Pre-Bid_Conference_and_Site_Visit_Questions_and_Answers_Document.pdf
PDF 193 KB Posted
- Attached to
- Building 1077 Boiler Replacement
- Solicitation number
- W912J319B5001
About this file
The pre-bid conference and site visit questions and answers document has been posted
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Conference and Site Visit Questions and Answers Document
29 January 2019
Q1. Are the drawing as built drawings?
A1. Yes
Q2. What kind of drawings is the Government expecting to receive from the contractor after the boiler is replaced?
A2. A set of red line/field drawings
Q3. Can bids be emailed or faxed A3. No, bids must be submitted via mail (USPS, UPS, FEDEX, etc.) or in person. Please refer to section 00100 notes of the solicitation for more information on how to submit bids.
Q4. Why were so many drawing provided in the Questions and Answers 2?
A4. Because contractor will need to properly size existing piping to be able to calculate proper percentage of glycol and complete a test and balance of the system.
Q5. What is the magnitude of this project?
A5. The magnitude is between $100,000 and $250,000
Q6. Will the existing boiler pump be replaced?
A6. Yes, reference paragraph 7 Section B, 9 of Attachment 1 – Statement of Work.
Q7. Will the 3 way pneumatic control check valve be replaced?
A7. Yes, the three way valve will be replaced.
-- End Pre-Bid Conference and Site Visit Questions and Answers --