5011_QA.doc
DOC document 25 KB Posted
- Attached to
- Mass Notification System (Klaxon) Federal contract opportunity
- Solicitation number
- W912J2-18-R-5011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Approx_device_count_and_distances.pdf | ||
| ANGETL_15-01-05_(Electrical_and_Communications_Engineering).pdf | ||
| UFC_3-580-01_(Telecomm_planning).pdf | ||
| Supplemental_Mass_Notification_ANG_CE_Policy_Aug_2005.pdf | ||
| [2018-07-19]_Klaxon_SOW.PDF | ||
| 18R2511_SiteVisitSignIn_20180718.pdf | ||
| 5011_QA.doc | DOC document | |
| 17R2507_SiteVisit_SignInSheet_20170823.pdf | ||
| Combo_Post.pdf | ||
| [2018-06-12]_Klaxon_SOW.PDF | ||
| ARW_Form_11_Visitor_Form.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912J2-18-R-5011 Question and Answer
1. To scale drawings for each facility, dimensions, ceiling and wall materials Drawings will be displayed at the site visit, and provided to the company that is awarded a contract. The government does not intent to provide ISP maps during the solicitation phase of this procurement.
2. Can we re-use any existing wire?
No; all existing video cabling is old/analog, and will need to be replaced by digital (HDMI or equivalent) cabling.
3. Are there cable trays available?
Though several buildings have existing cable trays in major hallways/corridors for holding our bulk ISP cables, none of the rooms involved in this project have cable trays in them for the A/V systems.
4. Are the ceilings hard lid or suspended?
The office spaces have drop ceilings. The hangars are hard lid, with cables running through EMT/conduit.
5. I am enquiring for the tender documentation with the technical requirements for the Mass Notification System at 128th Air Refuelling Wing General Mitchell Field ANG, Milwaukee, WI Unsure what this question is referring to…
6. Any relevant additional documents and site area, drawing materials for instant the plot plan, design drawings / layout, also technical requirements
All respective drawings and data related to the technical requirements available have been posted and shared as part of this solicitation. The UFC and ETL are primarily the technical guides/documents to be used.
7. Requirements for activation / type of alarms live voice messages / prerecorded
Per the SOW, activation must be possible from two locations: B522 CP and B401 MOC. Activation type shall be a customizable tone/audio file that includes both tones and verbal messages. (ie "Beep, beep, beep, klaxon, klaxon, klaxon, beep, beep, beep")
8. Communication link such as, Radio, Fiber Optic, GPRS or landline
Comm link cannot be wireless. Per the SOW, "Limited amounts of government supplied fiber optic and/or copper campus wiring ("OSP") is available between buildings. The exact infrastructure needs of your system shall accompany your proposal, so that the government can ensure we are capable of provided the necessary support."
File details come from the government source that posted it.