouraged To Carefully Read The Requirements Of The Solicitation And Comply Accordingly
Review section 10 and section 100 notes before submitting your bid.
Electronic bids (email or fax) are not authorized
Important Reminder
This is a sealed bid there will be no discussions after bid opening.
Offer Guarantee
An offer guarantee is not required for this Invitation for Bid (IFB)
Bonds
Required Bonds:
• Payment Bond is required – 100% of contract value
• Second Payment Protection Required – 100% of contract value
• Refer to full text FAR Clause 52.228-13
• Irrevocable letter of credit
• Tripartite escrow agreement
• Certificates of deposit
• A deposit of the types of security listed in FAR
28.204-1 and FAR 28.204-2
• Performance Bond
WHAT YOU MUST SUBMIT
• Offer, Standard Form (SF) 1442 front and back signed
• Section 00010 Line Items- all items must be priced – There is only one
• Section 00600, Representations and Certifications, completed and return only additional certifications not in SAM.
• When completing the “Offeror” portion of the SF 1442 (Blocks 14 –
20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
• One copy of the SF1442 is required to have an original signature.
• All amendments to the solicitation must be acknowledged.
• Mark the front of the envelope with the following: “BID No. W912J3-
19-B-5001”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
Determination of Responsibility
• The apparent low bid must be determined responsible business in accordance with FAR part 9 prior to award of a contract.
• Proof of financial resources
• Provide at least three references of similar projects.
•This information will be requested after bid opening.
Wage Determination
• The Davis Bacon Act does apply to this
IFB
• Different minimum wages are required for each worker classification. (i.e. electrician, plumber, sheet metal worker, laborer etc.)
• Labor interviews will be conducted during the performance of the contract to ensure workers are making at least minimum wage in their work classification.
• Review Attachment 2 – Wage Determination of the solicitation
• Wage Determination was updated 18 January 2019 – A modification will be issued
Attachments
• Solicitation – W912J3-19-B-5001
• Attachment 1 – Statement of Work
• Attachment 2 – Wage Determination
• Updated WD posted 10 days prior to bid opening.
• Attachment 3 – Schedule of Submittals
• Attachment 4 – Solicitation Questions and Answers
Documents
• All files above are available on the www.fbo.gov website
Bid Opening Time and Date
•Bid Opening: February 7, 2019 at 9:00 AM MST (Classroom of building 1064 same room as pre-bid conference)
• Late bids will not be accepted •Time will be tracked using the following website
• http://www.usno.navy.mil/USNO/time/display-clocks/simpletime
•Bid must be signed by an individual that has authority to contractually bind the company.
Submitting Bids
• Hand carried bids before the bid opening date can be delivered to the Santa Fe Office.
• 47 Bataan Blvd, Building 24, Santa Fe New Mexico, 87508
• Hand carried bids the day of bid opening will be in the same room as the pre-bid conference starting at 8:00 am MTS.
• 2251 Air Guard Road, Building 1064, Classroom, Kirtland
AFB NM 87117. (same room as pre bid conference )
• Email edwin.d.widgeon.mil@mail.mil at least 48 hours in advance if you will be submitting your bid prior to the date of bid opening to get a base pass in Santa Fe.
• Email edwin.d.widgeon.mil@mail.mil at least 48 hours prior to the bid opening to get a base pass in Kirtland AFB.
Award
Will be made to the company with the low bid and has been determined a responsible company in accordance with FAR part 9.
Award will be made to the company that qualifies as a small business under the North American Industry Classification System (NAICS) 238220 – Plumbing, Heating, Air-Conditioning Contractors.
The Size Standard for NAICS 238220 is $15.0 Million
How Questions Will Be Handled
•Questions Must Be Submitted in the format shown in section 0100 notes of the solicitation.
•Submit Questions NLT close of business 7 calendar days prior to bid opening date (31 January 2019) via email to edwin.d.widgeon.mil@mail.mil
• Questions received the deadline may not be addressed or acknowledged.
•Do Not Call anyone in the 150th Civil Engineering
Squadron
Answers To Questions
•All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The FBO Web Site https://www.fbo.gov/
• If Necessary Addendums, Issued By An Amendment, Will Also Be Posted
•Check Web Site Regularly And Don’t Forget To Refresh Web Page
Websites
•www.fbo.gov (to download IFB, SOW, wage Determination, schedule of submittals, and questions and answers document)
•www.sam.gov (be sure you are registered prior to bid opening)
Questions